Tendering Authority Public Works Department
Tender No WBPWD/EE/NED/NIQ/e-T/56/(2nd Call)26-27
Tender ID 2026_WBPWD_5014320_1
Tender Brief Corrigendum : Tender For Supply Installation Testing and Commissioning of New 1 Mva Transformer And Allied electrical installation Work At Hospital Area Of Com & Jnm Hospital, Kalyani, Nadia
City Nadia
State West Bengal
Document Fees Refer document
EMD INR 119972.0 /-
Tender Value Refer document
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Supply Installation Testing and Commissioning of New 1 Mva Transformer And Allied electrical installation Work At Hospital Area Of Com & Jnm Hospital, Kalyani, Nadia

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 09-06-2026 Corrigendum Date 16-06-2026

Key Dates

Publish Date 09-06-2026
Last Date of Bid Submission 16-06-2026
Tender Opening Date 18-06-2026

Contact Information

Company Name Public Works Department
Contact Person Executive Engineer
Address Dist Hospital Campus Saktinagar Krishnagar Nadia

BOQ Items

Name of Work:- SITC of new 1 MVA Transformer and allied EI work at Hospital area of COM & JNM Hospital, Kalyani, Nadia
Sl. No. Item Description
1Supply, delivery with installation of 3 Phase, 50 Hz, Delta / Star,1000 KVA, 11/0.415 KV, Cast Resin, dry type, copper wound, Transformer suitable for indoor installation having the following specification as per IS 11171-1985 & IS - 2026 with latest modification (if any) & CBIP Specification [Make: ABB/Schneider/Crompton].Links/Tapings: Off circuit Links, tapping range + 5 % to - 5 %, in steps of 2.5 % Tap position, Cooling: Air Natural (AN), Painting: Epoxy-based (as per IS-5/RAL7032), Vector Group: Dyn 11Flux density 1.7 Tesla at 100% rated voltage, 1.9 Tesla at 112.5% rated voltage. Current density 3 amp/sq. mm for HV & LV winding. Tapping on HV winding off circuit + 5 % to - 10 % in 2.5 % steps. Design Clearances 11 kV system Phase - Phase 180 mm and Phase – Earth 120 mm, 415 V system Phase - Phase 25 mm, Phase – Earth 25 mm.One-minute power frequency withstand voltage: 3 kV for 415 V systems and 28 kV for 11 kV systems. Lightning impulse withstand voltage: 75 kV peak for an 11 kV system. Short Circuit withstand level - Three-phase dead short circuit at secondary terminal with rated voltage maintained on the other side - For 3 sec. Radio Influence Voltage - Maximum 250 microvolts. Harmonic currents - Transformer to be designed for suppression of 3rd, 5th, 7th harmonic voltages and high frequency disturbances.
2Plate/corrugated/tank features: (a) Adequate for meeting mechanical & electrical withstand requirements, as per applicable standard, (b) The tank and its sealing (gaskets, o-rings, etc.) shall be of adequate strength to withstand positive and negative pressures built up inside the tank while the transformer is in operation. The maximum pressure generated inside the tank should not exceed 40kPa, positive or negative, (c) Corrugated fins shall be built up of CRCA sheets of a minimum 2 mm thick.d) The corrugated tank wall shall ensure sufficient cooling of the transformer and compensate for the changes in the oil volume during operation. e) The transformer shall be capable of giving a continuous rated output, without exceeding the specified temperature rise. f) Internal clearance of the tank shall be such that it facilitates easy lifting of the core with coils from the tank and HV & LV bushings mounted on the Top cover.Class of Insulation: Class F, Temp. Rise: 90 °C over ambient of 50°C. Core & Coils: The core shall be built up with high-grade, non-ageing, low-loss, high-permeability, cold-rolled grain-oriented silicon steel laminations, especially suitable for core material. Grade of core should be M4 or better. The coils shall be manufactured from electrolytic copper conductor & fully insulated for rated voltage, coils shall be resin moulded for both LV & HV with epoxy resin, encapsulated, Class F, naturally cooled (AN).
