| 1 | Carriage of 33 kv 300 sqmm Cable XLPE from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 2 | Carriage of PCC Pole 11 Mtr Long from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 3 | Carriage of ST Pole 13 Mtr Long from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 4 | Carriage of ST Pole 11 Mtr Long from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 5 | Carriage of ACSR Panther Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 6 | Carriage of ACSR Dog Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 7 | Carriage of line material as:-33 kv 300 sqmm outdoor J/Kit- 4 Nos, Cable Box I/D 33KV 3x300 XLPE- 5 Nos, Cable Box O/D 33KV 3x300 XLPE- 25 Nos, 33 KV Cross Arm 100x50 MM V-Type- 52 Nos, 33 kv Pin Insulator Polymeric- 30 Nos, 33 kv Pin Insulator - 140 Nos, 33 Kv Polymeric Disc Insulator 70 KN- 50 Nos, 33KV Pin Insulator- 25 Nos, 33KV Pin with Nut- 25 Nos, 33 KV Disc Fitting- 52 Nos, 33 kv Disc Polymeric Insulator- 82 Nos, 33KV Isolator 800A- 2 Nos, 33 kv Stay Set 16x1800 mm.- 24 Nos...etc...from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 8 | Dismanteling of Old & Used Dog Conductor from work site to store center/Je store loading and unloading both side. |
| 9 | Dismanteling of Damage ST Pole Scrap from work site to store center/Je store loading and unloading both side. |
| 10 | Erection of PCC Pole 11 Mtr Long at various site complete in all respect as per respo Norms. |
| 11 | Erection of ST Pole 13 Mtr Long at 33 KV line crossing republic site complete in all respect as per respo Norms. |
| 12 | Erection of ST Pole 11 Mtr Long under 33/11 kv Substation SSGT complete in all respect as per respo Norms. |
| 13 | Providing and Concreting of Pole at various site complete in all respect as per respo Norms. |
| 14 | Providing and Earthing of Pole at various site complete in all respect as per respo Norms. |
| 15 | Supply & Fixing HDPE Pipe 140 mm at various site with all accessories complete in all respect as per respo Norms. |
| 16 | Laying of 33KV, 3x300sqmm, XLPE Cable trunchless method (with road restoration kuchha- 420 Mtr and road restoration pakka- 45 Mtr BSR-2) through above HDPE Pipe- 3700 Mtr at site with proper connection complete in all respect as per respo Norms. |
| 17 | Laying of 33KV, 3x300sqmm, XLPE Cable open cut method (with road restoration kuchha- 85 Mtr) through above HDPE Pipe- 170 Mtr with restoration at site with proper connection complete in all respect as per respo Norms. |
| 18 | Laying of 33KV, 3x300sqmm, XLPE Cable in air/loop riser at site with proper connection complete in all respect as per respo Norms. |
| 19 | Big Trees Cutting, trimming & Chopping at Lalkua-1 complete in all respect as per respo Norms. |
| 20 | Laying, Lifting, sagging and jumpering of ACSR Panther Conductor under 33/11 kv Substation SSGT complete in all respect as per respo Norms. |
| 21 | Laying, Lifting, sagging of ACSR Dog Conductor at various site complete in all respect as per respo Norms. |
| 22 | Fixing and filling of 33 kv 300 sqmm outdoor J/Kit at various site complete in all respect as per respo Norms. |
| 23 | Fixing and filling of Cable Box I/D 33KV 3x300 XLPE at various site complete in all respect as per respo Norms. |
| 24 | Fixing and filling of Cable Box O/D 33KV 3x300 XLPE at various site complete in all respect as per respo Norms. |
| 25 | Fixing of 33 KV Cross Arm 100x50 MM V-Type at various site complete in all respect as per respo Norms. |
| 26 | Fixing of 33 kv Pin Insulator Polymeric at various site complete in all respect as per respo Norms. |
| 27 | Fixing of 33 kv Pin Insulator at various site complete in all respect as per respo Norms. |
| 28 | Fixing of 33 Kv Polymeric Disc Insulator 70 KN at various site complete in all respect as per respo Norms. |
| 29 | Fixing of 33KV Pin Insulator at various site complete in all respect as per respo Norms. |
| 30 | Fixing of 33KV Pin with Nut at various site complete in all respect as per respo Norms. |
| 31 | Fixing of 33 KV Disc Fitting at various site complete in all respect as per respo Norms. |
| 32 | Fixing of 33 kv Disc Polymeric Insulator at various site complete in all respect as per respo Norms. |
| 33 | Fixing of 33 kv Disc Insulator at various site complete in all respect as per respo Norms. |
| 34 | Fixing of 33KV Isolator 800A at various site complete in all respect as per respo Norms. |
| 35 | Fixing of 33 kv Stay Set 16x1800 mm. at various site complete in all respect as per respo Norms. |
| 36 | Supply & Fixing of GI Pipe 6\\" Dia 1.5 mm at various site complete in all respect as per respo Norms. |
| 37 | Supply & Fixing of 33 KV MS Holding Clamp 300 sqmm at various site complete in all respect as per respo Norms. |
| 38 | Supply & Fixing of F Bracket for 33KV at various site complete in all respect as per respo Norms. |
| 39 | Supply & Fabricating of Sturcture for Fuse Set at various site complete in all respect as per respo Norms. |
| 40 | Supply & Fixing of 33KV F Clamp at various site complete in all respect as per respo Norms. |
| 41 | Supply & Fixing of Cable Hosting Clamp at various site complete in all respect as per respo Norms. |
| 42 | Supply & Fixing of Nut & Bolts at various site complete in all respect as per respo Norms. |
| 43 | Supply & Fixing of Cable Route Marker at various site complete in all respect as per respo Norms. |
| 44 | Supply & Fixing of MS Angle at various site complete in all respect as per respo Norms. |
| 45 | Supply & Fixing of MS Channel at various site complete in all respect as per respo Norms. |
| 46 | Supply & Fixing of Stone Pad at various site complete in all respect as per respo Norms. |
| 47 | Supply & Fixing of Holding Clamp at various site complete in all respect as per respo Norms. |
| 48 | All other Remainings works Shall have to complete in all respect as per site requirement. Please Enable Macros to View BoQ information |