Indian Tenders

Tender Notice

TDR 55592651
Tendering Authority Indian Navy
Tender No GEM/2026/B/7469949
Tender ID GEM/2026/B/7469949
Tender Brief Corrigendum : Bids Are invited for Repair And Overhauling Service - Com/0333/Ajr/Mr O/L- 26/A; Any Other Suitable Brand; Yes; Buyer Premises - Hull Qdls-Ajr-Mr-26001 Docking- Vessel To Be Docked In Both Versions. Note 1:- Firms Not To Quote View Docking, Undocking
City Visakhapatnam
State Andhra Pradesh
Document Fees Refer document
EMD INR 3801600.0 /-
Tender Value Refer document
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Repair And Overhauling Service - Com/0333/Ajr/Mr O/L- 26/A; Any Other Suitable Brand; Yes; Buyer Premises - Hull Qdls-Ajr-Mr-26001 Docking- Vessel To Be Docked In Both Versions. Note 1:- Firms Not To Quote View Docking, Undocking And Dock Blocks Preparation Will Be Done By Navy And The Job Is Required To Be Carried Out In Navy Premises (I.E. Nd(V) Slipway). Note 2:- Last Date Of Undocking - 04 Oct 21 , 002 Hull Cleaning (A) Under Water And Boot Top Area Hp Jet Clean Entire Under Water Area And Boot Top Area (With A Pressure Not Exceeding 3000 Psi) Including Ship Side And Remove The Marine Growth/Barnacles And Present For Survey (A) U/W Area: 310 Sqm,(B) Boot Top Area: 40 Sqm , 002 Hull Cleaning (B) Miscellaneous Tanks The Following Tanks To Be Cleaned And Present For Survey:- Fore Peak Tank-01 Ballast Tanks/Void Space (02 Nos), Cable Locker-01 Fresh Water Tanks -02 Fire Fighting Foam Tanks -01 , Cofferdams -02 Note: - Ventilation And Gas Free For All Tanks To Be Carried Out. The Residue/ Left Over Inside Tanks To Be Transferred To Empty Drums. Manually Cleaning Of All Tanks To Be Carried Out. The Tanks Should Be Washed Out With Fresh Water And Soap Water To Remove Any Sediment Or Dirt Present In The Tank. All Tanks To Be Made Available For Undertaking Survey. , 002 Hull Cleaning (C) Internal Compartments - Engine Room And Srp Compartment Manually Cleaning Of Following Internal Compartments To Be Carried Out And Present For Undertaking Survey. (I) Engine Room. (Ii) Srp Compartment , 002 Hull Cleaning (D) Fuel And Lub Oil Tanks Ventilation And Gas Free For All Tanks To Be Carried Out. The Residue/ Left Over Inside Tanks To Be Transferred To Empty Drums. Manually Cleaning Of All Tanks To Be Carried Out. The Tanks Should Be Washed Out With Fresh Water And Soap Water To Remove Any Sediment Or Dirt Present In The Tank. All Tanks To Be Made Available For Undertaking Survey. The Following Tanks To Be Cleaned And Present For Survey:- (A) Fuel Tank (02 Nos) (B) Ru Tanks (02 Nos) (C) Lub Oil Tank , 003 Hull Survey (A) Visual Survey External And Internal Hull Survey. Carry Out Visual And Hammer Survey (In The Presence Of Qc Representatives) In Accordance With No 01/15 Of Under Water Hull, Boot Top Area, Above Water Hull, Super Structure, Weather Decks And All Internal Compartments(I.E. Fw Tanks, Ballast Tanks, Fore Peak Tank, Engine Room, Steering Compartment, Fo Tanks, Cofferdams, Manholes ,All Stiffeners And Deck Fittings Etc.. Approx. Area: 3000 Sqm Firm To Submit 07 Copies Of Hull Survey Report . Firm To Prove The Welds By Non-Destructive Tests And By Hose Test On Completion Of Welding. , 003 Hull Survey (B) Utg Survey External And Internal Hull Survey. Carry Out Utg Survey In The Presence Of Qc Representatives Of U/W Hull, Ship Side, Superstructure, Weather Deck, Bulkheads, Tanks, Living Spaces Covering Entire Part Of Hull. Firm To Submit 07 Copies Of Hull Survey Report. , 004 Steel Renewals Quote For Steel Renewal At Various Locations As Per Survey Report. Note 1:- Quoted Repair Cost Shall Include Cost Of Both Sides Blasted And Primed Grade `A Quality Ship Building Steel For Shell And Is 2062 Grade `B Quality Steel For Non Structural Works, Degutting/Degutting/ Renewal Of All Obstructions In Way Of Steel Renewals Including Lagging/Panelling, Minor Fittings/ Equipments With Their Foundations, Ventilation Systems, Staging Etc., As Indicated By Survey Team / Rmt, Proving Of The Weld Runs By Non-Destructive Tests And By Hose Test On Completion Of Welding, Pressure Testing And Proving Of Tanks Where Steel Renewal Undertaken Etc. Note 2:- Firms To Indicate Cost Of New Panelling(2Mm Thick) And Lagging (2 Mfmb) Material In The Budgetary Cost For 50 Sqm Each. , 005 Build Ups Carry Out Build Ups As Indicated By The Hull Survey Team/ Surveyor (A) 25 X 25 Mm - , 005 Build Ups Carry Out Build Ups As Indicated By The Hull Survey Team/ Surveyor (B) 50 X50 Mm - , 006 Fairing Carryout Fairing Of Deformed Structures As Indicated By Hull Survey Team/ Surveyor , 007 Re-Welding Run Carry Out Re-Welding Runs On Weld Seams As Indicated By Hull Survey Team/ Qc/ Rmt. , 008 Sea Tube (A) Hydro Jet Blasting, Survey, Repairs And Pressure Testing Of Sea Tube Including Sea Chest To Be Carried Out. , 008 Sea Tube (B) Carryout Renewal Of Sea Tubes, Od-300Mm, Schedule 80. , 009 Draught Marks Draught Marks To Be Renewed And Painted. Both Roman And Numeric. , 010 Sacrificial Anodes (A) Firm To Supply And Renew Sacrificial Anodes (Mk-Ii) . , 010 Sacrificial Anodes (B) Firm To Supply And Renew Sacrificial Anodes (Mk-Iii) , 011 Surface Preparation Under Water Area Including Boot Top Area Grit Blasting To Sa 2.5 On The Underwater Areas For Removal Of U/W Paint And Application Of Under Water Paint Scheme As Per No 01/15 , 011 Surface Preparation Under Water Area Including Boot Top Area Grit Blasting To Sa 1 On The Underwater Areas For Removal Of U/W Paint And Application Of Under Water Paint Scheme As Per No 01/15 , 012 Under Water Area - Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Primer - Pen Guard Primer , Dft-50 Microns , 012 Under Water Area - Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also.. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Anti Corrosive - Jota Coat Universal N10 (Aluminium) - 150 Microns , 012 Under Water Area - Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Anti Corrosive - Jota Coat Universal N10 (Grey) - 150 Microns , 012 Under Water Area - Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (D) 4Th Coat: Tie Coat: Safeguard Universal Es(Red) - 125 Microns , 012 Under Water Area - Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. Under Water Area - Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (E) 5Th Coat: A/F: Sea Quantum Pro U(Light Red) - 150 Microns , 012 Under Water Area - Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (F) 6Th Coat: A/F:Seaquantum Pro U (Dark Red) - 150 Microns , 012 Painting - Jotun Scheme. