Tender Brief Corrigendum : Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - In The Area Of Eutd-Ii, Aligarh; Electrical System Or Installation; Buyer - Cartage Of Following Poles Store Centre Or From Any Other Place To The R
City Aligarh
State Uttar Pradesh
Document Fees Refer document
EMD INR 10000.0 /-
Tender Value INR 10 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - In The Area Of Eutd-Ii, Aligarh; Electrical System Or Installation; Buyer - Cartage Of Following Poles Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , 11 Mtrs. St Poles , 09 Mtrs. St Poles , 8.5/9.0 Mtrs.Pcc Poles , Cartage Of Line Material Viz Conductor, Gi Earth Wire, Cross Arm, Channel, Cl S & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. (Dist. 0 To 50 Kms.). , Replacement Of Damaged Pole By Opening Of All Existing Accessories And Conductor From Damaged Pole Properly And Removal Of Damaged Pole And Erect The New Pole At Same Place Including Fixing Of All Existing Accessories And Conductor On The New Pole Etc. As Per Direction Of Supervising Engineer Including The Cost Of All Labour, T&P Etc. (Including Carriage Of Damaged Pole To Je Store/Other Place) Required For Proper Completion Of Work. , 11 Mtrs. St Pole Single Support , 09 Mtrs. St Pole Single Support , 8.5/9.0 Mtrs.Pcc Pole Single Support , 11 Mtrs. St Pole Double Support , Re-Straightening Of Inclined St Poles/Rail By Removing The Soil/Mud From Bottom Side Of The Poles And Re-Straightening With The Help Of Rope, Bamboo Ladder With The Help Of Manpower And Construction Of Round Plinth Around The S.T. Poles / Rails With Cement, Sand And Concrete In 1:3:6 Ratio Of Size 450 Mm. Dia & 600 Mm Height (300 Mm. Under The Ground + 300 Mm. Over The Ground). The Plinth Should Be Plastered With ½ Inch Thick Cement And Sand Of Ratio 1:4 & Taper Rounding The Upper Most Part Of The Plinth, Than After Re-Sagging The Loose Ht/Lt Line Including The Cost Of Material, Labour And T&P Etc. For Completion Of The Above Work Which Will Be Provided By The Contractor At His Own Cost. , Erection, Grouting And Nuzzling Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work As Per Resspo Manual. , Fixing & Connecting Of Earthing Rods As Per Resspo Manual Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Removal Of Existing L.T. Conductor/ L.T. Ab Cable From Damaged Line Including Opening Of Jumpers Etc. As Per Requirement Of Site And It Carriage From Site To Je Store As Per Direction Of Supervising Engineer. , Acsr Dog Conductor , Acsr Weasel Conductor , A. B. Cable (3X50+1X35+1X16 Sq.Mm./ 3X95+1X70+1X16 Sq.Mm/3X120+1X90+1X16 Sq.Mm) , Laying, Sagging, Stringing And Jumpering / Binding Of Following Conductor On The Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Acsr Dog Conductor / Weasel Conductor , A. B. Cable (3X50+1X35+1X16 Sq.Mm./ 3X95+1X70+1X16 Sq.Mm/3X120+1X90+1X16 Sq.Mm) , Digging Of Proper Size Of Pit For Following Work Of Damaged Steel Support With The Provision Of Temporary Support :- Then Reinforcement Of Steel Support By Welding Of 04 Nos. 2 Feet Long M.S. Angle Iron Of 50X50x6 Mm. At Equal Distance Around Each Pole/ Rail & Also Welding Of These Angle Iron With Each Other By Providing M.S. Flat Of Size 35X6 Mm. In Round. After This Construction Of Round Plinth Of Pole Will Be Done With Cement, Sand And Concrete In 1:3:6 Ratio Of Size 450 Mm. Dia & 600 Mm Height (300 Mm. Under The Ground + 300 Mm. The Ground). The Plinth Should Be Plastered With ½ Inch Thick Cement And Sand Of Ratio 1:4 & Taper Rounding The Upper Most Part Of The Plinth. The Rate Will Include All Cost Of Material, Labour And T&P Etc. For Completion Of The Above Work Which Will Be Provided By The Contractor At His Own Cost. , Disconnecting Of Service Cable Of Consumers From Distribution Box Installed At Damage Pole And After Erection New Pole, Than Reconnecting The Service Cable Of Consumers To Distribution Box As Per Direction Of Supervising Engineer. , Dismentling Of Lt Distribution Box From Damaged Pole And Thanafter Erection Of New Pole Fixing Of Lt Distribution Box And Making Connections Of Distribution Box With Lt Mains By Piercing Cl S For Aerial Bunched Cable. , Fabrication Of T-Off Channel As Per Resspo Norms. , Fabrication Of Top Channel As Per Resspo Norms. , Fabrication Of Dropper Channel As Per Resspo Norms. , Fabrication Of T/F Base Channel/Angle As Per Resspo Norms. , Fabrication Of Top Hemper Use For 11 Kv Line As Per Resspo Norms. , Replacement Of Damaged Pin Insulator By New Pin Insulator. , Replacement Of Damaged Disc Insulator By New Discinsulator. , Safe Carriage Of 11 Kv Xlpe Cable Zie 3X70/3X120/3X185/3X300 Sq.Mm. From Store Centre, Aligarh To The Respective Site Of Work Including Cost Of Shifting Of Drum From Inside Of Store, Removing Of Cable From Drum And Re-Rolling Of Extra Removed Cable Including Loading & Unloading At The Respective Ends. Its Laying Including Making Proper Connections At Respective Ends Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work : , Dismantling And Removal Of Existing 33 Kv / 11 Kv Xlpe Cable/ 11 Kv A.B. Cable And Then Stacking In The Respective Je Store/ Store Aligarh As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Filling Of 11 Kv I/D & O/D Cable Jointing Kit As Per Resspo Norms.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 15-06-2026 18-06-2026
2 11-06-2026 15-06-2026
3 08-06-2026 11-06-2026

