|
| 1 | Safe carriage of the following Centralised material from Store Centre to site /JE store with loading & unloading at both ends respectively. |
| 2 | PCC pole 8.5 meter long |
| 3 | 250 KVA transformer |
| 4 | 100 KVA transformer |
| 5 | 63 KVA transformer |
| 6 | 25 KVA transformer |
| 7 | ACSR weasel conductor |
| 8 | LT AB Cable (3x50+1x35+1x16) Sq.mm |
| 9 | LT AB Cable (3x120+1x95+1x16) Sq.mm |
| 10 | LT PVC Cable 1X400 sqmm |
| 11 | LT XLPE Cable 1x240sqmm |
| 12 | LT XLPE Cable 1x400sqmm |
| 13 | LT PVC Cable Size 3.5x150/70mm |
| 14 | Distribution box 3Q |
| 15 | MS Top channel (100x50x2240mm) |
| 16 | MS Channel (Dropper) 100x50x2028mm |
| 17 | Sub-Station Angle |
| 18 | MS Tee of Channel |
| 19 | 11 KV Pin insulator (Polymeric) With Pin |
| 20 | 11 KV TPMO. |
| 21 | 11 Disc insulator with fitting. |
| 22 | Stay Rod set complete . |
| 23 | Earthing set complete . |
| 24 | 11 kv Fuse Set.. |
| 25 | Proper Installation/Fabrication/laying/fixing/binding/Sagging etc. of the Following Material With All the Accessories (as per resspo norms) |
| 26 | Single line support with PCC 8.5 meter long pole with grouting by providing sand, cement and bricks etc. complete work as per RESPO norms. |
| 27 | Double pole structure with PCC Pole 8.5 mtr with grouting by providing sand, cement and bricks etc. complete work as per RESPO norms. |
| 28 | 11 KV disc insulator with fitting on pole as per norms. |
| 29 | 11 KV pin insulator with pin & nut on pole as per norms. |
| 30 | Fixing of dropper channel on pole as per norms. |
| 31 | Fixing of MS Channel T-off 125x65x1300 mm on pole as per norms. |
| 32 | Fixing of Top channel on pole as per norms. |
| 33 | Earthing of pole by MS Earthing rod of 20x2500 mm and 6 swg earthing wire etc. |
| 34 | Fixing of Stay Rod set complete work with concreting by providing sand, cement and bricks etc. complete work as per RESPO norms. |
| 35 | Construction of plinth of size 2x2x1.5 meter by providing fine sand, cement and brick ballast, 1st class bricks, stone ballast 40 mm and all type of material and T&P complete work as per norms. |
| 36 | Safe installation of 250 KVA transformer on plinth, making H.T./L.T. connections and all other work as per norms. |
| 37 | Fencing around 250 KVA transformer plinth by providing MS angle and mesh and and all type of material and T&P complete work as per norms. |
| 38 | Installation of 100 KVA transformer on double pole at standard height and making proper connection as per norms. |
| 39 | Installation of 25 KVA transformer on double pole at standard height and making proper connection as per norms. |
| 40 | 11 kv TPMO. |
| 41 | MS angle 75*75*6*2028mm |
| 42 | LT PVC Cable Size 3.5x150/70mm |
| 43 | Laying, sagging, stringing and binding of ACSR Weasel Conductor with all other accessories on pole as per RESSPO Norms. |
| 44 | Installation of 63 KVA transformer on double pole at standard height and making proper connection as per norms. |
| 45 | Errection of LT AB cable 3x50 sq.mm. |
| 46 | Errection of LT AB cable 3x95 sq.mm. |
| 47 | Errection of LT AB cable 3x120 sq.mm. |
| 48 | Errection of LT PVC Cable 1X400 sqmm. |
| 49 | Errection of LT PVC Cable 1X240 sqmm. |
| 50 | Fixing of Distribution box on pole. |
| 51 | Fixing of Transformer base angle on double pole. |
| 52 | Fixing of 11 kv Fuse Set.. |
| 53 | Provinding And Installation/Fixing of the Following Decentralised Material With All the Accessories (as per resspo norms) |
| 54 | Stone Pad |
| 55 | LT clamp. |
| 56 | PRC Clamp. |
| 57 | Danger Board With Clamp |
| 58 | Baebed Wire |
| 59 | I/J Hook |
| 60 | Suspension clamp |
| 61 | 11 KV Fuse Box (LT Fuse Set Installed In SMC Box) |
| 62 | Holding Clamp for top, dropper, TPMO etc. |
| 63 | Dead End Clamp |
| 64 | Taillus unit henley type |
| 65 | MS Bolts And Nuts |
| 66 | Water Level Earthing Complete in all respect as per Respo Norms. |
| 67 | chemical Earthing Complete in all respect as per Respo Norms. |
| 68 | Dismantling and received back of the scrap Material from site to ESC Bijnor with loading & unloading at both ends respectively (as per resspo norms) |
| 69 | 100 KVA transformer Please Enable Macros to View BoQ information |