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. Paint Under Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (H) 7Th Top Coat: A/F Seaquantum Spectrum (Black) - 150 Microns Dft , 013 Surface Preparation Above Water Area And Bulwark Including Guardrails Carry Out Spot Blasting To Sa 2.5 Standard For Paint Application , 013 Surface Preparation Above Water Area And Bulwark Including Guardrails Carry Out Spot Blasting To Sa 1 Standard For Paint Application , 013 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Pen Guard Primer (Red), 50 Microns Dft , 013 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jota Mastic 80 (Red Brown) - 125 Microns Dft , 013 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme Paint Above Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Jota Mastic 80 (Grey) - 125 Microns Dft , 013 Painting Above Water Area And Bulwark Including Guardrails - Jotun Scheme. Paint Above Water Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (D) 4Th Coat: Hardtop Xp (Ral9011) - 60 Microns Dft , 014 Surface Preparation Super Structure, Deck Fittings Carry Out Mechanical Cleaning To St 1 Standard For Paint Application , 014 Surface Preparation Super Structure, Deck Fittings Carry Out Mechanical Cleaning To St 3 Standard For Paint Application , 015 Painting Superstructure And Deck Fittings - Jotun Scheme. Paint Super Structure Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Pen Guard Primer (Red), 50 Microns Dft , 015 Painting Superstructure And Deck Fittings - Jotun Scheme. Paint Super Structure Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jota Mastic 80 (Red Brown) - 125 Microns Dft , 015 Painting Superstructure And Deck Fittings - Jotun Scheme. Paint Super Structure Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Jota Mastic 80 (Grey) - 125 Microns Dft , 015 Painting Superstructure And Deck Fittings - Jotun Scheme. Paint Super Structure Area With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (D) 4Th Coat: Ral 9010 White - 100 Microns Dft , 016 Surface Preparation Weather Deck And Fittings Carry Out Surface Preparation To Wj 2.0 Standard For Paint Application As Per Survey Report By Paint Oem Rep , 017 Painting Weather Deck And Fittings - Jotun Scheme. Paint Weather Decks And Fittings With Following Paint Scheme.Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Primer - Pen Guard Primer (Red), 50 Microns Dft , 017 Painting Weather Deck And Fittings - Jotun Scheme. Paint Weather Decks And Fittings With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jota Mastic 87 (Aluminium) - 300 Microns Dft , 017 Painting Weather Deck And Fittings - Jotun Scheme. Paint With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Jot Armour Bs640 - 800 Microns , 018 Surface Preparation Internal Compartments -Tanks Carry Out Mechanical Surface Preparation To St 1 Standards For Paint Application Wherever Peeled Off / Paint Defective In Fore Peak Tanks-02 Ballast Tanks-02 Nos Cable Locker-01 Fire Fighting Foam Tanks -01 Cofferdams -02 , 018 Surface Preparation Internal Compartments -Tanks Carry Out Mechanical Surface Preparation To St 3 Standards For Paint Application Wherever Peeled Off / Paint Defective In Fore Peak Tanks-02 Ballast Tanks-02 Nos Cable Locker-01 Fire Fighting Foam Tanks -01 Cofferdams -02 , 019 Painting Fore Peak Tank, Ballast Tank, Cable Locker , Cofferdam, Fresh Water Tanks And Fire Fighting Foam Tanks - Jotun Scheme. Paint Fore Peak Tanks, Cofferdams And Cable Locker With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Primer - Pen Guard Primer(Red)-50 Microns Dft , 019 Painting Fore Peak Tank, Ballast Tank, Cable Locker , Cofferdam, Fresh Water Tanks And Fire Fighting Foam Tanks - Jotun Scheme. . Paint Fore Peak Tanks, Cofferdams And Cable Locker With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Jota Coat Universal (Aluminium) - 150 Microns , 019 Painting Fore Peak Tank, Ballast Tank, Cable Locker , Cofferdam, Fresh Water Tanks And Fire Fighting Foam Tanks - Jotun Scheme. . Paint Fore Peak Tanks, Cofferdams And Cable Locker With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Jota Coat Universal (Grey) - 150 Microns , 019 Painting Fore Peak Tank, Ballast Tank, Cable Locker , Cofferdam And Fire Fighting Foam Tanks - Jotun Scheme. . Paint Fore Peak Tanks, Cofferdams And Cable Locker With Following Paint Scheme:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (D) 4Th Coat: Pen Guard Top Coat -50 Microns , 020 Surface Preparation Fresh Water And Fresh Water Gravity Tanks. Carry Out Mechanical Cleaning To St 3 Standard As Survey Report Of Paint Oem For Paint Application. Fresh Water Tanks, Foam Tank And Fresh Water Gravity Tanks , 021 Painting Fresh Water And Fresh Water Gravity Tanks- Jotun Scheme. Paint Both Fresh Water Tanks/ Foam Tanks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Pen Guard Hb (White)- 1X100 Microns Dft , 021 Painting Fresh Water And Fresh Water Gravity Tanks- Jotun Scheme. Paint Both Fresh Water Tanks/ Foam Tanks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: Pen Guard Hb(Grey) - 1X100 Microns Dft , 021 Painting Fresh Water And Fresh Water Gravity Tanks- Jotun Scheme. Paint Both Fresh Water Tanks/ Foam Tanks With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Rd Coat: Pen Guard Hb(White) - 1X100 Microns Dft , 022 Surface Preparation Internal Compartments - Bilges Of Engine Room And Asp Compartment Carry Out Mechanical Cleaning To St 1 Standard As Survey Report Of Paint Oem For Paint Application. , 022 Surface Preparation Internal Compartments - Bilges Of Engine Room And Asp Compartment Carry Out Mechanical Cleaning To St 3 Standard As Survey Report Of Paint Oem For Paint Application. , 023 Painting Bilges Of Engine Room And Asp Compartment - Jotun Scheme. Paint Bilges Of Engine Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Primer - Pen Guard Primer(Red) - 50 Microns Dft , 023 Painting Bilges Of Engine Room And Asp Compartment - Jotun Scheme. Paint Bilges Of Engine Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also (B) 2Nd Coat: Anticorrosive - Jota Coat Universal N10(Aluminium) - 150 Microns , 023 Painting Bilges Of Engine Room And Asp Compartment - Jotun Scheme. Paint Bilges Of Engine Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also (C) 3Rd Coat: Anticorrosive - Jota Coat Universal N10(Grey) - 150 Microns , 023 Painting Bilges Of Engine Room And Asp Compartment - Jotun Scheme. Paint Bilges Of Engine Room And Asp Compartment With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also (D) 4Th Coat: Top Coat -Pen Guard Top Coat(Grey 38)- 50 Microns , 024 Surface Preparation Bulkheads Of Engine Room And Srp Compartments And Living Spaces. (A) Carry Out Mechanical Cleaning To St 3 Standard As Survey Report Of Paint Oem For Paint Application. , 024 Surface Preparation Bulkheads Of Engine Room And Srp Compartments And Living Spaces. (B) Carry Out Mechanical Cleaning To St 1 Standard As Survey Report Of Paint Oem For Paint Application. , 025 Painting Bulkheads Of Engine Room And Srp Compartments And Living Spaces - Jotun Scheme. Paint Bulkheads Of Engine Room And Srp Compartments And Living Spaces ,With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (A) 1St Coat: Primer - Pen Guard Primer - 50 Microns Dft , 025 Painting Bulkheads Of Engine Room And Srp Compartments And Living Spaces - Jotun Scheme. Paint Bulkheads Of Engine Room And Srp Compartments And Living Spaces ,With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (B) 2Nd Coat: White Interior Fire Retardant Paint 100 Microns Dft , 025 Painting Bulkheads Of Engine Room And Srp Compartments And Living Spaces - Jotun Scheme. Paint