|
| 1 | PART A: (MANDATORY JOB) |
| 2 | PART A: (MANDATORY JOB) Monthly Normal visit For Goods Elevator and Passenger Elevator |
| 3 | PART A: (MANDATORY JOB) Overhauling of motor and gearbox |
| 4 | PART A: (MANDATORY JOB) Car and Counter Weight sheave Bearing Change (Bearing to be supplied by DPL). |
| 5 | PART A: (MANDATORY JOB) Supply and replacement of Door Rollers |
| 6 | PART A: (MANDATORY JOB) Supply and replacement of Guide Shoe. |
| 7 | PART A: (MANDATORY JOB) Lubrication of rope with supply of lubricant by party |
| 8 | PART B ( Optional Job) |
| 9 | PART B ( Optional Job to be executed on as and when required basis): Emergency visits (on call basis) |
| 10 | PART B ( Optional Job to be executed on as and when required basis): Replacement of car door and landing doors as and when required basis (material will be supplied by DPL) |
| 11 | PART B ( Optional Job to be executed on as and when required basis) Replacement of rope as and when required basis (only rope will be supplied by DPL, other allied materials required for completion of job will be supplied by the successful bidder) |
| 12 | PART B ( Optional Job to be executed on as and when required basis) Supply and Replacement of trailing cable as and when required basis (material will be supplied by Party) |
| 13 | PART B ( Optional Job to be executed on as and when required basis) Replacement of motors and other allied part in case of breakdown (material will be supplied by DPL) |
| 14 | PART B ( Optional Job to be executed on as and when required basis) Supply and Replacement of Door Sensor in case of breakdown |
| 15 | PART B ( Optional Job to be executed on as and when required basis) Repairing of Logic Board if defect found |
| 16 | PART B ( Optional Job to be executed on as and when required basis) Repairing of Door Operator if defect found |
| 17 | PART B ( Optional Job to be executed on as and when required basis): Repairing of Controller if defect found |
| 18 | PART B ( Optional Job to be executed on as and when required basis): Supply and Replacement of Encoder in case of breakdown |
| 19 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of new COP |
| 20 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of new LOPs in seven segment/dot-matrix along with buttons if defect found |
| 21 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of New Reed switch with bracket if defect found |
| 22 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of New limit switch if defect found |
| 23 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of level switch if defect found |
| 24 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of door shoe if defect found |
| 25 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of display card passenger lift if defect found |
| 26 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of disply card goods lift if defect found |
| 27 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of landing gate air card if defect found |
| 28 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of contactor if defect found |
| 29 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of SMPS if defect found |
| 30 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of 3 phase preventer passenger lift if defect found |
| 31 | PART B ( Optional Job to be executed on as and when required basis): Supply and replacement of 3 phase preventer goods lift if defect found Please Enable Macros to View BoQ information |