| 1 | DRAIN WORK |
| 2 | Dismantlling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M.lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 3 | Earth work in excavation in foundation treaches in| ordinary soil(Vide classification of soil item-A) and disposal of excaveted earth as obtained to a distance upto 50M including all lifts levelling,ramming the foundation trenches, removing roots of trees, ,shrubs all complete as per approved design, building specification and direction of E/I. |
| 4 | Providing coarse clean sand in filling in foundation trenches or in plinth, including ramming and watering in layer not exceeding 150mm thick, with all leads and lifts, including cost of all materials, labour, royalty and taxes, all complete as per building design and specifications and direction of E/I.(Mode of measurement compacted volume) |
| 5 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto Plinth Level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) DRAIN SLAB. |
| 7 | Centering and shuttering including strutting, propping etc and removal of form for foundation ,footigs and bases |
| 8 | Centering and shuttering including strutting, propping etc and removal of form for foundation ,footigs and bases |
| 9 | Centering and shuttering including strutting, propping etc and removal of form for Slab edges |
| 10 | Providing Tor Steel Reinforcement of 8mm,10mm,12mm and 16mm dia bars as per approved design and drawing with cutting, bending and binding with annealed wire with cost of wire removal of rust, placing the rods in position ( including carriage of bars to worksite) all complete as per building specification and direction of E/I. |
| 11 | 8mm (Tmt coil Fe 565 ) (only Valid for tata (tiscon), sail, jspl, electrosteel ltd. Bokaro and vizag (RINL)).40% |
| 12 | 10mm (TMT coil Fe 565) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL))60% |
| 13 | OVERLAPPING OF ROAD |
| 14 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools,breacking to pieces not exceeding0.02cum in volume and stock piling as designated locations and disposal of dismanteled materials up to a lead of 1000 m,stacking serviceable and unserviceable materials seprately |
| 15 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. |
| 16 | Supplying and laying(properly as per design and drawing)rip-rap with good quality of boulders duly packed including the cost of materials,royalty all taxes etc, but excluding the cost of carnage all complete as per specification and direction of E/I |
| 17 | Providing coarse clean sand in filling in foundation trenches or in plinth, including ramming and watering in layer not exceeding 150mm thick, with all leads and lifts, including cost of all materials, labour, royalty and taxes, all complete as per building design and specifications and direction of E/I.(Mode of measurement compacted volume) |
| 18 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -all work up to plinth level: (1:1.5:3) (1 cement : 1.5 coarse sand (zone III ) : 3 graded stone aggregate 20 mm nominal size ). |
| 19 | Centering and shuttering including strutting, propping etc and removal of form for Slab edges |
| 20 | Carriage of materials |
| 21 | cement |
| 22 | coarse sand |
| 23 | stone chips |
| 24 | bricks |
| 25 | boulders |
| 26 | 18% GST |
| 27 | 1% labour cess Please Enable Macros to View BoQ information |