3Core design features:a) Magnetic circuit designed to avoid short circuit paths within core or to the earthed clamping structures.b) Magnetic circuit shall not produce flux components at right angles to the plane of lamination to avoid local heating.c) Least possible air gap and rigid clamping for minimum core loss and noise generation.d) Adequately braced to withstand bolted faults on secondary terminals without mechanical damage and damage/ displacement during transportation and positioning.e) Percentage harmonic potential with the maximum flux density under any condition limited to avoid capacitor overloading in the system.f) All steel sections used for supporting the core shall be thoroughly sand blasted after cutting, drilling, welding.g) Provision of lifting lugs for core coil assembly.h) Supporting framework designed not to obstruct complete drainage of oil from transformerWinding materils: Electrolytic Copper.Maximum Current Density allowed-Maximum 3 amp / sqmm or its better.
4Insulating material shall be proven design & should be selected in such a way that the transformer will be capable of supplying 110 % continuous load. Coils shall be so insulated that impulse & power frequency voltage stresses are minimum. Coil assembly shall be suitably supported between adjacent sections by insulating spacers & barriers.All leads from the windings to the terminal board & bushings shall be rigidly supported to prevent injury from vibration or short circuit stresses. Guide tube shall be used where practicable. The core and coil assembly shall be securely fixed in position so that no shifting or deformation occurs during movement of transformer or under short circuit stresses.Transformer losses shall be guaranteed as below : Maximun loosses at 50 % loading : 2.8 KW Maximun loosses at 100 % loading : 7.25 KW. Transformer losses shall be guaranteed on maximum basis i.e. without any positive tolerance. Efficiency (Minimum): % efficiency at 75 deg C/ unity P.F. a) At 100 % load: 98.56 Impedance: 4.5 % (Allowable tolerance as per IS)% Regulation : a) At 100 % load with Unity PF: 1.22 b) At 100 % load with 0.8 PF: 3.53Testing: All Routine tests as per relevant IS have to be conducted at manufacturer’s works.Terminal arrangement: HV cable box assembly with copper flat & support insulator. LV cable box assembly with copper flat, Aluminium Gland plate & support insulator.
5The Transformer will be of Environmental Class E2 (Minimum), Climatic Class C2 as defined IEC 60076, Fire Behavior Class F1 as defined in IEC 60076-11. All the above i.e. Environmental Class, Climatic Class & Fire Behavior Class must be indicated in rating plate.Enclosure: Sheet steel with protection class IP-33, painting should be epoxy/as per the latest standard. Basic level Insulation for HV: 75 KV pk. Temperature Scanner: Provided with 3 RTDS for sensing winding temperatures along with temperature scanners for display of winding temperature, and with Alarm / Trip contacts.Testing: All Routine Tests as per the relevant IS will be conducted at the manufacturer's works.
6Supply, delivery and installation of LT Cubical type floor-mounted panel board with multi Compartments: one for incoming, one for busbar (Vertical) and others for outgoing MCCBs, made with 14 SWG CRCA Sheet. Cable chambers in the panel should be of adequate width along the vertical height, and the required number of cable chambers to be provided in the panel so that outgoing cables do not pass through any other main switch or bus bar. The Panel should have required lifting hooks. All doors should be hinged type door with a railway-type locking arrangement. A rare cover door should be provided for inspection of the Bus bar and easy cabling. All openings shall be properly gasketed. The panel board should have a proper cable alley on both sides with cable entry at the bottom and detachable Gland Plate. The board should be painted with powder-coated paint. The Panel board consists of the following accessories:
