| 1 | The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-Rampur Road Bareilly Approx. distance upto 85 Km. Including safe loading and unloading. |
| 2 | PCC Pole 8.5 Mtr |
| 3 | 33 KV XLPE Cable 3x120 sq mm |
| 4 | ACSR Weasal Conductor |
| 5 | AB Cable 3x50 sqmm |
| 6 | AB Cable 3x95 sqmm |
| 7 | AB Cable 3x120 sqmm |
| 8 | 11/0.4 KV 3 Phase 250 KVA T/F |
| 9 | 11/0.4 KV 3 Phase 100 KVA T/F |
| 10 | 11/0.4 KV 3 Phase 25 KVA T/F |
| 11 | LT Cable 1x400 sqmm |
| 12 | LT Cable 3.5x70 sq mm |
| 13 | 33 KV Cable Box Outdoor 3x120 sqmm |
| 14 | LT Cable 3.5x150 sq mm |
| 15 | 33 KV Post Insulator |
| 16 | 33 KV PT |
| 17 | 33 KV CT |
| 18 | 33 KV Line Isolator |
| 19 | 33 KV Bus Isolator |
| 20 | 33 KV Lightening Arrestor |
| 21 | Battery Set (12 Cell, 2 V, 200AH) |
| 22 | Battery Charger |
| 23 | 33 KV Double Transformer Control Panel |
| 24 | 33 KV VCB |
| 25 | Other Line material i.e., 33 KV & 11 KV pin insulater/stay/earthing complete/Disc Fitting/Disc Insulators/Dropper Channel/Crossing Bracing/ Top Channel/Binding Wire/Danger Board/Barbed Wire/numberplate/stone pad/Control Cable etc |
| 26 | Dismantling and removing of old and used/damaged 33 KV VCB in Control room including opening/cutting of power cable connection and earthing strip with dragging/cartage from control room to J.E. Store. |
| 27 | Erection/Installation of following new panel (VCB) in control room including grouting of Anchor bolt of Panel and making/repairing of pocket for cable to insert in panel from trench and fixing, taping of bus bar with wiring for PT. AC, DC connection including providing of AC & DC Supply. |
| 28 | 33 KV VCB |
| 29 | Providing cutting, fixing and welding of MS Strip from existing, earthing to new 33 KV VCB Complete in all respect, all material shall be arranged by the Contractor. |
| 30 | Construction of T/F plinth 2x2x1 m3 or Minimum 4 Cubic Meter (As per Site Requirement) for mounting 250 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect |
| 31 | Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) or Minimum 200 Sq Feet (As per Site Requirement)by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation. |
| 32 | Pipe Earthing of Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE) |
| 33 | Dismentaling of 100 KVA Transformer as per norms complete in all respect |
| 34 | Mounting of 250 KVA T/F Transformers as per norms complete in all respect - |
| 35 | Mounting of 100 KVA T/F Transformers as per norms complete in all respect - |
| 36 | Mounting of 25 KVA T/F Transformers as per norms complete in all respect - |
| 37 | Fabrication & Installation of 11 KV Fuse set comptele unit to be installed on midway of 11 KV Double Pole Structure Complete in all respect |
| 38 | Installation of LT Fuse Box With SMC Box Complete in all respect |
| 39 | Erection of Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms |
| 40 | PCC Pole 8.5 Mtr (Single) |
| 41 | PCC Pole 8.5 Mtr (Double) |
| 42 | Grouting of following Pole with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms |
| 43 | PCC Pole 8.5 Mtr (Single) |
| 44 | PCC Pole 8.5 Mtr (Double) |
| 45 | Laying of LT Cable 1x400 sq mm complete in all respect |
| 46 | Laying of LT Cable 3.5x70 sq mm complete in all respect |
| 47 | Laying of LT Cable 3.5x150 sq mm complete in all respect |
| 48 | The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms |
| 49 | Laying, Stringing & Sagging of Following Conductor complete in all respect |
| 50 | ACSR Weasal Conductor |