Bulkheads Of Engine Room And Srp Compartments And Living Spaces ,With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. (C) 3Nd Coat: White Interior Fire Retardant Paint 100 Microns Dft , 026 Air Pressure Testing Air Pressure Test The Following Tanks To 0.14 Kg Per Sq. Cms And Rectify The Defects Any Observed During Pressure Testing And Prove. Note:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003(C) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. Fresh Water Tank- 01 ,Foam Tank -01, Lub Oil Tank-01 , Fo Tank -02, Fods Tank -02, Fore Peak Tank-01, Void Space/Ballast Tank -02 , 027 Bilge Platform Plate (A) Renew Bilge Platform Plate. Material- Aluminium Chequered Plate, Thickness- 05 Mm , 027 Bilge Platform Supporting Brackets (B) Bilge Platform Supporting Brackets At Indicated Locations To Be Renewed. Mat - Ms , 028 Key Fender Securing Arrangement (A) Removal Of Head And Stern Key Fenders For Hull Survey. Post Repair On Hull , Fender Fitment To Be Carried. , 028 Key Fender Head & Stern Fenders Key Fender Securing Arrangement (B) Coaming Plate And Partition Plates Between Fenders Corroded, Thinned And Holed. All Fittings To Be Renewed As Per Survey Reports . Note: - Work Involves Removal Of Head And Stern Key Fenders For Hull Survey And Repair/ Renewal Of Top And Bottom Securing Brackets/ Plates And Partition Plates. Top And Bottom Securing Brackets/ Plates And Partition Plates Size: 130Mm X 8Mm Thick , 028 Key Fender Head & Stern Fenders Key Fender Securing Arrangement (C) Renewal Securing Rod - M24 Dia , Length Of Rod Varies Between 1225 Mm To 620 Mm. All Nuts Are To Be Tack Welded Post Tightening. , 028 Key Fender (D) All Head Key Fenders To Be Renewed With White Colour Fenders As Per Sizes. Specification - Epdm Rubber As Per Nes 170.Crossection Size 250Mmx250mm. Length Of Fenders Varies Between 729Mm To 633 Mm. . Note: Quote For Material Only View Services Covered At Sl (A) , 028 Key Fender (E) All Aft Key Fenders To Be Renewed With White Colour Fenders As Per Size Cross Section Size 250Mmx250mm. . Length Of Fenders Varies Between 1126Mm To 520 Mm. Note: Quote For Material Only View Services Covered At Sl (A) , 028 Fender (E) Portable Pneumatic Fender To Be Provided By Firm. , 028 Fender (E) Portable Fender (Apple Buoy Fender) To Be Provided By Firm. , 029 Tyre Fender Tyre Fender Damaged On P&S Side To Be Renewed With Used Aircraft Tyre Fenders Moulded With 8 Mm Layer Of White Natural Rubber On Top And Outer Sides. Mat- Rubber, Colour-White. No Painting Will Be Permitted. Any Other Type Of Tyres Not To Be Used. (A) Od 750Mm; Id 450 Mm , Width - 350 Mm , 029 Tyre Fender Tyre Fenders Damaged On P&S Side To Be Renewed With Used Automobile Tyre Fenders Moulded With 8 Mm Layer Of White Natural Rubber On Top And Outer Sides. Mat- Rubber, Colour-White. No Painting Or Coating Of Any Other Form Will Be Permitted. Vendors To Adhere To Sow (B) Tyre Fender Od-1400 Mm Id -1000 Mm Width -350 Mm , 030 Tyre Fender Securing Arrangement Tyre Fender To Be Secured With 14 Mm Dia Chain On Head, Stern And Ship Side (A) Securing Chains: 14Mm Dia(Mat-Gi) , 030 Tyre Fender Securing Arrangement Tyre Fender To Be Secured With D Shackles On Ship Side (B) D Shackles 14 Mm Dia(Mat-Gi) , 030 Tyre Fender Securing Arrangement Securing Chain Is To Be Passed Through Metallic Sleeves. Firm To Undertake Primer And Anti Corrosive Paint On All Metallic Sleeves. (C) Securing Sleeves Of Dia 03 Inch And Length 250 Mm (Mat Ms Pipe Of 06Mm Thick) , 030 Tyre Fender Securing Arrangement Tyre Fenders Securing Eye Plates To Be Welded Along Ships Side For Connecting Of Securing Chains (D) Eye Plate Thickness 8 Mm. (Mat - Ms) , 031 Under Water Fenders (A) Underwater Fenders To Be Removed, Inspected And Surveyed And Necessary Repairs To Be Attended On Fender Securing Brackets(C Channel) And Associated Hull. , 031 Under Water Fenders (B) ) All Underwater Fenders To Be Renewed As Per S Le, Black Colour Fenders Below Water And Above Water Fenders With Grey/White Colour Fenders To Be Renewed. Specification - Epdm Rubber As Per Nes 170, D Fenders Max Size--D Fender 250X250x1000mm , 031 Underwater Fenders Securing Arrangement (C) Fenders Is To Be Secured With Proper Nut, Bolt And Washers As Per S Le. (Mat - Ms With Nickel Coating), Nut & Bolt Dia -20 Mm, Bolt Length-370 Mm, Washer Dia-22Mm) (Note : Quote For Nuts Bolts And Associated Accessories Also) , 032 Metallic Half Pipe Fender Metallic Half Pipe Fender Around The Shipside To Be Renewed. (A) Size - 150Mm Dia, 08Mm Thick & Size - 160Mm Dia, 08Mm Thick , 033 Bulwark Coaming Bulwark Coaming Plate Corroded And Thinned. To Be Included In Hull In Survey And Renew As Per Survey Report Along With Coaming Rod. (A) Bulwark Area Thickness-8 Mm , 033 Bulwark Coaming Bulwark Coaming Pipes Corroded And Thinned. To Be Included In Hull In Survey And Renew As Per Survey Report. (B) Pipe On Bulwark - Size- Dia 3 , Mat-Ms , 034 Anchor And Chain Cable Anchor Chain Cable And Associated Fittings Are To Be Mechanically Cleaned, Eased For Free Movement, Hydro Jet Blast Chain Cable To Bare Metal, Paint With Black Bituminous Paint Post Survey Iaw No 07/11 And Refit Back. Renew Off All Such Parts Which Declared Unserviceable & Prove Load Test And Submit Load Test Certificate To Coy Office. The Following Job Involves Removal Of All Anchor Accessories, Laying Out And Hydro Jet Blasting For Survey And Painting And Final Refitment Post Survey By Nd (V. Anchor Chain Cable Associated Fittings Are To Be Mechanically Cleaned, Eased For Free Movement, Paint With Black Bituminous Paint Post Survey Iaw No 07/11 And Refit Back. , 034 Anchor And Chain Cable (A) Chain Cable To Be Removed. Laying Out And Hydro Jet Blasting To Be Undertaken And Presented For Survey. Post Successful Survey Of Item To Be Painted As Per Norms. Anchor Chain Cable Associated Fittings Are To Be Mechanically Cleaned, Eased For Free Movement, Painted With Black Bituminous Paint Post Survey Iaw No 07/11 And Refit Back. , 034 Anchor And Chain Cable (B) Swivel Piece To Be Removed. Laying Out And Hydro Jet Blasting To Be Undertaken And Presented For Survey. Post Successful Survey Of Item To Be Painted As Per Norms. Anchor Chain Cable Associated Fittings Are To Be Mechanically Cleaned, Eased For Free Movement, Painted With Black Bituminous Paint Post Survey Iaw No 07/11 And Refit Back. , 034 Anchor And Chain Cable (C) Lug Less Joining Shackles To Be Removed. Laying Out And Hydro Jet Blasting To Be Undertaken And Presented For Survey. Post Successful Survey Of Item To Be Painted As Per Norms. Anchor Chain Cable Associated Fittings Are To Be Mechanically Cleaned, Eased For Free Movement, Painted With Black Bituminous Paint Post Survey Iaw No 07/11 And Refit Back. , 034 Anchor And Chain Cable (D) D Shackles To Be Removed. Laying Out And Hydro Jet Blasting To Be Undertaken And Presented For Survey. Post Successful Survey Of Item To Be Painted As Per Norms. Anchor Chain Cable Associated Fittings Are To Be Mechanically Cleaned, Eased For Free Movement, Painted With Black Bituminous Paint Post Survey Iaw No 07/11 And Refit