7Incoming : 415 V 415 A on-load front-operated FP Changeover Switch (Make: Schneider /L&T / Siemens) - 1 No.Bus Section: 415 V, 600 A pure copper bus bars for Ph. & N. (Size of bars - 50 mm x 8 mm). The bus bar shall be fixed with FRP chairs & the entire bars are insulated with PVC heat shrinkable sleeves of suitable size & different colours as per norms/direction of E.I.C. All interconnections should be done with appropriately sized copper bars.Outgoing Arrangements: - A) 415 V, 50 HZ, FP, MCCB (Make - Siemens/L&T/Schneider) including spreader link, extended rotary handle with the following ratings and quantity: a) 200 A - 2 Nos., b) 160 A - 2 Nos., c) 63 A - 2 Nos. All SFUs should be connected with the required size/equivalent rating Copper flat(B) 415 V 63 A TPN Contactor (Make: Schneider/L&T/Siemens) - 2 Sets(C) Digital Timer (Make: Schneider/L&T/Siemens) - 2 Sets(D) 415 V 63 A TP Auto-Bypass Toggle Switch - 2 Sets
8Metering, Control & Indication Arrangement :-a) Multifunction Meter Digital Type Load Monitor (Make: Schneider/ABB/Schneider/as per approval from EIC) - 1 Nob) CT, 400/5 A (Make - Kappa/or appeove from EIC) - 3 nos..c) Indicating LED lamp with colour glasses showing Red/Yellow/Blue (Make - Schneider/ ABB/ Siemens / as per approval from EIC) - 6 Sets.d) 6 A SP MCB - 6 nos.(F) Danger Board 16 SWG (16\\" x 12\\") - 2 Nos.All interconnections from incoming to busbar and busbar to outgoings are to be connected with suitable size of Cu bars as per direction of EICThe complete panel board is to be installed on a suitable brick and C-type Iron pedestal as directed by the E.I.C.
9Making a hollow brick wall and an iron C-channel foundation, and brick soiling for installation of the 415 V, 1600/1200 A, LT, cubical panel on that brick foundation, incl. plastering and net cementing the wall and floor as per the direction of EIC.
10Shifting and installation of the existing 1200 A LT panel after disconnection of all outgoing cables (different sizes), reconnecting the same with necessary civil works and all other necessary arrangements as per the direction of EIC.
11Supply & Instn. of Cu Bus Duct setup having 4 nos. of 1600 A Cu Bus Bar separated with FRP Sheet having SS enclosure of size about 600 mm (H) x 300 mm (D) incl. painting & necy. fixing using angle iron and/or MS Clamping arrangement of suitable size as per the direction of EIC
12Supplying & delivery of HT 11 KV (E) Grade 3 core 300 sq. mm circular Armoured Al. XLPE (E) insulated with extruded semi-conducting compound in combination with copper tape, inner sheath of PVC tape armoured & overall PVC sheathed cable (Make: RR Kabel / Gloster / Havells) confirming to IS:7098 / part-II / 2011 with latest amendments.
13Laying of one 3 core 300 sq. mm cable through existing covered masonry trench incl. taking out RC covers, setting them in order, mending good the damage filling the trench with fine dry sand incl. supplying sand. [4(b)/F-3]
14Supplying & fixing of 3 Core 300 sq. mm 11KV XLPE (E) cable termination heat shrinkable end kits 3M (M-seal) make, including S&F heat shrinkable 11KV XLPE (E) cable termination end kits and other necessary materials complete for Indoor & Outdoor termination, also including socketing long barrel type 3 M (M-seal) / Dowels make by crimping method, complete including S & F 11 KV HT tape & necessary materials, also maintain proper method of 11 KV HT kit fixing.
15Supply & delivery of 400 sq. mm single core XLPE insulated & sheathed armoured aluminium conductor cable for working Voltage up to 1100 Volt. [Make - RR Kabel/ GLOSTER/ Havells]
16Laying of one no. 400 sq. mm single-core cable through an open masonry trench. 3(b)/F-1