| 51 | AB Cable 3x50 sqmm |
| 52 | AB Cable 3x95 sqmm |
| 53 | AB Cable 3x120 sqmm |
| 54 | The work of digging of pits, erection of Stay Clamp, Insulator etc. |
| 55 | Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. |
| 56 | Fixing of 3 Pahse Distribution Box complete in all respect |
| 57 | Under Ground Laying of 33 KV XLPE Cable 3x120 sqmm by HDD Method as per norms complete in all respect |
| 58 | Under Ground Laying of 33 KV XLPE Cable 3x120 sqmm by Conventional Method as per norms complete in all respect |
| 59 | Laying of 33 KV XLPE Cable 3x120 Sq Mm in the air |
| 60 | Filling of 33 KV Outdoor/Indoor Cable Jointing Kitsuitable for 33 KV 3x120 sqmm XLPE Cable complete in all respect |
| 61 | Supply & Laying of 6\\" dia G Pipe at various places i.e road crossing & Hoisting etc. complete in all respect ((ISO certified GI pipe 150 NB 3 mm thick dia 6\\" would be Provided by contractor at his own cost) |
| 62 | Installation/Errection/Fixing of 33 KV Post Isolator as per norms complete in all respect |
| 63 | Installation/Errection/Fixing of 33 KV PT as per norms complete in all respect |
| 64 | Installation/Errection/Fixing of 33 KV CT as per norms complete in all respect |
| 65 | Installation/Errection/Fixing of 33 KV Bus Isolator as per norms complete in all respect |
| 66 | Installation/Errection/Fixing of 33 KV Line Isolator as per norms complete in all respect |
| 67 | Installation/Errection/Fixing of 33 KV Lightening Arrestor as per norms complete in all respect |
| 68 | Installation/Errection/Fixing of 33 KV Double Transformer Control Panel as per norms complete in all respect |
| 69 | Installation of Battery Set/ Battery Charger as per norms complete in all respect |
| 70 | Fixing of Structure of 33 KV Post Insulator/ 33 KV Line Isolator as per norms complete in all respect |
| 71 | Supply & Fixing of Defective 33 KV Panel Over current Earthfault IDMT Relay with RetroFitting Arrangment as per norms complete in all respect |
| 72 | Supply & Fixing of WTI as per norms complete in all respect |
| 73 | Supply & Fixing of OTI as per norms complete in all respect |
| 74 | Supply and Fixing of Following Material as per RESPO norms complete in all respect (would be Provided by contractor through approved vendors of Discom at his own cost) |
| 75 | Holding Clamp for S/s |
| 76 | LT 'T' Off |
| 77 | PG Clamp |
| 78 | Stone Pad 300x300x75 mm |
| 79 | Danger Board |
| 80 | Barbed Wire |
| 81 | Distribution Box Clamp |
| 82 | Piercing Connector |
| 83 | Cable Holding Clamp |
| 84 | Armoured Control Cable 4x2.5sqmm |
| 85 | LT Shackle Insulator |
| 86 | Cost of Nut & Bolt for Shackle Insulator |
| 87 | LT Clamp with Nut & Bolt |
| 88 | Aluminium Lug 70 sqmm with Nut&Bolt |
| 89 | Aluminium Lug 150 sqmm with Nut&Bolt |
| 90 | Stay Insulator |
| 91 | Stay Clamp |
| 92 | Earthwire Clamp |
| 93 | E Bracket With Nut & Bolt |
| 94 | 11 KV Disc Fitting (45 KN) |
| 95 | Aluminium Lug 400 sqmm |
| 96 | Aluminium Lug 240 sqmm |
| 97 | Tailless Unit Suitable For 250 KVA DT |
| 98 | 11 KV Fuse Set Complete (11 KV DO Fuse Set- 1 Nos, MS Channel 100x50x2028mm-1 No., Holding Clamp with n&B-2 Nos, Al Lug 70 Sqmm-9 Nos) |
| 99 | 3 Phase 4 Wire LT Fuse Box with SMC Box |
| 100 | TC Fuse Wire of Various Size |
| 101 | Safe back carriage of Following item (if any) from work site to C.B. Ganj store Bareilly approx distance upto 85 Km including loading & unloading. |
| 102 | 11/0.4 KV 3 Phase 100 KVA T/F |
| 103 | Scrap Please Enable Macros to View BoQ information |