| 1 | Fly ash brick masonary in cement mortar (1:6) in superstructure using fly ash bricks of 9\\"/10\\" size having a crushing strength of not less than 35kg/cm2 including splays cutting circular moulding chamfering and corbelling watering and curing after immersing the bricks in water for six hours before use etc., complete including cost and conveyance of all materials and labour required for the work with all taxes and royalties etc. with all T&P complete in all respect as per specification and direction of the Engineer-in-Charge.a). 1st Floor |
| 2 | Fly ash brick masonary in cement mortar (1:4) in superstructure using fly ash bricks of 9\\"/10\\" size having a crushing strength of not less than 35kg/cm2 including splays cutting circular moulding chamfering and corbelling watering and curing after immersing the bricks in water for six hours before use etc., complete including cost and conveyance of all materials and labour required for the work with all taxes and royalties etc. with all T&P complete in all respect as per specification and direction of the Engineer-in-Charge.a). 1st Floor |
| 3 | R.C.C. work in C.C. M-250 using 12 mm to 20mm size (20 mm not be exceed 25%) hard black crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying & compacting concrete watering and curing for 4 weeks including smooth, rigid centering, shuttering & finishing the exposed surface smooth with cost, conveyance, royalities and taxes of all materials and labour, T& P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S rods or tor steel and binding wire and labour charges for straightening, cutting, beinding, binding etc. and tying the grills and placing in proper position as per direction of the Engineer-in-charege.a). Lintel1st Floor |
| 4 | b). Chajja1st Floor |
| 5 | c). Roof Slab1st Floor |
| 6 | d). Column1st Floor |
| 7 | Supplying, fitting and placing HYSD bar reinforcement complete as per drawings and technical specification Clauses 1000 and 1200 of MoRD and as per direction of the Engineer-in-Charge.a). 1st Floor |
| 8 | 12mm (1/2\\") thick cement plaster (1:6) finished smooth to outside brick wall surface after racking out the joint including watering and curring with cost ,conveyance, royality, taxes of all materials and labour with T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-Charge.a). 1st Floor |
| 9 | 16mm (5/8\\") thick cement plaster (1:6) finished smooth to inside brick wall surface after racking out the joints including watering and curing with cost, conveyance, royality, taxes of all materials and labour with T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-Charge.a). 1st Floor |
| 10 | Providng and fixing Vertified tiles in floors treads of steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing with all cost, conveyance, taxes of marble / tiles , labour with T&P required for the work etc. complete as per specification and direction of the Engineer-in-Charge.a). 1st Floor |
| 11 | Providing and fixing Vertified tiles in dados, skirting and riser of steps on 12mm thick cement mortor (1:3) jointed with neat cement slurry mixed with pigments to match the shades of the tiles inlcuding rubbing and polishing with all cost, conveynace, taxes of marble / tiles labour with T& P required for the work etc. complete as per specification and direction of the Engineer-in-Charge.a). 1st Floor |
| 12 | Providing and fixing Ceramic tiles in dados, skirting and riser of steps on 12mm thick cement mortor (1:3) jointed with neat cement slurry mixed with pigments to match the shades of the tiles inlcuding rubbing and polishing with all cost, conveynace, taxes of marble / tiles labour with T& P required for the work etc. complete as per specification and direction of the Engineer-in-Charge.a). 1st Floor |
| 13 | 32 mm piasal wood or local teak wood panelled shutters moulded panels with al labour, iron fittings, and wooden hinged cleats etc. fitted and fixed complete in all respect but excluding the cost of iron fittings with all cost etc. complete.a). 1st Floor |
| 14 | Supplying, fitting and fixing of dressed seasoned sal wood work framed and fixed (wrought & putup) in trusses, purlins, frames, rafters, doors, windows, ventilators and beams including cost, conveyance, taxes with all labour, T&P required for the work etc. complete as per specification and direction of the Engineer-in-Charge.a). 1st Floor |
| 15 | Supplying all materials, laboour, T&P and fittings of good quality plastic door shutters to be made up of selected PVC profiles, the stiles and the rails to be made up of sections measuring 24 x 59 mm. A lock rail to be provided horizontally at the required place for strength and firmness measuring approximately 24 x 100 mm the pannels to be provided of size 200 x 20 mm all four corners to be provided with M.S / Fibre 'L' Angles of the size 200 x 100 mm fitted with steel screws including all hardware fitting etc. all complete as per specification and direction of the E.I.C.a). 1st Floor |
| 16 | Cement washing one coat with cement to new work including scaffolding staging charges with cost, conveyance, taxes of all materials, labour with T&P required for the work etc. complete as per specification and direction of the Engineer-in-Charge. |
| 17 | Finishing walls with weather coat of approved shade on new work/old work two coats to give an even shade including scaffolding, staging charges with cost, convyeyance, taxes of all materials, labour with T&P required for the work etc. complete as per specifiation and direction of the Engineer-in-Charge.a). 1st Floor |
| 18 | Distempering two coats to walls with distemper of approved shade on new work to give an even shade including scaffolding staging charges with cost conveyance, taxes of all materials, labour with T&P required for the work etc. complete as per specification & direction of the Engineer in charge.a). 1st Floor |
| 19 | Finishing wall surface of wall with Acrylic wall putty of approved make and finished smooth and even surface to relive painting including cost of scaffolding staging charges with cost of all materials taxes labour T & P etc. complete. |
| 20 | Providing, fitting and fixing of M.S. Door, M.S Windows, M.S. Grills ,M.S. Grill Gate and Collapsible Gate with top and bottom rails in proper position including making holes in walls, RCC structure and wood work in proper position etc. and making good to the damages to walls or RCC structures including mending, or cutting to sizes or grooves in walls and fixing with CC (1:2:4) with hard black crusher broken granite stone chips of 12mm to 20mm (1/2\\" to 3/4\\") (20mm not to exceed 25% ) with cost ,conveyance, royality, taxes of all materials, labour with T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-Charge.a).1st Floor |
| 21 | Painting two coats with any approved enamel paint to new wood work and iron work including cost of the primer and paint sand papering polishing the surface with cost, conveyance and taxes of all materials and labour with T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-Charge.a). 1st Floor |
| 22 | Supplying , fitting , fixing up Ventilaor (sliding type ) made up aluminium Section 151-154-151-155, as windows frame section No.151-155.151-153 and 151-167 as shutter frame with 5 mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T& P etc. complete as per direction of Engineer in charge. |
| 23 | 20mm(3/4\\") thick grading plaster with cement mortar (1:4) over roof slab after chipping and chiselling the same and cleaning the surface by wire brush laid to proper slope finished smooth to receive tarfelt treatment watering and curring including cost ,conveyance, royality , taxes of all materials and labour with T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-Charge.a). 1st Floor Please Enable Macros to View BoQ information |