17Supplying and fixing compression type gland complete with brass gland, brass ring & rubber ring for dust & moisture proof entry of XLPE / PVC armored cables as below Dowels make gland as per GS 4 Core 25 sq. mm [7(c)/F4 ]
184 Core 35 sq. mm [7(c)/F4 ]
194 Core 50 sq. mm [7(c)/F4]
204 Core 70 sq. mm [7(c)/F4]
214 Core 95 sq. mm [7(c)/F4]
224 Core 120 sq. mm [7(c)/F4]
234 Core 150 sq. mm [7(c)/F4]
244 Core 185 sq. mm [7(c)/F4]
254 Core 240 sq. mm [7(c)/F4]
264 Core 300 sq. mm [7(c)/F4]
27Single Core 400 sq. mm
28Finishing of the XLPE / PVC insulated armored cable ends by crimping method incl. supplying & fixing solder less socket (DOWELS) make, tapes, anticorrosive paste & jointing materials as per GS. 4 Core 25 sq. mm [8(b)/F5]
294 Core 35 sq. mm [8(b)/F5 ]
304 Core 50 Sq. mm [8(b)/F5]
314 Core 70 Sq. mm [8(b)/F5]
324 Core 95 Sq. mm [8(b)/F5]
334 Core 120 Sq. mm [8(b)/F5]
344 Core 150 Sq. mm [8(b)/F5]
354 core 185 sq.mm [8(b)/F5]
364 core 240 sq.mm [8(b)/F5]
374 core 300 sq.mm [8(b)/F5]
38Single Core 400 sq. mm
39Earthing with 65 mm dia GI pipe (TATA-Medium) x 3.0 Mts. long and 1 no. 50 mm x 6 mm galvanized (Hot Dip) steel strip (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including finishing both ends by making holes etc. and S & F 65 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. [2(d)/G-1]
40Earthing with 80 mm dia GI pipe (TATA-Medium)x 3.0 Mts. long full length and 1 No. 65 mm x 8 mm galvanized (Hot Dip) steel strip (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including finishing both ends by making holes etc. and S & F 80 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts.
41Extra for providing masonry enclosure on the top of the earth electrode of overall size 86.36 cm x 86.36 cm x 46 cm deep (below Ground level) complete with cemented brick work(1:6) of 25 cm width duly plastered with cement mortar (inside) CI hinged inspection cover of size 36.56 cm x 35.56 cm with locking arrangement, GI reducer including drilling of 46 nos. 12 mm dia holes on the GI pipe.
42Extra treatment of soil by using salt & charcoal for pipe electrode as per G.S. ( To be used / Pipe electrode (2 cement bags, Charcoal & 15 Kg Crystal Salt)
43S & F of earth busbar of galvanized (Hot Dip) MS flat 25 mm x 6 mm on wall having clearance of 6 mm from wall including providing drilled holes on the busbar complete with GI bolts, nuts, washers, spacing insulators etc. as required. [4(a)/G-2]
44Connecting the equipment body to earth bus bar including S&F 20 mm x 3 mm galvanized (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipment incl. drilling holes, with bolts, nuts, washers etc. [5(c)/G-3]
45Supply & fixing earth bus bar of galvanized (Hot dip) MS flat 65 mm x 8 mm on wall having clearance of 6 mm from wall incl. providing drilled holes on the bus bar complete with GI bolts, nuts, washers, spacing insulators etc. as required (for transformer neutral). [G-2/4d]
46Insulating the 65 x 8 mm GI flat incl. S&F black heat shrink PVC sleeves etc. The PVC tube sleeve to be inserted on the GI flat and heat shrieked by heating apparatus by skilled technician carefully without damaging the PVC sleeve as per direction of the EIC (for transformer neutral earth bus bar) (NS)
47Supplying & laying 240 sq. mm. single core multi-strand PVC insulated flexible Cu wire in a suitable size of PVC flexible pipe (reinforced) from neutral earth bus bar to transformer point as required (to be laid 2 nos. in parallel) (for transformer neutral earthing including 2 nos. 240 sq. mm Size Cu. Socket Dowels make. (NS)(gloster/polycab)
48Supply & fixing of earth bus bar of Galv. (Hot dip) M.S. flat of 65 mm x 8 mm on wall having clearance of 6 mm from wall incl. providing drilled holes on the bus bar complete with GI bolts, nuts, washers, spacing insulators etc. as required. [4(d)/G-2]
49Supply & fixing of earth bus bar of Galv. (Hot dip) M.S. flat of 50 mm x 6 mm on the wall, having clearance of 6 mm from wall incl. providing drilled holes on the bus bar complete with GI bolts, nuts, washers, spacing insulators etc. as required. [4(c)/G-2]
