Name of Work:- Reconstruction of HCL tank foundation at D.M. plant, DCRTPP Yamunanagar | Sl. No. | Item Description | |
| 1 | HSR Item 6.33.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | | 2 | HSR Item 6.34.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. | | 3 | HSR Item 11.73.2-Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. 2. On concrete work | | 4 | HSR Item 6.25.1 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level | | 5 | HSR Item 6 25.2-Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 2. All works above plinth level up to floor IV level | | 6 | HSR Item 5 43.1-Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. 1. For thickness of tiles 10 mm to 25 mm | | 7 | HSR Item 5.25-Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | | 8 | HSR Item 11.4.2-10 mm thick cement plaster 2. 1:3 (1 cement: 3 fine sand) | | 9 | HSR Item 6.29.1-Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns | | 10 | HSR Item 6.29.3-Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts | | 11 | HSR Item 6.1.6-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm nominal size) | | 12 | HSR Item 4.12.1-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil | | 13 | HSR Item 6.30.5-Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers | | 14 | HSR Item 10.101-Providing and laying Epoxy Flooring 2mm thick ( overall thickness) with self levelling with Hi-build epoxy primer 100 micron thickness, self leveling epoxy screed 900 micron thickness, FQ sand and self levelling epoxy top coat having thickness 1000 micrones with all materials as mentioned / required to provide desired finish to the entire satisfaction of the Engineer in charge Please Enable Macros to View BoQ information |
|