Key Dates

Publish Date 15-06-2026
Last Date of Bid Submission 18-06-2026
Tender Opening Date 18-06-2026

Contact Information

Company Name Uttar Pradesh Power Corporation Limited
Address 202001,EUDC Lal Diggi Aligarh

BOQ Items

Sl. No. Item TitleItem Description
1Cartage of following poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work.Cartage of following poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work.
211 Mtrs. ST Poles11 Mtrs. ST Poles
309 Mtrs. ST Poles09 Mtrs. ST Poles
48.5/9.0 Mtrs.PCC Poles8.5/9.0 Mtrs.PCC Poles
5Cartage of line material viz Conductor, GI earth wire, Cross Arm, Channel, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).Cartage of line material viz Conductor, GI earth wire, Cross Arm, Channel, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
6Replacement of damaged pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer including the cost of all labour, T&P etc. (including carriage of damaged pole to JE Store/other place) required for proper completion of work.Replacement of damaged pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer including the cost of all labour, T&P etc. (including carriage of damaged pole to JE Store/other place) required for proper completion of work.
711 Mtrs. ST Pole Single Support11 Mtrs. ST Pole Single Support
809 Mtrs. ST Pole Single Support09 Mtrs. ST Pole Single Support
98.5/9.0 Mtrs.PCC Pole Single Support8.5/9.0 Mtrs.PCC Pole Single Support
1011 Mtrs. ST Pole Double Support11 Mtrs. ST Pole Double Support
11Re-straightening of inclined ST Poles/Rail by removing the soil/mud from bottom side of the poles and re-straightening with the help of rope, bamboo ladder with the help of manpower and construction of round plinth around the S.T. Poles / Rails with cement, sand and concrete in 1:3:6 ratio of size 450 mm. dia & 600 mm height (300 mm. under the ground + 300 mm. over the ground). The plinth should be plastered with ½ inch thick cement and sand of ratio 1:4 & taper rounding the upper most part of the plinth, than after re-sagging the loose HT/LT line including the cost of material, labour and T&P etc. for completion of the above work which will be provided by the contractor at his own cost.Re-straightening of inclined ST Poles/Rail by removing the soil/mud from bottom side of the poles and re-straightening with the help of rope, bamboo ladder with the help of manpower and construction of round plinth around the S.T. Poles / Rails with cement, sand and concrete in 1:3:6 ratio of size 450 mm. dia & 600 mm height (300 mm. under the ground + 300 mm. over the ground). The plinth should be plastered with ½ inch thick cement and sand of ratio 1:4 & taper rounding the upper most part of the plinth, than after re-sagging the loose HT/LT line including the cost of material, labour and T&P etc. for completion of the above work which will be provided by the contractor at his own cost.
12Erection, grouting and nuzzling of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.Erection, grouting and nuzzling of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.
13Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work.Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work.
14Removal of existing L.T. conductor/ L.T. AB cable from damaged line including opening of jumpers etc. as per requirement of site and it carriage from site to JE store as per direction of supervising Engineer.Removal of existing L.T. conductor/ L.T. AB cable from damaged line including opening of jumpers etc. as per requirement of site and it carriage from site to JE store as per direction of supervising Engineer.
15ACSR Dog ConductorACSR Dog Conductor
16ACSR Weasel ConductorACSR Weasel Conductor
17A. B. Cable (3x50+1x35+1x16 sq.mm./ 3x95+1x70+1x16 sq.mm/3x120+1x90+1x16 sq.mm)A. B. Cable (3x50+1x35+1x16 sq.mm./ 3x95+1x70+1x16 sq.mm/3x120+1x90+1x16 sq.mm)
18Laying, sagging, stringing and jumpering / binding of following Conductor on the pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.Laying, sagging, stringing and jumpering / binding of following Conductor on the pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
19ACSR Dog Conductor / Weasel ConductorACSR Dog Conductor / Weasel Conductor
20A. B. Cable (3x50+1x35+1x16 sq.mm./ 3x95+1x70+1x16 sq.mm/3x120+1x90+1x16 sq.mm)A. B. Cable (3x50+1x35+1x16 sq.mm./ 3x95+1x70+1x16 sq.mm/3x120+1x90+1x16 sq.mm)