50Making testing arrangement and submitting the test report for high voltage testing of specified voltage incl. checking & testing of all HT / LT equipment by authorized firm of Directorate of Electricity & commissioning the installation after obtaining the Approval of Directorate of Electricity. [NS]
51S & F CO2 fire extinguisher (4.5 kg. capacity) (Surex / Fire shield / Max Well) on wall with necessary MS bracket as per G.S. incl. mending good the damages to original finish. [NS]
52S & F of 9.5 litre capacity GI fire bucket painted in red colour with prior coat of red oxide paint and written with white paint FIRE including filling sand etc. on wall with necy. M.S. bracket incl. mending good the damages. [NS]
53S & F best quality FIRST AID BOX (Al. body) as per PWD specification, complete with all the items as required by rule of sub-station on MS bracket incl. damages to original finish. [NS]
54S & F 'shock treatment chart' duly mounted on a wooden frame (approximate front area 1.20 sq. mm) with 5 mm thick glass as required on wall with necessary screws. [NS]
55S & F of safety instruction chart duly mounted on a wooden frame (approximate front area 1.20 sq. mm) with 5 mm thick glass as required on wall with necessary screws. [NS]
56S & D of 11 KV grade Rubber/PVC hand gloves. [NS]
57S & fixing 2 Mt. x 1 Mt. x 12 mm thick rubber mat suitable for 15 KV dielectric strength (Best quality & ISI approved). [NS]
58S & fixing 2 Mt. x 1Mt. x 8 mm thiuck rubber mat suitable for 3.3 KV dielectric strength (Best quality & ISI approved). [NS]
59Providing & fixing of 300 mm x 200 mm x 2 mm thick danger plate on wall made of mild steel, vitreous enameled white on both side with incription in red colour on front side as required
60Providing & fixing of 200 mm x 150 mm x 2 mm thick danger plate on wall made of mild steel, vitreous enameled white on both side with incription in red colour on front side as required
61Supply & fixing 6 mm thick best quality M.S. chequer Plate with lifting hook incl Labour charges for cutting and jointing adjustment for the total Chequer plate incl painting
62Supply & fixing of solid M.S. Bar (Size - 12 mm x 12 mm) incl Painting
63Supply & fixing of MS angle 50 mm X 50 mm X 6 mm with as per required size / length nut bolts & washers incl Painting
64Charges for dismantalling of a 500 KVA Oil type old transformer from existing sub-station building , after disconnection existing connection, deposited the same at COM & JNMH Store, mending good the damages as per direction.
65Supplying & providing one no. three-phase 500 KVA Diesel Generator set (50 HZ) on hire basis at the site, including suitable earthing, connection with suitable wires/cables to the existing electrical panel.
66Supplying & providing one no. three-phase 250 KVA Diesel Generator set (50 HZ) on hire basis at the site, including suitable earthing, connection with suitable wires/cables to the existing electrical panel.
67Providing a knowledgeable Operator with the necessary tools and tackle for the operation of above mentioned Diesel Generator sets for round the clock (3 shifts per day, considering 08 hours per shift) .
68Providing on a hire basis main wiring with 1.1 KV grade 4 x 185 sq. mm Cu conductor PVC insulated cable as required length incl. laying & dismantling the same at the end of function (for 500 KVA DG)
69Supplying and pouring of Diesel for DG Sets Please Enable Macros to View BoQ information

Other Detail

Information Source https://tenders.wb.gov.in/nicgep/app
Download FileName File Description File Size
Download 56ef72f9-cb51-45b7-91ed-1d2ab6dd975a.html Tender Documents 0 KB
Download BOQ_5082353.xls Tender Documents 0 KB
Download form29111.pdf Tender Documents 0 KB
Download Tendernotice_1 (11).pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.