|
| 1 | Safe cartage of centralised Material from central store to Work Site (Including Loading, Unloading in all Respect) |
| 2 | PCC Pole of 8.5/9 Mtr. |
| 3 | PCC Pole of 11 Mtr. |
| 4 | 100 KVA Transformer |
| 5 | Centeral Material |
| 6 | LT AB Cable(3x50+1x35+1x16) SQ MM |
| 7 | 11 KV (O/G, I/C VCB) |
| 8 | Conductor wire |
| 9 | ABC(3x95+1x70+1x16)/ (3x50+1x35+1x16) |
| 10 | ABC(3x120+1x95+1x16) SQ MM |
| 11 | 11 KV XLPE CABLE 3X300 SQ MM |
| 12 | LT 1x120/1x240/1x400 SQ mm Lead |
| 13 | 33 KV Bus/Line Isoleter 800 Amp |
| 14 | 33 KV LA |
| 15 | 33 KV CT/PT Combind Unit |
| 16 | Digging and Erection 8.5/9 Mtr. PCC pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories (Decentralized Item As Clamp,Nut bolt Angel, Chanal etc will be provide by Contractor) |
| 17 | Digging and Erection 11 Mtr PCC pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories (Decentralized Item As Clamp,Nut bolt Angel, Chanal etc will be provide by Contractor) |
| 18 | Installation of 100 KVA T/F on DP in all respect and energize after complete all work as RESPO Norms.(All required Decentralized material will be Provided by contractor) |
| 19 | Digging and Erection pole with grauting, earthing and Complete work as per RESPO Norms Including all of accessories (Decentralized Item As Clamp,Nut bolt Angel, Chanal etc will be provide by Contractor) |
| 20 | Chemical Earthing work as per requirment of Site & RESPO Norms Including all of accessories (All required Decentralized material will be Provided by contractor for Earthing) |
| 21 | Dismentling of old 11KV & 33 KV VCB/Controle Panal from the control room/Switch Yard including opening of all H.T. cable/ bus-bar form VCB and carriage VCB out Side Control Room/Switch Yard |
| 22 | Shifting of New 11KV VCB/Control Panal from out side to inside the control room/Switch Yard with the help of heavy duty crene and its instalation with grouting with anchor bolts. |
| 23 | Making the bus-bar connection of VCB and making connection of H.T. Cable with VCB and proper insulation of bus-bar and making the connection of 33KV & 11 KV VCB etc, completely in all respect. |
| 24 | Water Level Earthing |
| 25 | Providing and Fixing Tail Less Unit on DT under EDD Khatauli |
| 26 | Construction of Plinth in all respect According RESPO Norms of size 2x2x1.5 m (All required Decentralized material will be Provided by contractor for Construction of Plinth) |
| 27 | Work of Plinth Repairing with Put TF on Safe Side with enerzation and After Mantinance of Plinth Put TF on Repaired Pinth and Enerzied (All required Decentralized material will be Provided by contractor for Construction of Plinth) |
| 28 | According RESPO Norms Wire Mesh Fencing size of 2x2x1.5 for Distributan T/F (All required Decentralized material will be Provided by contractor for Fancing) |
| 29 | Dismantling Dp Charges |
| 30 | Work for Gaurding of 11 KV Line. (Decentralized Item As Nut Bolt, Clamp, Angel will be provide by Contractor) |
| 31 | Instalation of LT Distribution Box (Decentralized Item As Nut Bolt, Piercing Connector, Connecting Lead 1x16 mm will be provide by Contractor) |
| 32 | Open Jar Jar Rabit/ Weasal/ABC from Pole, Lay down and collect safly |
| 33 | Work of Spread ABC, mounting and tying the wire on the pole with installation of all necessary line Item properly as RESPO Norms. (Decentralized Item As Nut Bolt, ALL Type Clamp, J huk, Angel will be provide by Contractor) |
| 34 | Work of Spread Wiseal, mounting and tying the wire on the pole with installation of all necessary line Item properly as RESPO Norms (Decentralized Item As Nut Bolt, Clamp will be provide by Contractor) |
| 35 | Rabit |
| 36 | Work for Earthing of Pole With MS Earthing Road |
| 37 | Work for Laying of 11KV XLPE cable as RESPO Norms(Decentralized Item as Bricks, Sand etc will be provided by Contractor) |
| 38 | Work for Laying of 33 KV XLPE cable After digging tranch RESPO Norms(Decentralized Item as Bricks, Sand etc will be provided by Contractor) |
| 39 | Providing of HDPE Pipe and work for Pass 33 KV XLPE cable Through Pipe Under Ground of Road by Hammer Injury Method. (Decentralized Item will be provided by Contractor) |
| 40 | Providing and Fixing GI Pipe 6\\" Dia and Pass XLPE Cable through it. |
| 41 | Work For Installation of Indoor/Outdoor Cable Jointing Kits as RESPO Norms on 33 kV XLPE Cable(Decentralised Item provided by Contrector) |
| 42 | According RESPO Norms Instalation Stay Set |
| 43 | Work for Concerting of Stay (All Item As Cement, Sand etc for Concreting will be provided by Contractor) |
| 44 | According RESPO Norms Installation of danger board on pole(All required Decentralized material will be Provided by contractor) |
| 45 | According RESPO Norms Installation of barbed wire on pole(All required Decentralized material will be Provided by contractor) |
| 46 | According RESPO Norms Instalation 11 KV Fuse Set (All required Decentralized material as Nut bolt, Clamp, Chanal will be Provided by contractor for Fuse Set) |
| 47 | According RESPO Norms Instalation LT Fuse Set (All required Decentralized material as Nut bolt, Clamp etc will be Provided by contractor for Fuse Set) |
| 48 | According RESPO Norms Earthing of Pole by MS earthing |
| 49 | Work for Prepare Structure for CT/PT/LA Units ( Grouting of Pole and All Decentralize Material Will Be Provided by Contrector,) |
| 50 | Instalation of Bus/Line Isoleter 800 Amp 33 KV ( All Decentralize Material Will Be Provided by Contrector) |
| 51 | Work for Replplacement/Instalation of 33 KV LA/CT/PT Unit and CT/PT Combind Unit |
| 52 | Providing and Fixing 4x25 mm2 Control Cable in for Control Panel |
| 53 | Received Back Old/Damaged Material from Site to Store (Including Loading, Unloading, Cartage in all respect) |
| 54 | 33KV/11 VCB/Control Panel |
| 55 | Iron Material |
| 56 | Conductor Wire Please Enable Macros to View BoQ information |