|
| 1 | Part – A (RAW WATER P/Plant Mali River at Sitadih ) |
| 2 | Cost towards repairing and Overhauling of 50 H.P. V.T. Pump Set Multiple Stage ball assembly S/F impeller G.M. Bush as per sample 5 – Nos each, S/F Housing Bush as per Sample. Replace in spider rubber cutless bush – 5 Nos, replacing of 25mm dia. 5 feet long S.S. line shaft – 4 Nos with S.S. socket . Transportation charge from site to work shop vice versa including tools – tackles and Labour charges for lifting & lowering V.T. Pump before and after repairing work etc all complete at pumping plant. |
| 3 | Supplying all labour tools and tackles for complete opening, dismantling , Cleaning of its slots of stator by brush & petrol then complete rewinding of 50 H.P. 440 Volts, 50 C/S, Star delta, 3 Phase Hollow Shaft V.T. motor by supplying super enameled copper wire & binding, tapping varnishing, heating, testing on full load and repairing of stator & rotor, changing of bearings as per sample SKF make with including the deduction of cost of burnt copper wires and transportation charges from P/Plant to workshop and back to the same . Including tools & tackles and labour charges etc all complete at P/Plant. |
| 4 | Cost towards repairing/ Replacement of 200 Amp motor control panel board consisting of incoming feeder MCCB 200 Amp – 1 No. and outgoing feeder MCCB 100 Amp – 2 Nos, Timer – 1 No., thermal over load release relay – 2 Nos. supplying and fitting of Digital Volt meter (0-500V) squared type – 2 Nos, Ammeter (0-125Amp) squared type – 2 Nos and replacement of phase indicator lamp – 3 Nos. including internal wiring etc all complete. |
| 5 | Cost towards Supplying & Fitting 35 mm2 3 core copper conductor 15 mtr panel to motor. |
| 6 | Cost towards Supplying & Fitting 60 Watt LED Street light (JSOR-M840) |
| 7 | Part – B (CLEAR WATER Lesliganj.) |
| 8 | Cost towards repairing/ Replacement of 200 Amp motor control panel board consisting of incoming feeder MCCB 200 Amp – 1 No. and outgoing feeder MCCB 100 Amp – 3 Nos, Timer – 1 No., thermal over load release relay – 3 Nos. supplying and fitting of Digital Volt meter (0-500V) squared type – 2 Nos, Ammeter (0-125Amp) squared type – 2 Nos and replacement of phase indicator lamp – 3 Nos. including internal wiring etc all complete. |
| 9 | Supplying all labour tools and tackles for complete opening, dismantling , Cleaning of its slots of stator by brush & petrol then complete rewinding of 20 H.P. 440 Volts, 50 C/S, Star delta, 3 Phase induction motor by supplying super enameled copper wire & then tapping varnishing, heating & testing on full load and repairing of stator & rotor, changing of bearings as per sample SKF make with including the deduction of cost of burnt copper wires and transportation charges from P/Plant to workshop and back to the same . Including tools & tackles and labour charges etc all complete at P/Plant. |
| 10 | Cost for repairing of 20 H.P. C/F pump with M/S/F S.S. shaft as per sample – 1 No. C.I. Gland Tightner – 2 Nos, C.I. Bearing housing – 2 Nos, MS. Check Nut – 2 Nos, C.I. Neckring – 2 Nos, Ball Bearing S.K.F. as per sample – 2 Nos, all labour tools & tackles and materials with loading and unloading transporting charge from site to workshop & vice versa. |
| 11 | Cost towards varnishing, heating of winding & Greasing of both side ball bearing of 25 H.P. Induction motor 3 Phase, 1440 rpm, Volt 410 ± 10% 50 Cycle along with supplying & Fitting of tyre coupling – 2 Nos, then testing on full load at site including supply of all labour tools and tackles. |
| 12 | Cost for repairing of 25 H.P. C/F pump with M/S/F S.S. shaft as per sample – 1 No. C.I. Gland Tightner – 2 Nos, C.I. Bearing housing – 2 Nos, MS. Check Nut – 2 Nos, C.I. Neckring – 2 Nos, Ball Bearing S.K.F. as per sample – 2 Nos, all labour tools & tackles and materials with loading and unloading transporting charge from site to workshop & vice versa. |
| 13 | Supplying all labour tools and tackles for complete opening, dismantling , Cleaning of its slots of stator by brush & petrol then complete rewinding of 40 H.P. 440 Volts, 50 C/S, Star delta, 3 Phase induction motor by supplying super enameled copper wire & then tapping varnishing, heating & testing on full load and repairing of stator & rotor, changing of bearings as per sample SKF make with including the deduction of cost of burnt copper wires and transportation charges from P/Plant to workshop and back to the same . Including tools & tackles and labour charges etc all complete at P/Plant. |
| 14 | Cost towards varnishing, heating of winding & Greasing of both side ball bearing of 40 H.P. Induction motor 3 Phase, 1440 rpm, Volt 410 ± 10% 50 Cycle along with supplying & Fitting of tyre coupling – 2 Nos, then testing on full load at site including supply of all labour tools and tackles. |
| 15 | Cost for repairing of 40 H.P. C/F pump with M/S/F S.S. shaft as per sample – 1 No. C.I. Gland Tightner – 2 Nos, C.I. Bearing housing – 2 Nos, MS. Check Nut – 2 Nos, C.I. Neckring – 2 Nos, Ball Bearing S.K.F. as per sample – 2 Nos, all labour tools & tackles and materials with loading and unloading transporting charge from site to workshop & vice versa. |
| 16 | Cost towards supplying & Fitting of 200 Amp TPN main switch. |
| 17 | Cost towards supplying & Installation of D.O.L starter Compatible for 1 H.P. Alum Mixture motor |
| 18 | Supplying & Fitting Gland packing 10 mm dia. |
| 19 | Supplying & Fitting Gland packing 8 mm |
| 20 | Cost towards Supplying & Fitting 70 Watt LED Street light (JSOR-M841) |
| 21 | Grease |
| 22 | Cost towards supplying and fitting single flap G.I. flanged type 65mm dia. foot valve having single leather flap and gunmetal seating. Valve shall be fixed suction side of pump as per requirement including joining material and hardware. (JSOR-M1063) |
| 23 | Cost towards supplying and fitting single flap G.I. flanged type 80mm dia. foot valve having single leather flap and gunmetal seating. Valve shall be fixed suction side of pump as per requirement including joining material and hardware. (JSOR-M1063) Please Enable Macros to View BoQ information |