21Digging of proper size of pit for following work of damaged steel support with the provision of temporary support :- Then reinforcement of steel support by welding of 04 Nos. 2 feet long M.S. angle iron of 50x50x6 mm. at equal distance around each pole/ rail & also welding of these angle iron with each other by providing M.S. flat of size 35x6 mm. in round. After this construction of round plinth of pole will be done with cement, sand and concrete in 1:3:6 ratio of size 450 mm. dia & 600 mm height (300 mm. under the ground + 300 mm. the ground). The plinth should be plastered with ½ inch thick cement and sand of ratio 1:4 & taper rounding the upper most part of the plinth. The rate will include all cost of material, labour and T&P etc. for completion of the above work which will be provided by the contractor at his own cost.Digging of proper size of pit for following work of damaged steel support with the provision of temporary support :- Then reinforcement of steel support by welding of 04 Nos. 2 feet long M.S. angle iron of 50x50x6 mm. at equal distance around each pole/ rail & also welding of these angle iron with each other by providing M.S. flat of size 35x6 mm. in round. After this construction of round plinth of pole will be done with cement, sand and concrete in 1:3:6 ratio of size 450 mm. dia & 600 mm height (300 mm. under the ground + 300 mm. the ground). The plinth should be plastered with ½ inch thick cement and sand of ratio 1:4 & taper rounding the upper most part of the plinth. The rate will include all cost of material, labour and T&P etc. for completion of the above work which will be provided by the contractor at his own cost.
22Disconnecting of service cable of consumers from distribution box installed at damage pole and after erection new pole, than reconnecting the service cable of consumers to distribution box as per direction of supervising engineer.Disconnecting of service cable of consumers from distribution box installed at damage pole and after erection new pole, than reconnecting the service cable of consumers to distribution box as per direction of supervising engineer.
23Dismentling of LT Distribution box from damaged pole and thanafter erection of new pole fixing of LT distribution box and making connections of distribution box with LT mains by piercing clamps for Aerial Bunched Cable.Dismentling of LT Distribution box from damaged pole and thanafter erection of new pole fixing of LT distribution box and making connections of distribution box with LT mains by piercing clamps for Aerial Bunched Cable.
24Fabrication of T-off Channel as per RESSPO Norms.Fabrication of T-off Channel as per RESSPO Norms.
25Fabrication of Top Channel as per RESSPO Norms.Fabrication of Top Channel as per RESSPO Norms.
26Fabrication of Dropper Channel as per RESSPO Norms.Fabrication of Dropper Channel as per RESSPO Norms.
27Fabrication of T/F Base Channel/Angle as per RESSPO Norms.Fabrication of T/F Base Channel/Angle as per RESSPO Norms.
28Fabrication of Top Hemper use for 11 Kv line as per RESSPO Norms.Fabrication of Top Hemper use for 11 Kv line as per RESSPO Norms.
29Replacement of damaged Pin Insulator by new Pin Insulator.Replacement of damaged Pin Insulator by new Pin Insulator.
30Replacement of damaged Disc Insulator by new DiscInsulator.Replacement of damaged Disc Insulator by new DiscInsulator.
31Safe carriage of 11 KV XLPE cable zie 3x70/3x120/3x185/3x300 sq.mm. from Store Centre, Aligarh to the respective site of work including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at the respective ends. Its laying including making proper connections at respective ends including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work :Safe carriage of 11 KV XLPE cable zie 3x70/3x120/3x185/3x300 sq.mm. from Store Centre, Aligarh to the respective site of work including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at the respective ends. Its laying including making proper connections at respective ends including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work :
32Dismantling and removal of existing 33 KV / 11 KV XLPE Cable/ 11 KV A.B. Cable and then stacking in the respective JE Store/ Store Aligarh as per direction of Supervising Engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.Dismantling and removal of existing 33 KV / 11 KV XLPE Cable/ 11 KV A.B. Cable and then stacking in the respective JE Store/ Store Aligarh as per direction of Supervising Engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
33Filling of 11 KV I/D & O/D cable jointing kit as per RESSPO Norms.Filling of 11 KV I/D & O/D cable jointing kit as per RESSPO Norms.

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download a04d0cc2-cdd4-4624-9162-a1dec5ef02c9.pdf Tender Documents 0 KB
Download 1779525859.xlsx Tender Documents 0 KB
Download 1779525868.pdf Tender Documents 0 KB
Download 1779525871.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.