|
| 1 | Part A : Repairing of 1 No-90KW, 550V, 1480Rpm, Marathon make(Sl No X256210) Motor |
| 2 | Supply of SE Copper Wire |
| 3 | Supply of Insulation |
| 4 | Supply of PVC Copper Insulated Copper lead |
| 5 | Supply of Terminal insulator |
| 6 | Supply of wooden Farma for making Coils as per size |
| 7 | Supply of Ball Bearing No-6318 |
| 8 | Less of Copper Scrap Value |
| 9 | Dismantling of Motor starter and rotor Both after removing of circuit connection and jumpering, taken out burnt coils from Starter slot,cleaning of core slots by approved type cleaner,drying etc. |
| 10 | Repairing of both end Cover by welding and Machining |
| 11 | Labour cost for insulating |
| 12 | Repairing of Rotor Shaft by welding and Machining |
| 13 | Cost for Assembling |
| 14 | Both Side Transportation Charges of above Motor |
| 15 | Part B :Repairing of 1 No of 110 KW,550V,1480Rpm, Marathon make Motor (SL No-JRNP3) |
| 16 | Dismantling of Motor Stator and rotor both after removing of circuit connection and jumpering,taken out burnt coils from stators slot,cleaning of core slots by approved type cleaner,drying etc. |
| 17 | Supply of SE Copper Wire |
| 18 | Insulation cost |
| 19 | Labour Cost |
| 20 | Supply of glass insulated Copper Lead |
| 21 | Supply of Terminal Insulator |
| 22 | Supply of Wooden farma for making coils as per size |
| 23 | Less Scrap Value |
| 24 | Reconditionng of Bearing housing,fabrication,fixing of new sleeves,Machining as per bearing size |
| 25 | Checking truness of rotor and both end covers. |
| 26 | Shapping of copper Bars |
| 27 | Replacement of Bearing 6318 |
| 28 | Replacement NU318 Bearing |
| 29 | Both side transportation charges of Motor. |
| 30 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |