| 1 | Demolishing brick work manually/ by mechanical means, at all heights, including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 2 | Dismantling steel/ wooden frame of doors, windows and ventilator including shutter, chowkhats, architrave, holdfasts etc. from all heights complete and stacking within 50 metres lead. |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 4 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. |
| 5 | Providing and fixing factory made uPVC half glazed door, of Rehau/ Fenesta/ Veka make, at all levels made out of all fittings and fixing at site and sealing of gaps as per the designs & specifications narrated below and as per direction of Engineer-in-charge, all complete comprising of the following:uPVC multi-chambered extruded profiles, comprising frame, mullion and sash (nos as per requirement), all having minimum wall thickness 2.2 mm +/- 0.5mm and galzing bead of appropriate dimension; Glass: 6 mm toughened glass with make of Saint Gobin or equivalent;GI Reinforcement: All the profile sections should be reinforced with GI sheet of 2.5mm +/- 0.5 mm thickness (shape & size according to uPVC profile). The reinforcement must have cleared a 20 days Salty Spray Test as per ASTM-B-117 guidelines from any testing agency as decided by Engineer-in-charge;Installation: The door must be aligned in plumb and water level and installed to the sill using high quality steel fasteners (stainless steel (SS-304 grade)). This item shall also include providing and fixing Pre laminated (both sides) fibre board of grade -1 MDF of18mm thickness conforming to IS 14587 with necesssary arrangements like screws and edge sealants. The outer frame and sill must be sealed with proper sealants by a skilled contractor and all accessories necessary for the fittings like EPDM gasket, SS fasteners etc. shall be brought by the contractor. Installation must carry a manufacturing warranty for a period of 10 years against manufacturing defects and 15 years for leak proof installation.Profile of frame, mullion and sash shall be conforming to technical specifications as mentioned in doc no: 32687-12-DA-009. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing or as per direction of Engineer-In-Charge. Installations shall also include fixing handles/hooks/door closers for smooth operation and cutting and re-doing plastering work, as necessary on site as per direction of Engineer-In-Charge; All complete in the pattern and dimensions as per architectural drawings and as per direction of Engineer-in charge. Note: For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Minimum profile width shall be 50mm. Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made. |
| 6 | Providing and fixing factory made uPVC glazed door, of Rehau/ Fenesta/ Veka make, at all levels made out of all fittings and fixing at site and sealing of gaps as per the designs & specifications narrated below and as per direction of Engineer-in-charge, all complete comprising of the following:uPVC multi-chambered extruded profiles, comprising frame, mullion and sash (nos as per requirement), all having minimum wall thickness 2.2 mm +/- 0.5mm and glazing bead of appropriate dimension; Glass: 6 mm toughened glass with make of Saint Gobin or equivalent;GI Reinforcement: All the profile sections should be reinforced with GI sheet of 2.5mm +/- 0.5 mm thickness (shape & size according to uPVC profile). The reinforcement must have cleared a 20 days Salty Spray Test as per ASTM-B-117 guidelines from any testing agency as decided by Engineer-in-charge;Installation: The door must be aligned in plumb and water level and installed to the sill using high quality steel fasteners (stainless steel (SS-304 grade)). The outer frame and sill must be sealed with proper sealants by a skilled contractor and all accessories necessary for the fittings like EPDM gasket, SS fasteners etc. shall be brought by the contractor. Installation must carry a manufacturing warranty for a period of 10 years against manufacturing defects and 15 years for leak proof installation.Profile of frame, mullion and sash shall be conforming to technical specifications as mentioned in doc no: 32687-12-DA-009 After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing or as per direction of Engineer-In-Charge. Installations shall also include fixing handles/hooks/door closers for smooth operation and cutting and re-doing plastering work, as necessary on site as per direction of Engineer In-Charge; All complete in the pattern and dimensions as per architectural drawings and as per direction of Engineer-in charge. Note: For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Minimum profile width shall be 50mm. Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made. |
| 7 | Providing and fixing at all levels factory made UPVC fixed glazing windows (Rehau/ Fenesta/ Veka), made of extruded multiple chamber profiles of outer wall thickness of 2.0 mm +/- 0.5mm for mullion/sash/main frame etc as per requirement, having mitred cut and fusion welded at all corners, fixing 4 mm thick annealed glass shutter (ST450 BLUE GREEN (COOL-LITE series of saint gobain india or eqvt)) with glazing beads and gasket made of EPDM (Ethylene propylene diene monomer) with double sealing and applying Silicone sealant outside(multipurpose) and acrylic sealant inside and fitted with multipoint espag locking system including drilling of holes for fixing of hardware. Main chamber shall be reinforced with 2.0±0.5mm thick galvanised steel and frame shall be fixed to the wall with 8mmx100mm long fasteners including providing and fixing all fittings of stainless steel (SS-304 grade) including necessary stainless steel screws, etc. complete as per direction of Engineer-in-charge. (Payment shall be for the outer area of window openings provided). Installation must carry a manufacturing warranty for a period of 10 years against manufacturing defects and 15 years for leak proof installation. Profile of frame, mullion and sash shall be conforming to technical specifications as mentioned in doc no: 32687-12-DA-009 After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing or as per direction of Engineer-In-Charge. Installations shall also include fixing handles/hooks/door closers for smooth operation and cutting and re-doing plastering work, as necessary on site as per direction of Engineer-In-Charge; All complete in the pattern and dimensions as per architectural drawings and as per direction of Engineer-in charge.Note: For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Minimum profile width shall be 50mm. Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made. |
