| 1 | Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. :- |
| 2 | 250 KVA T/F 11/0.4 KV |
| 3 | 11 KV Fuse Set |
| 4 | LT PVC Cable Al 1x240 sq.mm |
| 5 | LT AB Conductor 3x95+1x70+1x16 sq.mm |
| 6 | Laying, lifting of LT AB Conductor 3x95+1x70+1x16 sq.mm |
| 7 | Laying, lifting of LT PVC Cable Al 1x240 sq.mm |
| 8 | Fixing of 11 KV Fuse Set |
| 9 | Fencing of 250 KVA T/F (As per Respo Schedule) |
| 10 | Providing and Fixing of Water level earthing of 250 KVA T/F (As per Respo Schedule) |
| 11 | Providing and Fixing of Tailless Unit of 250 KVA T/F (As per Respo Schedule) |
| 12 | Making of Plinth 250 KVA T/F (As per Respo Schedule) |
| 13 | Providing and Fixing of Danger board barbed wire including jumper |
| 14 | Providing and Fixing of Copper L-piece 50x225x10mm (LS) |
| 15 | Providing and Fixing of Copper L-piece 62x225x12mm (LS) |
| 16 | Providing and Fixing of Al Lug long barrel off size (LS) |
| 17 | Back Cartage 100 KVA T/F (Old and Used) Site to Store Centre, Meerut |
| 18 | Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. :- |
| 19 | PCC Pole 11 Mtr. Long |
| 20 | PCC Pole 8.5 mtr long |
| 21 | ACSR Weasal Conductor |
| 22 | 11 KV Pin Insulator with pin |
| 23 | 11 KV Disc Insulator with fitting |
| 24 | LT AB Cable 3x95 sq.mm |
| 25 | 250 KVA T/F 11/0.4V |
| 26 | 100 KVA T/F 11/0.4V |
| 27 | 63 KVA T/F 11/0.4V |
| 28 | 11 KV Fuse set |
| 29 | Stay set |
| 30 | Earthing rod |
| 31 | MS Angle 65x65x6 sq.mm |
| 32 | T-off channel |
| 33 | LT XLPE Cable 1x240 sq.mm |
| 34 | 11 KV TPMO |
| 35 | ABC 3x120+1x95+1x16 sq.mm |
| 36 | LT XLPE Cable 3.5x150 sq.mm |
| 37 | Distribution Box 3 phase |
| 38 | Errection PCC Pole 11 mtr long/PCC pole 8.5 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting ratio (1:4:8) of the pole with proper ramming after completion of work. (as per UPPCL Respo). |
| 39 | Errection of Double PCC Pole 11 mtr long/PCC pole 8.5 mtr long after digging a pit of size 1.20x0.60x1.6 mtr in all type of Soil for each pole including grouting ratio (1:4:8) of the pole with proper ramming after completion of work. (as per UPPCL Respo). |
| 40 | Laying, lifting of LT AB Cable 3x95. (As Per Direction of Supervising Engineer). |
| 41 | Laying of ACSR Weasal Conductor for jumpering. (As Per Direction of Supervising Engineer). |
| 42 | Fixing of LT XLPE Cable 1x240 sq.mm (As Per Direction of Supervising Engineer). |
| 43 | Laying of ABC 3x120+1x95+1x16 sq.mm (As Per Direction of Supervising Engineer). |
| 44 | Fixing of LT XLPE Cable 3.5x150 sq.mm (As Per Direction of Supervising Engineer). |
| 45 | Fixing of Stay rod complete as per norms. (As Per Direction of Supervising Engineer). |
| 46 | Fixing of MS Earthing of each 11 KV line and pole after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. (As Per Direction of Supervising Engineer). |
| 47 | Providing and Fixing of MS Nut and Bolts. (As Per Direction of Supervising Engineer). |
| 48 | Providing and Fixing Clamp with nut and bolt (As Per Direction of Supervising Engineer). |
| 49 | Making of New 250 KVA T/F Plinth of size 6'x6'x3' (feet) |
| 50 | New Wiremesh Fencing of 250 KVA T/F. |
| 51 | Water level earthing of 250 KVA T/F |
| 52 | Mounting of 100/63 KVA T/F on double pole |
| 53 | Providing and Fixing of Dropper Channel. (as per UPPCL Respo). |
| 54 | Fixing of 11 KV Fuse Set. (as per UPPCL Respo). |
| 55 | Providing and Fixing of Fixing of Top channel. (as per UPPCL Respo). |
| 56 | Providing and Fixing of Fixing of T-off channel. (as per UPPCL Respo). |
| 57 | Providing and Fixing of Piercing Clamp. (as per UPPCL Respo). |
| 58 | Providing and Fixing of Suspension Clamp. (as per UPPCL Respo). |
| 59 | Providing and Fixing of Dead and Clamp (as per UPPCL Respo). |
| 60 | Grouting of PCC Pole 11 mtr /PCC Pole 8.5 mtr long |
| 61 | Providing and fixing of Stone Pad (as per UPPCL Respo). |
| 62 | Providing and fixing of Tailless Unit (as per UPPCL Respo). |
| 63 | Providing and fixing of Danger Board (as per UPPCL Respo). |
| 64 | Providing and fixing of Copper L-piece 50x225x10mm (LS) |
| 65 | Providing and fixing of Copper L-piece 62x225x12mm (LS) |
| 66 | Grouting of Stay set (As Per Direction of Supervising Engineer). |
| 67 | Providing and Fixing of MS Angle 65x65x6 sq.mm (as per UPPCL Respo). |
| 68 | Fixing of 11 KV Pin Insulator with pin (as per UPPCL Respo). |
| 69 | Fixing of 11 KV Disc Insulator with fitting (as per UPPCL Respo). |
| 70 | Fixing of Distribution box 3 phase (as per UPPCL Respo). |
| 71 | Providing and Fixing of Aluminium lugs 240 sq.mm (as per UPPCL Respo). |
| 72 | Providing and Fixing of LT Shackle Insulator (as per UPPCL Respo). |
| 73 | Providing and Fixing of LT Fuse Box (as per UPPCL Respo). |
| 74 | Fixing of 11 KV TPMO (as per UPPCL Respo). Please Enable Macros to View BoQ information |