| 1 | Excavating trenches up to a depth of 1.65m and back filling the excavated trenches after laying the HDPE/PLB pipe with or without protection as per tender specification ( OFT) |
| 2 | i) In Non Rocky Soil /Soft Soil/Kachcha soil ( OFTK ) |
| 3 | ii) In Pucca Soil (OFTP) |
| 4 | ii) In Soft Rock Soil /Disintegrated (D.I.) Soil (OFTR) ( OFTP ) |
| 5 | iii) in Rocky soil/Hard Rock Soil ( OFTR ) |
| 6 | Excavation & trenching including tunneling or boring and reinstatement as per construction specification of the tender to a depth of 2.0 meter or more in Bituminized/Concrete/Set Stone(rate per meter) for Single PLB pipe. (OFB) |
| 7 | Laying of PLB HDPE duct by HDD method at a depth of 2.0 m or more (for single PLB pipe). ( OFH ) |
| 8 | Laying of PLB HDPE Pipe/GI Pipes/RCC Pipe/DWC |
| 9 | Laying of single PLB HDPE Pipes/Coils, coupled with coupler ( LPH / (HDPE) ) |
| 10 | Laying and fixing of G.I. Pipes (Medium duty class having inner diameter of 50mm, as per ISI specifications) in trenches with PLB pipe HDPE Pipes/Coils inside ( LGIT / (GIPT1) ) |
| 11 | Laying and fixing G.I. pipes(Medium duty class having inner diameter of 50mm, as per ISI specification) in trenches on Bridges and Culverts with PLB HDPE pipes/Coils inside ( LGIC /(GIBC) ) |
| 12 | Laying of full round RCC (ISI mark)/DWC pipe (As per existing TEC GR no. GR/DWC-34/01 sep-2007 with latest amendments) in trenches over PLB HDPE pipes/coils, on culverts/bridges/Nula and for cases where cable is laid at less depth (wherever required) ( LFRC / (RCCT(A)) ) |
| 13 | Laying of half- split RCC(ISI Mark)/DWC pipe (as per existing TEC GR no GR/DWC-34/01 sep 2007 with latest amendment) in trenches over PLB HDPE pipes /coils, on culverts/ bridges/nula/and for cases where cable is laid at less depth (wherever required) ( LSRC /(RCCT(B)) ) |
| 14 | Providing cement concrete 1:2:4 at Wheel guard of bridge/culvert over the toe or in the trench for protection. ( PCCT ) |
| 15 | Providing cement concrete 1:2:4 over the PLB HDPE Pipe with wire mesh in the trenches for protection, where the depth is less than 120 Cms.(Cement Concrete as per specification) ( PCCM ) |
| 16 | Cable laying by pulling/blowing |
| 17 | Laying of OF Cable by Pulling/blowing method including openning of Manhole, Sealing of PLB HDPE Pipes by Rubber Bushes in Manholes/ Back Filling of Manholes. ( OFPB ) |
| 18 | Splicing of Fibers in Existing/New Joint Chambers for making Straight/Branch joints on new routes or at FPOI and end to end testing of all Fibers after Splicing. Installation rate is included. (SBBJ) |
| 19 | 288 Fiber |
| 20 | 96 Fiber |
| 21 | 48 Fiber |
| 22 | 24 Fiber |
| 23 | 12 Fiber |
| 24 | 6 Fiber |
| 25 | 2F/4F OF cable |
| 26 | Splicing of all the fibers of 24 F OF cable in the Fiber Termination Box at Khiroti BTS and testing all the fibers for continuity. This will also include installation/mounting of the FTB as specified. |
| 27 | 288 Fiber |
| 28 | 96 Fiber |
| 29 | 48 Fiber |
| 30 | 24 Fiber |
| 31 | 12 Fiber |
| 32 | 6 Fiber |
| 33 | 2F/4F OF cable |
| 34 | Jointing Chamber |
| 35 | Construction of Bricks joints chamber as per specification and the construction practice as specified in the tender document ( JCBR ) |
| 36 | Construction of pre fabricated RCC joints chamber as per specification and the construction practice as specified in the tender document ( JCRC ) |
| 37 | Route Indicator |
| 38 | Supply and fixing of RCC/Stone route/joint indicator by digging pit towards jungle side on each manhole/joint/route chamberas per specifications in the tender document. ( RISR ) |
| 39 | Restoration of road surface |
| 40 | Road restoration work with bituminous macadam for semi grouting 50mm thick and premix carpet surfacing 25mm thick over the grouted surface ( total up to 75mm thick ), including supply of asphalt etc. to evenly match the road, including consolidation and rolling as per standard specification of DSR 1997 ( RRSB ) |
| 41 | Road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225mm, including supply of concrete to evenly match the road. ( RRSC ) |
| 42 | Route Index Diagram |
| 43 | Supply of route index diagram in hard as well as soft copy on cd for complete Block. (DRID) |
| 44 | Videography of the route on which cable is laid (VLCR) |
| 45 | Laying of OF Cable in building (Leading in work) |
| 46 | Laying of OF cable in corridor/risers/exchange premises (leading work) ( LOIB ) |
| 47 | Installation of Splitter Box/FTB |
| 48 | Installation of splitter box/fibre termination box inside the Building/Tower/Complex (OFST) |
| 49 | Recovery of Store |
| 50 | Recovery of empty 24F cable Drum ( RECD ) Please Enable Macros to View BoQ information |