Back. , 034 Anchor And Chain Cable (E) Anchor To Be Removed. Laying Out And Hydro Jet Blasting To Be Undertaken And Presented For Survey. Post Successful Survey Of Item To Be Painted As Per Norms. Anchor Chain Cable Associated Fittings Are To Be Mechanically Cleaned, Eased For Free Movement, Painted With Black Bituminous Paint Post Survey Iaw No 07/11 And Refit Back. , 035 Anchor Windlass Overhauling Of Anchor Windlass To Be Carried Out And Prove For Satisfactory Operation. Note :- Overhaul Involves Removal Of Drum, Gearbox, Renewal Of Brake Lining, Oil And Oil Sight Glass. Oil Grade Vg 150 , 036 Capstan Overhaul Q- Deck Capstan And Prove For Satisfactory Operation. Dia 400 Mm Note :- Overhaul Involves Removal Of Drum, Gearbox, Renewal Of Brake Lining And Recharge Of Fresh Gear Box Oil. Oil Grade Vg 150 , 037 Single Bollards (A) Single Bollards Corroded, Thinned And Holed. To Be Repaired As Per Survey Report. Details :- Size Of Pipe: Single Bollards ,Size: 250Mm Dia, 10 Mm Thickness, 1300 Mm Length. Doubler Plate Of Dia 300Mm And 10Mm Thick, Dummy Plate Of 300Mm Dia And 12Mm Thick, Supporting Bracket Of Bollard Pipe Of 380Mmx360mmx10mm. Tripping Bracket Of Size 250Mmx150mm And 03 Nos On Each Bollard. , 037 Single Bollards (B) Single Bollards Corroded, Thinned And Holed. To Be Renewed As Per Survey Report. Details :- Size Of Pipe: Single Bollards ,Size: 250Mm Dia, 10 Mm Thickness, 1300 Mm Length. Doubler Plate Of Dia 300Mm And 10Mm Thick, Dummy Plate Of 300Mm Dia And 12Mm Thick, Supporting Bracket Of Bollard Pipe Of 380Mmx360mmx10mm. Tripping Bracket Of Size 250Mmx150mm And 03 Nos On Each Bollard. , 037 Small Twin Bollard (C) . Twin Bollards Corroded, Thinned And Holed. To Be Repaired As Per Survey Report . Dia Of Bollard Pipe 11 Inch . Height Of Bollard 15 Inch (02Nos). Size Of Bollard Base/ Foundation: 1.14Mtr X 0.4Mtr, Thickness Of Pipe: 10 Mm. Doubler Plate Size: 125X49cm, Thickness: 10Mm , 037 Small Twin Bollard (D) . Twin Bollards Corroded, Thinned And Holed. To Be Renewed As Per Survey Report . Dia Of Bollard Pipe 11 Inch . Height Of Bollard 15 Inch (02Nos). Size Of Bollard Base/ Foundation: 1.14Mtr X 0.4Mtr, Thickness Of Pipe: 10 Mm. Doubler Plate Size: 125X49cm, Thickness: 10Mm , 037 Twin Bollard (E) Large Twin Bollards Corroded, Thinned. Entire Bollard To Be Renewed As Per Hull Survey Report. Dia Of Bollard Pipe 340 Mm. Height Of Bollard 1400Mm. Size Of Bollard Base/ Foundation 1575X575x10 Mm: , Thickness Of Pipe: 10 Mm. Doubler Plate Size: 1575X575x10 Mm , Thickness: 10 Mm, Tripping Bracket 150X10 Mm , 038 Rubber Beading Rubber Beading Of Wt Doors , Hatches, Scuttles Perished/Cracked To Be Renewed And Chalk Test To Be Proved. Wt Door. (A) Rubber Beading Size: Specification As Per S Le.Note: Silicon Rubber Beading To Be Used As Per Ncd 5910 , 038 Clips Operating Clips Of Wt Doors , Hatches, Scuttles Sky Light Corroded/Thinned To Be Overhauled And Chalk Test To Be Proved. , 039 Wt Hatch Metal Coaming Metallic Coaming Of 05 In No Wt Hatches On Weather Deck Corroded And Thinned. To Be Renewed As Per Survey Report. Area - 20 Sqm. , 040 Nwt Doors Nwt Wooden Doors At Various Locations Perished /Damaged. To Be Renewed/Repaired Including Frames. , 041 Ventilation Following Mushroom Type Ventilators To Be Removed, Cleaned/ Overhauled And Fitted Beck. ( A) Dia: 550Mm Dia , 041 Ventilation Following Mushroom Type Ventilators To Be Removed, Cleaned/ Overhauled And Fitted Beck. (B) Dia - 360Mm Dia , 042 Towing Hook Towing Hook To Be Overhauled And Load Tested To 25 Tons . Note 1 -The Job Involves Overhaul Of Operating Handle, Steel Wire Rope And In Way Pullies.Note 2 - Firm To Project For Load Testing To Coy. Load Testing Will Be Undertaken By Nd(Vzg). Any Defects Occurred During Load Testing Will Be Rectified By The Firm. , 043 Tanks/Manhole (A) Manholes Including Coaming To Be Renewed As Per Survey Carried In Dl No. 0003 Size Of Manhole: 720X520x08mm Thick , 043 Tanks/Manhole (B) Rubber Joints Of 720Mmx520mmx06mm Perished/Deteriorated To Be Renewed , 043 Tanks/Manhole (C) Nuts And Bolts/ Studs Of 16 Mm Dia And 50 Mm Length -24 Nos. On Each Manhole. Mat-Ss , 044 Nav Light Nav Light Foundation (Port & Stbd) Corroded, To Be Renewed. Size: 620Mmx620mmx300mm And Thickness 6Mm, Mat Ms , 045 Drainage System (A) Deck Drain Pipes Corroded/ Holed, To Be Renewed. Dia 2 1/2 Inch. Mat: Gi Note : Pipes / Fittings Should Be Secured With Rubber Packings And Cl S Uniformly , 045 Drainage System (B) Scupper With Coaming Of Drain Pipe ( Leading From 01 Deck To No. 1 Deck And Bridge Top To Platform Deck Corroded/ Thinned, To Be Renewed. Size: 250Mmx200mm , 045 Drainage System (C ) Deck Drain Pieces On Upper Deck Corroded, To Be Renewed. Dia 2 1/2 Inch, Each Of Length 01Mtr. Note-The Job Involves Removal/Renewal And Fitment Of Pipes/ Panelling/ Lagging/ Trunking In The Way. , 045 Drainage System (D) 4 Soil Pipes Of Crew, Eds And Masters Bathrooms To Be Removed Chemically Cleaned And Fit Back. , 045 Drainage System (E) 4 Soil Pipes Of Crew, Eds And Masters Bathrooms Corroded/Holed To Be Renewed , 046 Extinguishers Replace With New Of Following Extinguishers At Various Places. (A) 9 Ltr Afff Extinguisher , 046 Extinguishers Replace With New Of Following Extinguishers At Various Places (B) 2 Kg Co2 Extinguisher , 046 Extinguishers Replace With New Of Following Extinguishers. (C) 10 Kg Dcp Extinguisher , 046 Extinguishers Replacement Of Following Hoses With New At Various Places (D) Fire Hoses , Fire Hoses Length 15 Mts Dia 63 Mm With End Coupling Of Al , 047 Foam Solution Filling Of Type 3% Afff Concentrate For Forming Mechanical Foam For Foam Tank , 48 Deck Underlay Deck Covering To Be Repaired/ Renewed At Uprooted/ Damaged/ Steel Renewed Places, Accommodation Areas, Wheel House And Wet Compartments Note;- Dry Compt Area-110 Sqm, Wet Compt Area-30 Sqm, Dadoes Area- 15 Sqm (A) Application Of Underlay As Per Ncd 3717 , 048 Deck Underlay Deck Covering To Be Repaired/ Renewed At Uprooted/ Damaged/ Steel Renewed Places, Accommodation Areas, Wheel House And Wet Compartments Note;- Dry Compt Area-110 Sqm, Wet Compt Area-30 Sqm, Dadoes Area- 15 Sqm (B) Application Of Sealer Coat And Top Coat On Entire Area As Per Ncd 3717. , 049 Lifebuoy Lifebuoys To Be Painted As Per S Le Including Lettering And Symbols. , 050Lifer Raft Securing Stand Securing Stand Of Life Rafts Perished And Damaged. To Be Renewed. , 050Lifer Raft Securing Stand Life Rafts Are To Be Secured With Rubber Lining At Securing Stand, Including Fitment Of Hrg. , 051 Name Board Tug Name Board Perished/Damaged , To Be Renewed (A) Vessel Illuminating Board-01, , 051 Name Board (B) Tug Name Board (Wooden) Damaged, To Be Renewed Including Wooden Pad. And Letters (Ss) Are To Be Electroplated. , 051 Name Board (C) Electroplating Of Tug Name Board Tallies (Brass) Letters To Be Carried Out. , 051 Name Board (C) Word Letter Of Tug Name (Bc Dutt) On Bulwark Perished At Fwd And Stern , To Be Renewed, Tug Name Is To Be Painted With Fluorescent Paint. , 052 Door Locks Mortise Lock Of Non Wt Door Defective At Various Locations , All Defective Mortise