| 1 | Supply installation testing & Commissioning of high mast lighting system (as per PLG 07 of ILP UK techinical report no 7 of ILE UK /IS:875 Part-1 – 2015//BSEN10025/and IS:2062 )consisting of totally hot dip galvanised by piecewise single dipped method high mast, lantern carriage suitable for up to 12 nos luminaries with welded arm (excluding luminares), mast head frame assembly with full cover, including 1 No. LED 15 Watts aviation obstruction lights, double drum type self sustaining winch, integral power tool accesible from door with padlocking arrangement (winch motor with control circuit) hot dipped galvanised heavy duty pipe lightening finial, Stainless steel 6 mm dia. wire ropes (AISI 316, 7 / 19 costruction 3 no. rope for lantern carrage & 2 no. rope for winch assembly ) foundation bolt, torque limiter,EPR insulated PCP sheathed 5 core x 2.5 Sq.mm trailing cable, including outdoor type control panel for auto on / off, reverse / forward motor operation. The mast is constructed from mild steel plates (as per IS 5986 Gr. 510 ) cut and folded to form a polygonal section, telescopic jointed and welding as per BS 5135.etc. as required on Existing Foundation. ( See table P - 03 for specs.) OEM Must have Type test certificate for wind tunnel test . All as per pre approved by Engineer in-charge. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 2 | 16.0 Mtr HM (in 2 section) suitable for 9 No. Luminaries |
| 3 | Providing & Fixing of IK08 IP-66 protected high power LED flood light system with single piece Pressure diecast aluminium housing, toughened glass diffuser with suitable lenses on LED to achieve various beam angles, of high power LED of 3 to 5 watt each . Integrated potted driver as a unique BIS R number having efficiency more than 85 % and in compliance to BIS certified and Trade mark certificate. The System level Luminaire efficacy >=125 lm/ wt. LED driver Input Voltage AC 120 to 270 V AC with High voltage Cutoff @>=300 V AC and Auto resetting Safety .Power Factor >0.95 , THD(I) <10% , driver current <=750mA. driver should be Phase to phase protection of 440 V for 4 Hrs. Electrical Connector , Surge Protection Min >=4KV internal and 10KV external but inside driver compartment, System life of 50000 Burning hours with 70% of Initial Lumens maintained, CRI>70 and CCT 5700K ±355K. Manufactures Word Mark/Name Engraved/Embossing/Screen printing on die cast housing to allow traceability/authenticity. Fixture shall be IS 10322 Complianced.OEM Must have its own in house NABL lab setup for all testing facilities for LED fixtures. (LM79/LM80) Certificate/ report with liable warranty of product/accessories from OEM shall be submitted. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 4 | High Power LED Flood Light Minimum lumen output 30000 lm |
| 5 | Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed Arrmoured Aluminium cable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV with H4- Grade electrolytic aluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831 in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) including testing etc. as required of following size. OEM must have it's own in house NABL accrediated Laboratory for testing procedure as per IS:10810.For additional technical parameters of product / work refer Annexure 'A' attached with this BSR |
| 6 | 25.0 Sq. mm 3.5 core |
| 7 | Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed Armoured Copper cable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV with electrolytic grade Copper made of copper rods confirming to IS 613-1964, of purity >99.7 %, round / flat strip armouring, Inner / outer sheath confirming to IS:5831 in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) including testing etc. as required of following size. OEM must have it's own in house NABL accrediated Laboratory for testing procedure as per IS:10810 For additional technical parameters of product / work refer Annexure 'A' attached with this BSR |
| 8 | 6 Sq. mm 3 Core |
| 9 | Plate Earthing as per IS:3043 with copper Earth plate of purity >95% of size 600mm x 600mm x 3.0mm by embodying 3 mtr. below the ground level with 20 mm dia. G.I. 'B' class watering Pipe ,including all accessories like nut, bolts, reducer, nipple, wire meshed funnel, and Heavy duty weather proof poly-propylene earth pit chamber with lockable Jam free lid suitable for safe working load 5000 Kg or more of size Top Dia. 225 to 260 mm, Bottom Dia 300 to 350 mm. and Height 250 to 300 mm. and embodying the pipe complete with alternate layers salt and coke/ charcoal, testing of earth resistance for value of 5 ohms or less as required & must record by engineer in-charge during site visit and ensure to enter in measurment book. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 10 | Supply & Laying following size earth strip in horizontal or vertical run in surface by means of Earth strip DMC Insulator including riveting/ soldering/ welding, Jointing shall be done by overlapping and with 2 set of Brass (for Cu strip) / GI (for GI Strip) nut bolt & spring washer spaced at 50cm making connection etc. as required.All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR |
| 11 | 20mm x 3mm copper strip |
| 12 | P / L of Double wall corrugated HDPE pipe confirming to IS : 16205 P-24, Stiffness Class 750 N, Externally corrugated and having smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation of Earth & Back filling with compaction is to be Paid Extra)All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . |
| 13 | Add Extra for Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade direct in ground including excavation of trench of size 75 cm (Depth) x 35 cm(Width) , with procedure as per following points:- (a) Make a river sand bed of height 125 mm along the trench, (b) Lay the cable in the middle of the trench, (c) Provide river sand bed of height 125 mm on top of the cable, (d) Lay the protective Common burnt clay F.P.S. Bricks of Class designation 75 / Sand stone slabs of 50 mm thickness and 225 mm wide just above the sand bed vertically across the cable ( Approx. 9 no. Bricks per Mtr.), (e) Backfill the excavated soil leaving 300 mm from the Ground level, (f)Lay the Cable warning tape and again back-fill the remaining portion of the trench upto the ground level and compacting the earth |
| 14 | Labour charges for Trimming of tree branches/plants and prepairing route approaches for electric proposed line complete with prior permission of local authority in writing , taking proper shutdown from discom office and inform to DISCOM after complete the work. |
| 15 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil |
| 16 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 17 | Providing and laying un-reinforced, dowel jointed, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion PCC M-20 |
| 18 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. |
| 19 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. Please Enable Macros to View BoQ information |