| 1 | Safe carriage of the following Centralised material from any Store Centre of PVVNL/Baghpat/Baraut to work site /JE store with loading & unloading at both ends respectively. |
| 2 | 8.5 Mtr PCC Pole |
| 3 | 11Mtr PCC POLE |
| 4 | 11 KV \\"V\\" type cross arm 65x65x6 mm, M S Angle |
| 5 | 11 KV Pin insulator WITH PIN |
| 6 | Earthing of Pole by MS Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 7 | ACSR Weasel Conductor |
| 8 | ACSR Dog Conductor |
| 9 | 11/0.4 KV T/F 250KVA |
| 10 | 11 KV TPMO |
| 11 | 11 KV fuse Set |
| 12 | Distribution Box 3phase |
| 13 | Stay set Complete 9 G.I STAY ROD 20X1800MM, STAY WIRE 7/8 SWG, 10 K.G |
| 14 | ABC cable 3x120+3x95+3x70+1x20 sqmm |
| 15 | LT XLPE Cable Al 1x400 sq mm |
| 16 | 11 KV Disc Insulator T&C type 4500kg. |
| 17 | 11 KV Disc fitting |
| 18 | 11/0.4 KV T/F 63 KVA |
| 19 | ABC cable 3x95+1x70+1x16 sqmm |
| 20 | LT XLPE Cable Al 3.5x70 sqmm |
| 21 | 33kv Cross Arm |
| 22 | 33 Kv Pin Insulator With Pin |
| 23 | 33 KV Disc Insulator B&S Polymeric type |
| 24 | 33 KV Disc fitting for drop B&S type |
| 25 | 11 kv VCB Outgoing 200/100/5A 350 MVA |
| 26 | 33 kv VCB (750 MVA 1250 Amp.) |
| 27 | 33 kv CT (200/100/1 Amp.+400/200 /1 Amp.) |
| 28 | Contol Cable 4x2.5 sqmm |
| 29 | Contol Cable 2x2.5 sqmm |
| 30 | Proper Installation/Fabrication/laying/fixing/binding etc. of the above and Following Centralised Material With proper connection including All the Accessories and complete work in all respect (as per resspo norms and site requirement) (All work in the Contractor Scope with Carriage of material to different work site including loading & unloading at both ends respectively). |
| 31 | Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms.PCC Pole 08.5 Mtr AND 9 MTR PCC POLE . |
| 32 | Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms.PCC Pole 11 Mtr. |
| 33 | Double pole structure with ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole For HT/LT Line and complete work as per RESSPO Norms.PCC 8.5Mtr/PCC 11Mtr./PCC 9Mtr/STP 11Mtr/STP 13Mtr Pole Please Enable Macros to View BoQ information |
| 34 | Double pole structure with ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole For HT/LT Line and complete work as per RESSPO Norms.PCC 8.5Mtr/PCC 11Mtr./PCC 9Mtr/STP 11Mtr/STP 13Mtr Pole Please Enable Macros to View BoQ information |