| 1 | Improvement works with allied Civil works |
| 2 | Removal of existing paver block flooring including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. |
| 3 | Dismantling of existing concrete road including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. |
| 4 | Earth work excavating and depositing on bank with intial lead of 10 m & intial lift of 2 m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation as per the direction of the Engineer with standard specifications.HGS SS.20.B. |
| 5 | Dismantling of existing RCC sunshade including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. |
| 6 | Supplying and fixing Good quality of 50mm dia GI pipe - 'B' class, including cutting, threading and cost of all special fixtures labour, lead, lift etc., complete. |
| 7 | Supplying and fixing Good quality of CPVC (Chlorinated Poly Vinyl Chloride) pipe (Lesser pressure rating with lesser pipe thikcness) Standard dimension ratio 13.50in position of 25mm dia. CPVC pipe from the approved manufacturer etc., confirming to IS 4985 of 1968, 4984 of 1970 including cost of all special fixtures labour, lead, lift etc., complete. |
| 8 | Supply and fixing of 2000 litre capacity PVC tank of approved quality [white colour Three layer] including cost of all materials labour,lead,lift,etc,complete. |
| 9 | Supplying and fixing of CPVC Control valve (25mm) with accessories complete. |
| 10 | Refilling of excavated soil with intial lead of 10 m & intial lift of 2 m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation as per the direction of the Engineer with standard specifications. |
| 11 | Providing Plain Cement Concrete 1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete. |
| 12 | Providing Plain Cement Concrete 1:2:4 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete. |
| 13 | Plastering with cement mortar 1:3, 10mm thick over RCC area at all levels, including cost of all materials, lead, lift, labour, T&P, curing, etc., complete. |
| 14 | Chipping of the concrete and roughening the surface without any damage to the concrete portion including cost for clearing the debris, all labourers, hire charges for tools needed safety including cost for clearing the debiris, all labourers, hire charges for tools needs safety arrangements all leads, lifts etc. Complete. |
| 15 | Providing double Plastering with Cement mortar in CM 1:3 mixed with conplast 150 ml/bag of cement and some admixtures such as reebacklenss RR for removing the rust from the existing reinforcement,NITOZING primer for bonding agent to ceiling portion 12mm thick after cleaning the chipping area including cost of all materials lead, lift etc complete. (Double plastering) |
| 16 | Clean removal of cement plaster from existing inner wall sides and removing of cement plaster wastages from premises as directed by the site engineer including cost of all labours, materials, lead, lift, etc., complete. |
| 17 | Plastering with cement mortar 1:5, 12mm thick for inner & outer wall surface (at cracked area) all levels, including cost of all materials, lead, lift, labour, T&P, curing, etc., complete. |
| 18 | White washing two coats with White cement approved quality over a primary coat over plastered surfaces including cost of all materials, lead, lift, etc., complete. |
| 19 | Providing two legged scaffolding using 15 m blue composter causrino posts or best quality bamboo posts of 4m overall length (3.0m height +0.5m projection + 0.5 m into the ground) the distance between the two rows with horizontal posts with 0.50 m over tab on either side and places @ 2m c/c including longitudinal and transverse middle places to setup and providing a platform with country wood planks of 40 mm tk 1m wide etc complete from using coil and nails 1m run. |
| 20 | GST fo bidders within Tamilnadu. Heading |
| 21 | GST fo bidders within Tamilnadu. Heading |
| 22 | IGST Please Enable Macros to View BoQ information |