Locks To Be Renewed. , 053 Locking Arrangement Locking Arrangement Is To Be Provided In All The Wt Doors At Various Locations Including Hasp And Staple Arrangement , 054 Sunmica Deck Head Sunmica Damaged At Various Locations , To Be Renewed , 055 Mfmb Lagging Degutting/Regutting Of Mfmb Lagging At Accommodation Area, Wheel House To Be Carried Out. Quoted Cost Should Including Services And New Material , 056 Pipe Lines Chemical Cleaning Of Soil And Fresh Water Pipe Lines At Various Places , 057 Sanitary System Wc Of Crew And Master Cabin Corroded/Thinned/Holed To Be Renewed Including Base Plate Repairs (A) .Wc Commode Along With Suitable Arrangement (Flush Tank, Piping, Valves Etc.) To Be Replaced With New Note:- Quoted Repair Cost Shall Include Cost All Items. , 057 Sanitary System Wash Basin Including Drain Pipes Of Crew And Master Cabin Corroded/Thinned/Holed To Be Renewed (B) Wash Basin Including Drain Pipes Note:- Quoted Repair Cost Shall Include Cost All Items. , 057 Sanitary System (C)Ss Tap: 1/2 Inch Damaged To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items. , 057 Sanitary System (D).Supply Pipes Deformed To Be Renewed. Mat : Cu-Ni, Note:- Quoted Repair Cost Shall Include Cost All Items , 057 Sanitary System (E) Drain Pipe: Mat-Ms,Dia- 2 Inch To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items , 057 Sanitary System (F) Water Faucet Set For Toilet To Be Replaced With New , 057 Sanitary System (G) Mirror As Per S Le To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items , 057 Sanitary System (H) Ss Stop Cock 1 Damaged To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items , 057 Sanitary System (J) Fwd Pipe Lines Corroded/Thinned/Holed To Be Renewed. (Dia. 2 Inch) (Mat - Cuni) Note:- Quoted Repair Cost Shall Include Cost All Items , 057 Sanitary System (K) Shower Head In Bathrooms Damaged I To Be Renewed. Note:- Quoted Repair Cost Shall Include Cost All Items , 058 Panelling Panelling In Living Spaces/Wheel House And Other Areas , Damaged At Various Locations , To Be Renewed As Indicated By Ss/ Rmt (Mat-Wood) , 059 Kit Lockers Kit Lockers In Crew Cabin And Master Cabin Damaged To Be Renewed, (Mat-Crca) , 060 Fisherman Plate Corroded/Thin/Holed , To Be Renewed Mat-Ms (A) Fish Plate Size: 20X20 Inch, 10Mm Thickness , 060 Fisherman Plate Corroded/Thin/Holed , To Be Repaired Mat-Ms (B) Doubler Plate Size:28X28inch, 10 Mm Thickness , 060 Fisherman Plate Corroded/Thin/Holed , To Be Renewed Mat-Ms (C) Angle Bar 3 X1.5 Inch , 061 Butterfly Nut Ss Butterfly Nuts And Tumbler Bolt Of Engine Room Sky Light &Exhaust Flaps Broken. To Be Renewed. Dia Of Bolt : 20 Mm & 6 Inch Length (Mat-Ss) Including Rubber Beading . Rmt-4 Rmt , 062 Guard Rail Guard Rails On 01 & 02 Deck (Port Side) Corroded/Perished . To Be Renewed. (Mat-Gi Pipe) Dia Of Guard Rail Pipe:1 ¾, , 063 Guard Rail Securing Chain Guard Rails Securing Chain On 01 & 02 Deck (Port Side) Corroded/Perished . To Be Renewed. Mat-Gi , 064 Non Wt Door Non Water Tight Door Of Bridge And Living Spaces Damaged Including Frames, To Be Renewed. , 065 Ventilation Vent Pipes Including Head Of Various Tanks On Upper Deck Corroded And Thinned, To Be Renewed. (Mat. Gi Pipe). , 066 Ventilation Wire Mesh Of All Air Vent Corroded/Perished. To Be Renewed. , 067 Bulwark Doors Bulwarks Doors On Weather Deck Jammed /Dented/Damaged. To Be Renewed , 068 Cleats Ms Cleats On (P & S) Bulwark Damaged, To Be Renewed Including Doubler Plate . Size 28 Mm , 069 Boxes (A) Fire Hoses Securing Boxes And Its Glass Damaged At Various Locations , To Be Renewed. As Per Navy Standard , 069 Boxes (B) Boxes Of Various Control Panel Corroded/Thinned/Holed At Various Locations, To Be Renewed As Per Existing As Fitted S Le. (Mat-Ms) , 070 Wooden Cup Board Wooden Lockers Damaged At Various Locations To Be Renewed. Job Including Renewal Of Lockers And Hands. , 071 Sofa Sofa Cushion Torned In Ed ,Master And Crew Rest Room , Sofa To Be Renewed. , 072 Panelling Ss Panelling At Indicated Locations Damaged To Be Renewed. , 073 Water Purifier Firm To Supply And Install New Water Purifier (Ro+Uf+Tds, Storage Cap 8 Ltrs) . Additionally Firm To Supply 02 Sets Of Following Spares :- (A) Ro Membrane Welded , (B) Ro Membrane High Flow(C) Inline Carbon Filter ,(D) Inline Sediment Filter-(E) Activated Carbon Filter (Excel Elite) , (F) Post Carbon Filter , 074 Water Cooler Firm To Replace With A New Water Cooler In Crew Dining Hall. Water Storage Cooler Cum Water Purifier (Ro/Uv), Water Storage Capacity 30 Ltrs. Firm To Consider All Cost W.R.T. To Fitment Of Water Cooler And Prove For Optimum Performance. Details Of Water Cooler:- Minimum Three Stage Purification 1St Stage Of Purification:- Sediment Filtration , 2Nd Stage Of Purification:- Carbon Filtration, 3Rd Stage Of Purification:- Uv Filtration, Body Material :- Stainless Steel, Storage Tank Material:- Ss 304,Thermal Insulation For Storage Tanks:- Puf , No Of Water Faucets:- 02, Make:- Aqua Guard/Voltas/Blue Star. Firm To Provide 02 Sets Of All Filters. , 075 Fixed H2s Sensor Firm To Undertake Calibration/Serviceability Checks Of Fixed H2s Sensors In The Vicinity Of Stp Compartment. (Oem - Hi-Point Services Pvt. Ltd.). Note:- H2s Sensors Firm To Undertake Calibration/Serviceability Checks Certificate By Oem To Be Submitted. , 076 Portable H2s Sensors. Replace With New Of Portable H2s Sensors . (Oem - Hi-Point Services Pvt. Ltd.) Note:- Trial Report Along With H2s Sensors Firm To Undertake Calibration/Serviceability Checks Certificate By Oem To Be Submitted. , 077 Bunk Bunk In Crew Rest Room / Master Room Damaged To Be Repaired. Mat-Crca , 078 Wooden Panelling Panelling In Living Spaces/Wheel House And Other Areas , Damaged At Various Locations , To Be Renewed. Mat Sunmica , 079 Seating Arrangement Metallic Seating Arrangement On Foxle Corroded, Thinned And Holed. Seating Arrangement To Provisioned. Size: 1500X750x700mm. Mat: Ms Plate: 06Mm Thickness, Stand Made Of Angles And Welded On Deck. , 080Mattress Mattress To Be Replaced With New Mattress For Crew Cabin As Per S Le. , 081 Awning Repair Of Damaged Awning Shade Frame At Foxle Of Gi Pipes And Fitment Of The Same On Fwd. A) Size: 2M X 5.5 M Approx. Mat: Gi Pipe , 081 Awning Repair Of Damaged Awning Shade Frame At Aft Side Of Gi Pipes And Fitment Of The Same On Fwd. And Aft On Weather Deck Area. (B) Size - 6 X 3 M Approx. , 081 Pvc Awning Pvc Awning At Foxle And At Aft Side (C) Renewal Of Pvc Awning/Roofing Sheet Over The Frame Using Nut Bolt. Mat - Pvc. Size - 3Mm Thickness , 081 Awning Repair Of Damaged Awning Shade Frame At Aft Side Of Gi Pipes And Fitment Of The Same On Fwd. And Aft On Weather Deck Area. (B) Size - 6 X 3 M Approx. , 081 Pvc Awning Pvc Awning At Foxle And At Aft Side (C) Firm To Supply New Awning And Fitment Of Pvc Awning Over The Frame Using Securing Rope. Mat - As Per S Le. , 082 Life Saving Appliance (A) Firm To Supply New Stretcher (Neil Robertson Stretcher). , 082 Life Saving Appliance (B) Firm To Replace With New Life Raft Securing Arrangement (Polyester Webbing With Ss Slip) Including Hydrostatic Release Unit (Hru Hammer H20 R), Eye On Deck. , 082 Life Saving Appliance (C) Firm To New Life Buoy (Tug Name To Be Indicated) , 082 Life Saving Appliance (D) Firm To Replace With New Life Buoy With Mob Light & Smoke Signal With Securing Bracket , 082 Life Saving Appliance (E) Firm To Replace With New Life Jacket Made As Per Solas/Irs/Mmd Standard (With Iso Certificate). Jacket To Be Fitted With Three Buckle With Adjustable Belt Whistle Attached With A Lynyard Reflective Tape 04 Nos , 083 Misc (A) Firm To Replace With New Polyester Webbing Slings Capacity 5 Tons, Length 6.5 Mtrs , 083 Misc (B) Firm To Replace With New Self Adhesive Photo Luminescent Stickers Imo Symbols & Safety Sign/Escape Route Sign. (150 Mm X 150Mm) . Firm To Provide Stickers As Per S Le , 083 Misc (C) Water Stagnation At Wheel House Deck. Firm To Provision Proper Drainage By Ensuring A Slight Slope , Installing Deck Level Drainage Using Durable, Rust Resistant Piping. , Engineering1001eqpt : Fuel Transfer Pumps Make : Roysons, Model-Sfgp-36,Sl No-300386, Type: Rotary Gear Pump, Capacity : 06 Cum/Hr, Firm To Supply And Replace With New Spares/Material Required For Renewal. , 1001Eqpt : Fuel Transfer Pumps Make : Roysons(A) Overhauling Of Pump To Be Carried Out. Pump To Be Dismantle Completely And All Parts To Be Inspected. Damaged & Defective Parts To Be Replaced With New Spares. Post Overhauling, Pump To Be Proved For Satisfactory Operation. Vibration Analysis Of Pump To Be Carried Out And Same To Be Recorded. Post Successful Trials Of Pump, Trial Report To Be Rendered. , 1001Eqpt : Fuel Transfer Pumps Make : Roysons(B) Fitment And Alignment Of Pump With Motor To Be Carried Out. Misalignment To Be Corrected , 1001Eqpt : Fuel Transfer Pumps Make : Roysons(C) Firm To Supply & Fitment Of Three Jaw Coupling To Be Carried Out. , 1001Eqpt : Fuel Transfer Pumps Make : Roysons(D) Firm To Provide Coupling (As Per S Le) For Pump , 1001Eqpt : Fuel Transfer Pumps Make : Roysons(E) Firm To Supply And Fitment Of All Foundation Nut And Bolts (M 16, Material -Ss, Length As Per S Le ) To Be Carried Out , 1001Eqpt : Fuel Transfer Pumps Make : Roysons(F) Firm To Supply New Spares And Fitment Of Suction Pressure Gauges To Be Carried Out. Suction Gauge Range -1 To 1.5 Bar. The Gauges Should Be Glycerine Filled. , 1001Eqpt : Fuel Transfer Pumps Make : Roysons(G) Firm To Supply New Spares And Fitment Of Discharge Pressure Gauges To Be Carried Out. Discharge Gauge Range 0 To 10 Bar. The Gauges Should Be Glycerine Filled. , 1002Eqpt : General Service Pump, Capacity: 35 M3/Hr. Firm To Supply And Replace With New Spares/Material Required For Renewal. , 1002Eqpt :General Service Pump(A) Firm To Supply New Pumps. Pump To Be Fitted At Place And Prove For Satisfactory Operation. . Make Be/Johnson/ Spx, Capacity: 35 M3/Hr. Post Successful Trials Of Pump, Trial Report To Be Rendered. , 1002Eqpt :General Service Pump(B)Fitment And Alignment Of Pump With Motor To Be Carried Out. Misalignment To Be Corrected , 1002Eqpt :General Service Pump(C) Fitment Of Three Jaw Coupling To Be Carried Out. , 1002Eqpt :General Service Pump(D) Firm To Provide New Mechanical Seal For Pump (As Per S Le) , 1002Eqpt :General Service Pump(E) Firm To Provide Coupling (As Per S Le) For Pump , 1002Eqpt :General Service Pump(F) Firm To Supply New Spares And Fitment Of Foundation Nut And Bolts (M 16, Material -Ss) To Be Carried Out , 1002Eqpt :General Service Pump(G) Firm To Supply New Spares And Fitment Of Suction Gauges To Be Carried Out .Suction Gauge Range -1 To1. 5 Bar . The Gauges Should Be Glycerine Filled. , 1002Eqpt :General Service Pump(H) Firm To Supply New Spares And Fitment Of Discharge Pressure Gauges To Be Carried Out. Discharge Gauge Range 0 To 10 Bar. The Gauges Should Be Glycerine Filled. , 1002Eqpt :General Service Pump(J) Firm To Supply New Spares And Fitment Of Instrumentation Gauges Pipes (Rmt- 02 Mts) With Suitable End Fittings To Be Carried Out , 1002Eqpt :General Service Pump(K) Firm To Supply New Spares And Fitment Of Isolating Cock To Be Carried Out. Mat: Cuni, Dia:1/4 Inch. , 1002Eqpt :General Service Pump(M) Firm To Supply New Spares And Fitment Of Durettes (Dia-80Mm) Length - 30Cm To Be Carried Out , 1002Eqpt :General Service Pump(N) Pump Bed To Be Repaired And Cleaning & Painting To Be Carried Out , 1002Eqpt :General Service Pump(P) Casing, Shaft And Impeller To Be Chemically Cleaned And Checked For Pitting. , Followed By Surface Finishing , 1002Eqpt :General Service Pump(Q) Firm To Supply New Spares And Fitment Of Purging Cocks And Adaptors To Be Carried Out , 1002Eqpt :General Service Pump(R) Firm To Supply New Spares And Fitment Of Flexible Hose Pipes Wire Braded 1/2 Inch, Length 1/2 Mts To Be Carried Out , 1003Eqpt/System: Fresh Water Pumps, Make: Be Pumps, Model- A03110k/Ms-3/Dgs-2/316, Type: Single Stage, Self Priming, Centrifugal Cap: 2Cu.M/Hr, Firm Not To Quote , 1003Eqpt/System: Fresh Water Pumps(A) Overhauling Of Pump To Be Carried Out. Pump To Be Dismantle Completely And All Parts To Be Inspected. Damaged & Defective Parts To Be Replaced With New Spares. Post Overhauling, Pump To Be Proved For Satisfactory Operation. Vibration Analysis Of Pump To Be Carried Out And Same To Be Recorded. Post Successful Trials Of Pump, Trial Report To Be Rendered. , 1003Eqpt/System: Fresh Water Pumps(B) Fitment And Alignment Of Pump With Motor To Be Carried Out. Misalignment To Be Corrected , 1003Eqpt/System: Fresh Water Pumps(C) Fitment Of Shaft Coupling To Be Carried Out. Firm To Provide Coupling For Drive Shaft (As Per S Le) For Pump , 1003Eqpt/System: Fresh Water Pumps(D) Firm To Supply And Fitment Of All Foundation Nut And Bolts ( M 16, Material -Ss) To Be Carried Out , 1003Eqpt/System: Fresh Water Pumps(E) Firm To Supply New Spares And Fitment Of Suction Pressure Gauges To Be Carried Out. Suction Gauge Range -1 To 1.5 Bar. The Gauges Should Be Glycerine Filled. , 1003Eqpt/System: Fresh Water Pumps(F) Firm To Supply New Spares And Fitment Of Discharge Pressure Gauges To Be Carried Out. Discharge Gauge Range 0 To 10 Bar. The Gauges Should Be Glycerine Filled. , 1003Eqpt/System: Fresh Water Pumps(G) Firm To Supply New Spares And Fitment Of Instrumentation Gauges Pipes (Rmt- 02 Mts) With Suitable End Fittings To Be Carried Out , 1003Eqpt/System: Fresh Water Pumps(H) Firm To Supply And Fitment Of Isolating Cock To Be Carried Out. Mat: Cuni, Dia:1/4 Inch. , 1004Eqpt/System: Srp Cooling Sea Water Pump, Make : Be Pumps , Model A5110kk-Dgs2-316, Type: Single Stage ,Self Priming,Centrifugal , Cap : 15 M3/Hr. , 1004Eqpt/System: Srp Cooling Sea Water Pump(A) Overhauling Of Pump To Be Carried Out. Pump To Be Dismantle Completely And All Parts To Be Inspected. Damaged & Defective Parts To Be Replaced With New Spares. Post Overhauling, Pump To Be Proved For Satisfactory Operation. Vibration Analysis Of Pump To Be Carried Out And Same To Be Recorded. Pump Bed To Be Cleaned And Painting To Be Done. Post Fitment And Alignment Of Pump With Motor. Post Successful Trials Of Pump, Trial Report To Be Rendered. , 1004Eqpt/System: Srp Cooling Sea Water Pump, Make : Be Pumps , Model A5110kk-Dgs2-316, Type: Single Stage ,Self Priming,Centrifugal , Cap : 15 M3/Hr.