| 8 | Providing and fixing at all levels factory made UPVC Casement windows (Rehau/ Fenesta/ Veka), made of extruded multiple chamber profiles of outer wall thickness of 2.0 mm +/- 0.5mm for mullion/sash/main frame etc as per requirement, having mitred cut and fusion welded at all corners, fixing 4 mm thick annealed glass shutter (ST450 BLUE GREEN (COOL-LITE series of saint gobain india or eqvt)) with glazing beads and gasket made of EPDM (Ethylene propylene diene monomer) with double sealing and applying Silicone sealant outside(multipurpose) and acrylic sealant inside and fitted with multipoint espag locking system including drilling of holes for fixing of hardware. Main chamber shall be reinforced with 2.0±0.5mm thick galvanised steel and frame shall be fixed to the wall with 8mmx100mm long fasteners including providing and fixing all fittings of stainless steel (SS-304 grade) including necessary stainless steel screws, etc. complete as per direction of Engineer-in-charge. (Payment shall be for the outer area of window openings provided). Installation must carry a manufacturing warranty for a period of 10 years against manufacturing defects and 15 years for leak proof installation. Profile of frame, mullion and sash shall be conforming to technical specifications as mentioned in doc no: 32687-12-DA-009 After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing or as per direction of Engineer-In-Charge. Installations shall also include fixing handles/hooks/ closers for smooth operation and cutting and re doing plastering work, as necessary on site as per direction of Engineer-In-Charge; All complete in the pattern and dimensions as per architectural drawings and as per direction of Engineer-in charge.Note: For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Minimum profile width shall be 50mm. Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made. |
| 9 | Providing and fixing Polyester powder coated aluminium (minimum thickness of polyester powder coating 50 micron) work for sliding ventilators with the following units :1. Fixed frame : Extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.2. Shutter : providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required.3. Sheeting: Providing and fixing 6mm thick acrylic cheet (clear) in ventilator shutters with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-incharge.4. Handle bar: Providing and fixing Polyester powder coated aluminium tubular 3.0 mm thick & 2100 mm long handle bar with direction of Engineer-in-Charge.All Fittings, fasteners etc. needed for complete and smooth operation of sliding ventilator frame shall be paid in this item only. Additional weatherseal beading shall be provided on the exterior face of ventilators to arrest water ingress towards conveyor interiors and the rate shall be quoted inclusive of the same. |
| 10 | 15 mm cement plaster on both sides of single or half brick wall of mix :1:4 (1 cement: 4 fine sand) at all heights. |
| 11 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 12 | Applying one coat of water thinnable cement primer on wall surface having VOC content less than 50 grams/litre at all heights. |
| 13 | Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over priming coat of exterior primer) at all heights. |
| 14 | Repairs to plaster of thickness 12 mm to 20 mm in patches, with cement mortar 1:4 (1 cement : 4 fine sand), including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer- in-Charge. |
| 15 | Removing corrosion of steel reinforcement by mechanical means like wire brushing, chipping to remove loose dust and applying rust removal solution \\"Reebaklens RR\\" by M/s FOSROC Chemicals or equivalent by using brush/spray application, leaving the surfaces for at least 15 to 30 minutes, then removing the loose materials by scrubbing or with brush and applying epoxy bond to the old concrete surface before applying Polymer repair mortar. |
| 16 | Supply and application of anti corrosive chemicals with one or more coats of \\"NITO Zinc Primer\\" by M/s FOSROC Chemicals or equivalent over the exposed steel reinforcement as per manufactures specification including removing the rust, scales with wire brush/emery cloth or by mechanical buffing wheel/air and water jet etc at all heights including all materials and labour charge as per the instruction of Engineer in charge (EiC). |
| 17 | Providing and laying 25 mm average thick polymer modified latex mortar like \\"RENDROC SP40\\" of M/S FOSROC chemicals or equivalent with poly propylene fibers as per the manufacturers specification over the concrete surface roughened by chipping followed by water jetting including filling the crevices/ undulations flushing with adjacent surface curing etc., concrete at all heights including all material and labour charges and all as directed by EiC. And curing the surface by spraying water curing compound, \\"Concure WB\\" manufactured by M/s FOSROC Chemicals or equivalent. |
| 18 | Wall painting two coats with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour to achieve even shade and colour at all heights including cost of all labour and materials charges. |
| 19 | Supply of skilled Labours on daily basis including necessary minor tools and plant for execution of maintenance works as directed. All labour and minimum essential tools etc. complete for 8 hours per day. |
| 20 | Supply of unskilled Labours on daily basis including necessary minor tools and plant for execution of maintenance works as directed. All labour and minimum essential tools etc. complete for 8 hours per day. |
| 21 | Brick work with common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6 coarse sand) at all heights. |
| 22 | Making the opening in brick masonry including dismantling in floor or walls by cutting masonry and making good the damages to walls and jambs complete, to match existing surface i/c disposal of mulba/ rubbish to the approved dumping ground, all complete as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |