Indian Tenders

Tender Notice

TDR 55681170
Tendering Authority Madhyanchal Vidut Vitran Nigam Limited
Tender No NVS-05-14/EDC(G)/2026-27
Tender ID 2026_MVVNL_1153351_7
Tender Brief Corrigendum : Tender For Various Types Of Works Related To Electrification Against The Estimates/Packages To Be Approved At Various Places In The Deposit Scheme Year 2026-27 Under The Area Of ​​Electricity Distribution Subdivision-I, Gonda Under Electricity Distri
City Gonda
State Uttar Pradesh
Document Fees INR 1180 /-
EMD INR 5000.0 /-
Tender Value INR 5 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Various Types Of Works Related To Electrification Against The Estimates/Packages To Be Approved At Various Places In The Deposit Scheme Year 2026-27 Under The Area Of ​​Electricity Distribution Subdivision-I, Gonda Under Electricity Distribution Division-Iv, Gonda.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 19-06-2026 Date Date 22-06-2026
2 16-06-2026 dt.... Date 18-06-2026
3 16-06-2026 dt.... Date 18-06-2026
4 11-06-2026 date extensi Date 15-06-2026
5 11-06-2026 date extensi Date 15-06-2026
6 09-06-2026 date extensio Date 11-06-2026
7 09-06-2026 date extensio Date 11-06-2026
8 04-06-2026 date extension Date 08-06-2026
9 04-06-2026 date extension Date 08-06-2026
10 04-06-2026 date extension Date 08-06-2026

Key Dates

Publish Date 19-06-2026
Last Date of Bid Submission 22-06-2026
Tender Opening Date 23-06-2026

Contact Information

Company Name Madhyanchal Vidut Vitran Nigam Limited
Contact Person SE EDC GONDA
Address EDC GONDA

BOQ Items

Name of Work:- विद्युत वितरण खण्ड-चतुर्थ, गोण्डा के अन्तर्गत विद्युत वितरण उपखण्ड-प्रथम, गोण्डा के क्षेत्रान्तर्गत जमा योजना वर्ष 2026-27 में विभिन्न स्थानों पर स्वीकृत होने वाले प्राक्कलन/पैकेज के विरूद्ध विद्युतीकरण सम्बन्धी विभिन्न प्रकार के कार्य।
Sl. No. Item Description
1All these below items/materials from S.N. 1.01 to 1.09 shall be given and errected by the contractor on his own cost as per estimate/Resspo Norms.
2Holding clamp for TPMO, fuse set, Top, T-off, dropper, DB box etc.
3V-Type X-arm holding clamp
4F-Bracket with clamp
5Nut and bolt off. Size with washer
6LT/Stay/Dead end and other types of Clamps
7LT shackle Insulator
8Stay Insulator
9I hook with clamp for PCC/STP
10Fuse set installed in SMC Box
11(A) CarriageLoading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.18) from Electricity Store Centre, Gonda to the work site/dump site.
1225/63/100 KVA T/F
13250/400 KVA T/F
14PCC/STP Pole
15ACSR Weasal Conductor
16AB Cable of different size
17XLPE Cable of different size
18GI wire 10 swg
19Barbed wire
2033/11 kv disk insulator with Complete fitting
2133/11 KV pin insulator with Pin with Complete fitting
22Stay set complete
23Distribution box Three/Single phase
24TPMO set for 33/11 KV with complete fitting
25D.O. Fuse set for 33/11 KV with complete fitting
26Earthing Rod
27Straight through for 33/11 KV of different size
2833/11 KV CJ kit of different size
29other line material
30(B) Erection1. Any kind of fabrication work including hole in X-arm/clamp etc. shall be done by the contractor at his own cost.2. Fastner including suitable size of washer shall be provided and erected by the contractor at his own cost.3.In case of grouting cement and concrete shall be provided by the contractor at his own cost.
31Erection of single PCC/ST Poles alongwith fitting of all accessories on pole.
32Erection of sectional double PCC/STP pole alongwith fitting of all accessories.
33Earthing of pole with complete fitting
34Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
35Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost.
36Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories.
3725/63/100 KVA T/F
38250/400 KVA T/F
39Laying, Stringing & Sagging of ABC/PVC Cable up to proper sag of different size as per estimate/resspo norms
40Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required)
41Laying, stringing, sagging & binding of XLPE Cable of different size with complete fitting by digging of trench/drill method as per estimate/RESSPO norms.
42Dismentaling of Pole including all accessories installed on Pole
43Dismentaling of old line and carriage scrape to store
44Bore type/Chemical earthing of Pole/Transformer as per Estimate/Resspo Norms(all the material shall be provided by contractor on his own cost.)
45Cutting of tree branches for cleaning route of 11 KV/LT line at the work site
46Carrage of scrap/conductor from site to store
47Guarding of line
48Installation/Errection/Laying/stringing of the following items with complete fitting as per estimate/resspo norms.
49Distribution box with clamp of Single/Three phase
50TPMO set for 33/11 KV with complete fitting
51D.O. Fuse set for 33/11 KV with complete fitting Please Enable Macros to View BoQ information

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download 11.pdf Tender Documents 0 KB
Download BOQ_2160693.xls Tender Documents 0 KB
Download f85c92e8-1bb0-4038-8b13-98e5c336470e.html Tender Documents 0 KB
Download Tendernotice_1.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.