(B) Firm To Replace With New Sea Water Pump For Srp System Cooling And Prove For Satisfactory Performance. Job Includes Supply Of Be Pump Or Other Make With Equivalent Capacity. Fabrication Of Foundation Frame As Suitable To Fitment Of Pump At Place Along With Motor. Post Fitment Alignment Of Pump-Motor To Be Undertaken. Prove Pump For Satisfactory Performance. , 1004Eqpt/System: Srp Cooling Sea Water Pump(C) Firm To Supply New Spares And Fitment Of Spider Jaw Coupling To Be Carried Out. , 1004Eqpt/System: Srp Cooling Sea Water Pump(D) Firm To Provide Additional New Spare Couplings. , 1004Eqpt/System: Srp Cooling Sea Water Pump(E) Firm To Supply New Spares And Fitment Of All Foundation Nut And Bolts ( M16, Material -Ss) To Be Carried Out , 1004Eqpt/System: Srp Cooling Sea Water Pump(F) Firm To Supply New Spares And Fitment Of Suction Pressure Gauges To Be Carried Out. Suction Gauge Range -1 To 1.5 Bar. The Gauges Should Be Glycerine Filled. , 1004Eqpt/System: Srp Cooling Sea Water Pump(G) Firm To Supply New Spares And Fitment Of Discharge Pressure Gauges To Be Carried Out. Discharge Gauge Range 0 To 10 Bar. The Gauges Should Be Glycerine Filled. , 1003Eqpt/System: Srp Cooling Sea Water Pump(H) Firm To Supply New Spares And Fitment Of Instrumentation Gauges Pipes (Rmt- 02 Mts) With Suitable End Fittings To Be Carried Out , 1003Eqpt/System: Srp Cooling Sea Water Pump(J) Firm To Supply New Spares And Fitment Of Isolating Cock To Be Carried Out. Mat: Cuni, Dia:1/4 Inch. To Be Carried Out , 1004Eqpt/System: Srp Cooling Sea Water Pump(K) Firm To Supply New Spares And Fitment Of Durets-02 No. (Dia-60Mm) Length - 30Cm To Be Carried Out , 1004Eqpt/System: Srp Cooling Sea Water Pump(M) Casing To Be Chemically Cleaned And Checked For Pitting. , Followed By Surface Finishing , 1005 Eqpt/System: Engine Driven Fire Pumps Make: Be Pumps, Model- M2022kk/Rr-Dgs2-316 Type: Two Stage,Centrifugal Pump, Cap: 300Cum/Hr, , 1005 Eqpt/System: Engine Driven Fire Pumps (A) Overhauling Of Pump To Be Carried Out. Pump To Be Dismantle Completely And All Parts To Be Inspected. Damaged & Defective Parts To Be Replaced With New Spares. Post Overhauling, Pump To Be Proved For Satisfactory Operation. Vibration Analysis Of Pump To Be Carried Out And Same To Be Recorded. Post Successful Trials Of Pump, Trial Report To Be Rendered. , 1005 Eqpt/System: Engine Driven Fire Pumps (B) Casing To Be Chemically Cleaned And Checked For Pitting. , Followed By Surface Finishing , 1005 Eqpt/System: Engine Driven Fire Pumps (C) Firm To Supply New Spares And Fitment Of Suction Pressure Gauges To Be Carried. Suction Gauge Range -1 To 1.5 Bar . The Gauges Should Be Glycerine Filled. , 1005 Eqpt/System: Engine Driven Fire Pumps (D) Firm To Supply New Spares And Fitment Of Discharge Pressure Gauges To Be Carried. Discharge Gauge Range 0 To 10 Bar. The Gauges Should Be Glycerine Filled. , 1005 Eqpt/System: Engine Driven Fire Pumps (E) Firm To Supply New Spares And Fitment Of All Gasket And O Rings To Be Carried Out , 1005 Eqpt/System: Engine Driven Fire Pumps (F) Firm To Supply New Spares And Fitment Of Instrumentation Gauges Pipes (Rmt- 02 Mts) With Suitable End Fittings To Be Carried Out , 1005 Eqpt/System: Engine Driven Fire Pumps (G) Firm To Supply New Spares And Fitment Of Isolating Cock To Be Carried Out , 1005 Eqpt/System: Engine Driven Fire Pumps (H) Firm To Supply New Spares And Fitment Of End Bearings To Be Carried Out , 1005 Eqpt/System: Engine Driven Fire Pumps (J) Firm To Supply New Spares And Fitment Of Packings To Be Carried Out , 1005 Eqpt/System: Engine Driven Fire Pumps (K) Firm To Supply New Spares And Fitment Of Purging Cocks With Funnel To Be Carried Out , 1005 Eqpt/System: Engine Driven Fire Pumps (M) Cleaning And Painting Of Pump With Bed To Be Carried Out , 1005 Eqpt/System: Engine Driven Fire Pumps (N) Prove The Pump For Satisfactory Performance , 1006Engine Driven Fire Pump Power Take Off Assembly Model: Sl 214 P 101, , 1006Engine Driven Fire Pump Power Take Off Assembly(A) Check And Inspect The Clutch Mechanism. , 1006Engine Driven Fire Pump Power Take Off Assembly(B) Firm To Supply New Coupling Along With Rubber Bellow Bushes. , 1006Engine Driven Fire Pump Power Take Off Assembly(C) Overhauling Of Clutch-In & Declutch Mechanism To Be Carried Out. , 1006Engine Driven Fire Pump Power Take Off Assembly(D) Carry Out Alignment Of Pump With Power Take Off Assembly & Engine. , 1006Engine Driven Fire Pump Power Take Off Assembly(E) Pump To Be Proved For Satisfactory Performance Post Work Completion. , 1007Eqpt : Dd Compressor Engine, Make : Greaves , Model - 1080, Sl No- A4a24423,Power-6.1Hp,Rpm-3000, Type: Single Cylinder, , 1007Eqpt : Dd Compressor Engine(A) Sump To Be Drained, Flushed Through And Refill New Oil. (Oil Grade 15 W 40) , 1007Eqpt : Dd Compressor Engine(B) Valve Tappet Setting To Be Carried Out. , 1007Eqpt : Dd Compressor Engine(C ) Firm To Supply Oil Filter Element And Fitment Of Oil Filter Element To Be Carried Out. , 1007Eqpt : Dd Compressor Engine(D) Remove/ Cleaning Of Cylinder Head And De Carbonise Piston And Cylinder Heads. , 1007Eqpt : Dd Compressor Engine(E )Chemical Cleaning Of Exhaust Pipe And Silencers To Be Carried Out. , 1007Eqpt : Dd Compressor Engine(F) Firm To Supply New Spares And Fitment Of Fuel Filter Element To Be Carried Out. , 1007Eqpt : Dd Compressor Engine(G) Firm To Supply New Spares And Fitment Of Air Intake Filter To Be Carried Out. , 1007Eqpt : Dd Compressor Engine(H) Chemical Cleaning And Firm To Undertake Calibration/Serviceability Checks Of Fuel Injectors To Be Carried Out. Firm To Undertake Calibration/Serviceability Checks Reports To Be Rendered , 1007Eqpt : Dd Compressor Engine(J) Firm To Supply New Spares And Fitment Of Flexible Pipes ,Size - 1/4 Inch To Be Carried Out , 1007Eqpt : Dd Compressor Engine(K) Firm To Supply New Spares And Fitment Of Oring And Gasket To Be Carried Out. , 1007Eqpt : Dd Compressor Engine(M) Provide New Self Starting Arrangement For Engine Including Belt And Operating System .Prove Smooth Starting And Stopping Of Engine. , 1007Eqpt : Dd Compressor Engine(N) Bleed Off Air From Fuel System And Fuel Filter To Be Carried Out. , 1007Eqpt : Dd Compressor Engine(P) Prove Engine Along With Compressor For Satisfactory Performance. , 1008Eqpt: Air Compressor , Makel: Elgi, Model- Hp -05- 300, Cap-12.4M3/Hr@30Kg/Cm2. Type: 2 Stage Reciprocating Type, Cap: 200Lpm, , 1008Eqpt: Air Compressor(A) Firm To Supply And Fitment Of V-Belts To Be Carried Out. , 1008Eqpt: Air Compressor(B) Firm To Supply And Fitment Of Gasket To Be Carried Out. , 1008Eqpt: Air Compressor(C ) Firm To Supply And Fitment Of Piston Rigs To Be Carried Out. , 1008Eqpt: Air Compressor(D) Firm To Supply Crankshaft Assembly Along With Connecting Rod And Same To Be Replaced. , 1008Eqpt: Air Compressor(E ) Firm To Supply New Spares And Fitment Of Pressure Switch To Be Carried Out. , 1008Eqpt: Air Compressor(F) Firm To Supply New Spares And Fitment Of Pressure Relief Valve To