| 1 | Safe cartage of centralised Material from central store to Work Site (Including Loading, Unloading in all Respect) |
| 2 | PCC(8.5 Mtr/9 mtr)pole |
| 3 | PCC(11 mtr)pole |
| 4 | 100 KVA TF |
| 5 | Conducter Wire |
| 6 | ABC(3x95+1x70+1x16)/ (3x50+1x35+1x16) |
| 7 | ABC(3x120+1x95+1x16) |
| 8 | Line Item |
| 9 | 11KV 3x185 Sq mm XLPE Cable |
| 10 | LT PVC Lead 1x240/1x400Sq mm |
| 11 | 33 KV Fuse set |
| 12 | Digging a pit and Placed PCC Pole in it with Instalation all Line Items, Properly Grouting of Pole and energized line.(Decentralized Item As Nut Bolt, Clamp, F Brackets, Stone pad and Material for grouting will be provide by Contractor) |
| 13 | Digging a pit and Placed 11 MtrSTP Pole in it with Instalation all Line Items, Properly Grouting of Pole and energized line.(Decentralized Item As STP Pole, Nut Bolt, Clamp, F Brackets, Stone pad and Material for grouting will be provide by Contractor) |
| 14 | Digging a pit and Placed 11 mtr PCC Pole in it with Instalation all Line Items, Properly Grouting of Pole and energized line.(Decentralized Item As Nut Bolt, Clamp, F Brackets, Stone pad and Material for grouting will be provide by Contractor) |
| 15 | Digging a pit and Placed PCC Pole in it for Duble pole with Instalation all Line Items, Properly Grouting of Pole and energized Dp.(Decentralized Item As Nut Bolt, Clamp,angel chanal, Stone pad and Material for grouting will be provide by Contractor) |
| 16 | Work for Gaurding of 11 KV Line. (Decentralized Item As Nut Bolt, Clamp, Angel will be provide by Contractor) |
| 17 | Installation of 100 KVA T/F on DP in all respect and energize after complete all work as RESPO Norms.(All required Decentralized material will be Provided by contractor) |
| 18 | Instalation of LT Distribution Box (Decentralized Item As Nut Bolt, Piercing Connector, Connecting Lead 1x16 mm will be provide by Contractor) |
| 19 | Open Jar Jar Rabit/ Weasal/ABC from Pole, Lay down and collect safly |
| 20 | Work of Spread ABC, mounting and tying the wire on the pole with installation of all necessary line Item properly as RESPO Norms. (Decentralized Item As Nut Bolt, ALL Type Clamp, J huk, Angel will be provide by Contractor) |
| 21 | Work of Spread, mounting and tying the wire on the pole with installation of all necessary line Item properly as RESPO Norms (Decentralized Item As Nut Bolt, Clamp will be provide by Contractor) |
| 22 | Weasal |
| 23 | Rabit |
| 24 | Work for Instalation of Stay Set |
| 25 | Work for Concerting of Stay (All Item As Cement, Sand etc for Concreting will be provided by Contractor) |
| 26 | Chemical Earthing work as per requirment of Site & RESPO Norms Including all of accessories (All required Decentralized material will be Provided by contractor for Earthing) |
| 27 | According RESPO Norms Installation of danger board on pole(All required Decentralized material will be Provided by contractor) |
| 28 | According RESPO Norms Installation of barbed wire on pole(All required Decentralized material will be Provided by contractor) |
| 29 | According RESPO Norms Instalation 11 KV Fuse Set (All required Decentralized material as Nut bolt, Clamp, Chanal will be Provided by contractor for Fuse Set) |
| 30 | According RESPO Norms Instalation LT Fuse Set (All required Decentralized material as Nut bolt, Clamp etc will be Provided by contractor for Fuse Set) |
| 31 | According RESPO Norms Earthing of Pole by MS earthing |
| 32 | Work For Laying of 11KV 3x185 Sq mm XLPE Cable as RESSPO Norms. |
| 33 | According RESSPO Normas making Jointing Kit of 11 KV XLPE |
| 34 | Providing and Fixing Tail Less Unit on DT under EDD Khatauli |
| 35 | Work for Prepare Structure for CT/PT/LA Units ( Grouting of Pole and All Decentralize Material Will Be Provided by Contrector,) |
| 36 | Work for Instalation 33KV Fuse Set |
| 37 | Safly Cartage of 11 KV (O/G, I/C VCB) and Control Panel from Centeral Store to 33/11 KV Sub Station including loading and unloading to both ends in all respect with the help of heavy duty crane. |
| 38 | Dismentling of old 11KV & 33 KV VCB/Controle Panal from the control room/Switch Yard including opening of all H.T. cable/ bus-bar form VCB and carriage VCB out Side Control Room/Switch Yard |
| 39 | Shifting of New 11KV VCB/Control Panal from out side to inside the control room with the help of heavy duty crene and its instalation with grouting with anchor bolts. |
| 40 | Making the bus-bar connection of VCB and making connection of H.T. Cable with VCB and proper insulation of bus-bar and making the connection of 33KV & 11 KV VCB etc, completely in all respect. |
| 41 | Providing and Fixing 4x25 mm2 Control Cable in Double Circt Control Panel |
| 42 | Providing and Fixing 2x25 mm2 Control Cable in Double Circt Control Panel |
| 43 | Water Level Earthing |
| 44 | Received Back from Site to Store (Including Loading, Unloading, Cartage in all respect) |
| 45 | 33KV/11 VCB/Control Panel |
| 46 | Receive Back of ABC |
| 47 | Receive Back of Conducter Please Enable Macros to View BoQ information |