| 1 | Supply of following Decentralised material including freight and insurance charges. |
| 2 | Suspension clamp with I hook |
| 3 | Dead end clamp with I hook |
| 4 | Stone pad 300x300x75 mm |
| 5 | LT pole Clamp with nuts & bolts for PCC pole. |
| 6 | Earth wire clamps for PCC pole |
| 7 | Eye Hook |
| 8 | J-Hook |
| 9 | Bracket Clamp for Distribution Box 3 phase |
| 10 | Connected lead 1x16sqmm |
| 11 | LT Piercing connector 95sqmm |
| 12 | The following Centralised material Erection/ Fixing & laying as per RESPO manual and as per direction to Supervising Engineer (complete in all respect). Its includes the cost of labour,T&P & safe cartage etc.required all acessaries for proper completion of work. |
| 13 | PCC Support 8.5 Mtr. Long |
| 14 | LT ABC (1x25+1x16) Sq. mm |
| 15 | LT ABC (3x50+1x35+1x16) Sq. mm |
| 16 | LT ABC (3x95+1x70+1x16) Sq. mm |
| 17 | LT ABC (3x120+1x95+1x16) Sq. mm |
| 18 | LT PVC Armoured Al.Cable 4x16 sq.mm |
| 19 | LT PVC Armoured Al.Cable 4x25 sq.mm |
| 20 | ACSR WEASEL CONDUCTOR |
| 21 | Extra for stays at angle Location (Stay rod 16x1800mm, Stay wire 5 kg, stayclamp, bolts & nut with grouting) |
| 22 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earthing wire etc. |
| 23 | LT Distribution box |
| 24 | The following Decentralised material Erection/ Fixing & laying as per RESPO manual and as per direction to Supervising Engineer (complete in all respect). Its includes the cost of labour,T&P & safe cartage etc.required all acessaries for proper completion of work. |
| 25 | Suspension clamp with I hook |
| 26 | Dead end clamp with I hook |
| 27 | Stone pad 300x300x75 mm |
| 28 | LT pole Clamp with nuts & bolts for PCC pole. |
| 29 | Earth wire clamps for PCC pole |
| 30 | Concreting of poles (0.268 Cu. M. each) |
| 31 | Eye Hook |
| 32 | J-Hook |
| 33 | Bracket Clamp for Distribution Box 3 phase |
| 34 | Connected lead 1x16sqmm |
| 35 | LT Piercing connector 95sqmm |
| 36 | Concreting of Saty |
| 37 | The following material Recieved back from Site to concern store centre as per RESPO manual and as per direction to Supervising Engineer (complete in all respect). |
| 38 | LT ABC Jarjar Wire (Scrap) Please Enable Macros to View BoQ information |