| 1 | Earthwork in excavation |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (exceeding 1.5 m in width or 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m as directed by Engineer in charge, All kinds of soil |
| 3 | Demolishing of RCC |
| 4 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 500 metres lead as per direction of Engineer -in-Charge. |
| 5 | Ring casting 2.4m Dia |
| 6 | Casting RCC rings 8 cm thick using cement concrete of specified grade including cost of reinforcement and cost of centering and shuttering for precast ring using 1:11/2:3( 1 cement:11/2 coarse sand:3 graded stone aggregate 20mm nominal size ) for 2400mm Dia Ring,80 mm thick |
| 7 | Carriage of well ring of dia 2.4m |
| 8 | Carriage of well to the actual location for an average of 55m for 2.4m dia,30cm heightand 80mm thick ring |
| 9 | Ring casting 2.8m Dia |
| 10 | Casting RCC rings 8 cm thick using cement concrete of specified grade including cost of reinforcement and cost of centering and shuttering for precast ring using 1:11/2:3( 1 cement:11/2 coarse sand:3 graded stone aggregate 20mm nominal size ) for 2800mm Dia Ring,80 mm thick. |
| 11 | Carriage of ring dia 2.8m |
| 12 | Carriage of well to the actual location for an average of 55m for 2.8m dia,30cm heightand 80mm thick ring |
| 13 | Shoring |
| 14 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m |
| 15 | Dewatering |
| 16 | Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 17 | Soling |
| 18 | Soling with rough stone of size 200 mm, well packed and filling voids with stone chips and required profile with hammer dressed stones having no side less than 15 cm, with minimum depth of 20 cm including preparing the bedding surface etc. all complete |
| 19 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources |
| 20 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources |
| 21 | Steel work |
| 22 | Steel reinforcement for R.C.C work including straightening,cutting,bending,placing in position and binding all complete after applying 2 coats of zinc rich primer.Supply of steel reinforcement will be in the scope of contractor.Thermo mechanically treated bars of grade Fe-500D or more of approved brand as per the instruction of engineer in charge |
| 23 | Centering and shuttering |
| 24 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 25 | Filling available excavated earth |
| 26 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5m |
| 27 | Foundation Plastering |
| 28 | Plastering with 12mm cement plaster of mix 1:4 (1 cement:4 fine sand |
| 29 | Bituminous Painting |
| 30 | Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 31 | Pocket for Bolts |
| 32 | Providing pockets for bolt fixing to suit the base plate of already made as per the direction of the company representatives |
| 33 | Miscellaneous labour |
| 34 | labour of Miscellaneous works Please Enable Macros to View BoQ information |