|
| 1 | Safe carriage of the following Centralised material from Store Centre to site /JE store with loading & unloading at both ends respectively. |
| 2 | 11 kv vcb Outgoing |
| 3 | PCC Poles 8.5 Mtr. Long |
| 4 | PCC Poles 9 & 11 Mtr. Long |
| 5 | ACSR Weasel conductor |
| 6 | Rabbit Conductor. |
| 7 | XLPE 3X185 SQ/3X300 sq MM 11 KV/ 3x120sq MM. |
| 8 | Earthing Set complete. |
| 9 | Stay Set complete |
| 10 | 33& 11 KV X-arm |
| 11 | Polymeric 33/11KV Pin Insulator With Pin |
| 12 | T-OFF CHANNEL |
| 13 | 33 /11 KV Disc Insulator. |
| 14 | Dropper |
| 15 | Top Channel |
| 16 | JOINTING KIT |
| 17 | Proper Installation/Fabrication/laying/fixing/binding etc. of the Following Material With All the Accessories (as per resspo norms) |
| 18 | For 11 KV Line, Single support with 8.5 PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) complete work as per RESSPO Norms. |
| 19 | For 11 KV Line, Single support with 9/11 PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) complete work as per RESSPO Norms. |
| 20 | Grouting of 8.5/9/11/13 mtr long Pcc/STP Pole,(20x1800mm.) including all works of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:6 (cement, sand and 40 mm. brick ballast) including back filling of soil and proper ramming etc. |
| 21 | Laying, sagging, stringing and binding of ACSR Weasel Conductor with all other accessories on pole as per RESSPO Norms. |
| 22 | Laying, sagging, stringing and binding of ACSR Rabbit Conductor with all other accessories on pole as per RESSPO Norms. |
| 23 | Fixing of 33 & 11 KV X-arm on poles by providing X-arm holding clamp. Complete work as per RESSPO norms. |
| 24 | Fixing of 33 & 11 KV Pin insulator on pole. Complete work as per RESSPO norms. |
| 25 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 26 | Stay Set Complete |
| 27 | Fixing of Cable Jointing Kit. |
| 28 | Fixing of 33 Disc insulator With fitting pole. Complete work as per RESSPO norms. |
| 29 | Fixing of 11kv vcb for O/G CTR 200/100/5A 350MVA (1250A) . Complete work as per RESSPO norms. |
| 30 | T-OFF CHANNEL |
| 31 | Provinding And Installation/Fixing of the Following Decentralised Material With All the Accessories (as per resspo norms) |
| 32 | Stone Pad |
| 33 | Cross Arm Holding Clamp |
| 34 | F Brackets 11 kv <33 KV Line |
| 35 | LT Clamp for Pcc Pole |
| 36 | Clamp for D/P with bolts & Nuts |
| 37 | Grouting of Stay Rod including all works of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:6 (cement, sand and 40 mm. brick ballast) including back filling of soil and proper ramming etc. |
| 38 | MS Bolts nuts |
| 39 | Water Level Earthing Complete in all respect as per Respo Norms. |
| 40 | chemical Earthing Complete in all respect as per Respo Norms. |
| 41 | Dismantling and received back of the scrap Material from site to ESC Bijnor with loading & unloading at both ends respectively (as per resspo norms) |
| 42 | Alluminium Scrap Please Enable Macros to View BoQ information |