Be Carried Out. , 1008Eqpt: Air Compressor(G) Firm To Supply New Safety Valve & Same To Replace. Prove For Satisfactory Performance. , 1008Eqpt: Air Compressor(H) Firm To Supply New Spares And Fitment Of Pressure Gauge (0 - 50 Bar) To Be Carried Out , 1008Eqpt: Air Compressor(J) Firm To Supply Lub Oil , Lub Oil :- Elgi Reciprocating Air Compressor Lube Oil , 1008Eqpt: Air Compressor(K) Foundation Frame For Compressor To Be Renewed. Fabrication Of New Channels To Be Done ( Thickness 6Mm, Length 4Mtrs). Suitable Primer And Paint To Be Applied. , 1008Eqpt: Air Compressor(M) Air Compressor To Be Cleaned Completely. Post Cleaning, Panting Of Whole Body To Be Carried Out. Firm To Supply And Renew Lub Oil Sight Glass , 1008Eqpt: Air Compressor(N) Overhauling Of Compressors To Be Carried Out And Prove The Air Compressor For Satisfactory Operational. , 1009Eqpt: Fuel Oil Purifier , Make: Alfa Level , 1009Eqpt: Fuel Oil Purifier , Makel: Alfa Level (A) Over Hauling Of Fuel Oil Purifier To Be Done. Job Includes Cleaning Of Bowl And Firm To Be Renew Gaskets, Bearings And Seals. Firm To Replace All Water Hoses With New , 1009Eqpt: Fuel Oil Purifier , Makel: Alfa Level(B) Over Hauling Of Pump And Firm To Be Renew Seals And Bearings. , 1009Eqpt: Fuel Oil Purifier , Makel: Alfa Level(C ) Overhauling Of Water Block Assembly To Be Carried Out. , 1009Eqpt: Fuel Oil Purifier , Makel: Alfa Level(D) Firm To Be Replace Pressure Switch With New One. , 1009Eqpt: Fuel Oil Purifier , Makel: Alfa Level(E) Prove The System For Satisfactory Performance. , 1010Eqpt/System: Strainers Following System Strainers To Be Manufactured As Per S Le, Strainer, 3 Mm Hole Dia, Spaced 5 Mm Apart, With Zig Zag Position Of Holes , 1010Eqpt/System: Strainers (A) Manufacturing Of Main Supply Manifold Strainers Dia 300Mm, Material:- Brass, Thickness- 3 Mm To Be Carried Out , 1010Eqpt/System: Strainers (B) Manufacturing Of Main Engine Cooling Water Strainers Dia 80Mm, Mat: Brass, Thick- 3 Mm To Be Carried Out , 1010Eqpt/System: Strainers (C) Manufacturing Of E/D Sea Water Pump Main Suction Strainers Dia 200Mm,Material:- Brass, Thickness- 3 Mm To Be Carried Out , 1010Eqpt/System: Strainers (D) Manufacturing Of Foam System Inline Strainer Dia 30 Mm, Material:- Brass, Thickness- 3 Mm To Be Carried Out , 1010Eqpt/System: Strainers (E) Manufacturing Of Fresh Water Pump Suction Foot Valve 32 Mm, Material:- Brass, Thickness- 2 Mm To Be Carried Out , 1010Eqpt/System: Strainers (F) Manufacturing Of Srp Lub Oil Cooler Sea Water System Inlet Side Strainer Body To Be Replaced, Including Strainer, Body- Material -Ss, Strainer Material -Brass, Body Dimension 12 Cm Dia, Ht- 16 Cm, Strainer Dimension - Dia 10 Cm And Ht 15 Cm To Be Carried Out , 1010Eqpt/System: Strainers (G) Firm To Replace With New Purging Cocks For Sea Water Strainers. Job Includes Removal Of Damaged Purging Cock And New Purging Cocks To Be Fitted On Top Cover Of Sea Chest Strainer. Firm To Provide Suitable Drain Pipe From Purging Cock To Engine Room Bilges. Prove For Satisfactory Operation. , 1010Eqpt/System: Strainers (H) Manufacturing Of 80 Mm Line Suction Strainer To Be Carried Out , 1010Eqpt/System: Strainers (J) Manufacturing Of 100Mm Line Suction Strainer To Be Carried Out , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Following System Pipes To Be Removed, Chemically Cleaned , Pressure Tested ( 1.5 Times Of Working Pressure ). Firm To Undertake Necessary Repair Of Defective System Pipe Line Post Fitment Of Pipelines, Firm To Paint All System Pipe Line As Per Colour Code. , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Sea Water System(A) Dia.- 200Mm Sea Water System Pipe Mat: Cuni, , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Sea Water System(B) Dia.-80Mm Pipe Sea Water System Pipe Mat: Cuni , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Sea Water System(C) Dia.-60Mm Sea Water System Pipe Mat: Gi , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Sea Water System(D) Dia.-40Mm Sea Water System Pipe Mat: Cuni , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Sea Water System(D) Dia.-100Mm Sea Water System Pipe Mat: Cuni , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Bilge System(E) Dia.- 80Mm Pipe Mat: Cuni, , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Bilge System(F) Dia.-60Mm Pipe Mat: Cuni , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Bilge System(G) Dia.-50Mm Pipe Mat: Gi , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Fuel System(H) Dia.- 50Mm Pipe Mat: Cuni, , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Fuel System(J) Dia.-20Mm Pipe Mat: Cuni , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Fresh Water System(K) Dia-32 Mm Pipe Mat: Cuni , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Exhaust Line(M) 150 Mm Mat. Mild Steel , 1011Eqpt/System: System Pipes For Chemical Cleaning & Pressure Testing Exhaust Line(N) 100 Mm Mat. Mild Steel , 1011(A)System Pipe Linesfirm To Undertake Manufacturing Of New Pipes As Per S Le. Job Includes Templating, Bending, Fabrication, Cutting, Edge Preparation, Pressure Testing As Per Procedure, Fitment Of Suitable Flanges. System , 1011(A)System Pipe Linesmanufacturing Of New Pipes As Per S Le. Job Includes Templating, Bending, Fabrication, Cutting, Edge Preparation, Pressure Testing As Per Procedure, Fitment Of Suitable Flanges. (I)System Pipes Lines (Mild Steel) Up To 25 Mm , 1011(A)System Pipe Linesmanufacturing Of New Pipes As Per S Le. Job Includes Templating, Bending, Fabrication, Cutting, Edge Preparation, Pressure Testing As Per Procedure, Fitment Of Suitable Flanges. (Ii) System Pipes Lines (Mild Steel) 26 Mm To 50 Mm , 1011(A)System Pipe Lines Fabrication/Manufacturing Of New Pipes As Per S Le. Job Includes Templating, Bending, Fabrication, Cutting, Edge Preparation, Pressure Testing As Per Procedure, Fitment Of Suitable Flanges. (Iii) System Pipes Lines (Mild Steel) 51 Mm To 75 Mm , 1011(A)System Pipe Lines Manufacturing Of New Pipes As Per S Le. Job Includes Templating, Bending, Fabrication, Cutting, Edge Preparation, Pressure Testing As Per Procedure, Fitment Of Suitable Flanges. (Iv) System Pipes Lines (Mild Steel) 76 Mm To 100 Mm , 1011(A)System Pipe Lines Fabrication/Manufacturing Of New Pipes As Per S Le. Job Includes Templating, Bending, Fabrication, Cutting, Edge Preparation, Pressure Testing As Per Procedure, Fitment Of Suitable Flanges. (V) System Pipes Lines (Copper/Cuero Nickel/Cu Ni/Ss 316 Ti ) Up To 25 Mm , 1011(A)System Pipe Lines Fabrication/Manufacturing Of New Pipes As Per S Le. Job Includes Templating, Bending, Fabrication, Cutting, Edge Preparation, Pressure Testing As Per Procedure, Fitment Of Suitable Flanges. (Vi) System Pipes Lines (Copper/Cupro Nickel/Cu Ni/Ss 316 Ti ) 26 Mm To 50 Mm , 1011(A)System Pipe Lines Fabrication/Manufacturing Of New Pipes As Per S Le. Job Includes Templating, Bending, Fabrication, Cutting, Edge Preparation, Pressure Testing As Per Procedure, Fitment Of Suitable Flanges. (Vii) System Pipes Lines (Copper/Cupro Nickel/Cu Ni/Ss 316 Ti ) 51 Mm To 75 Mm , 1011(A)System Pipe Lines (Viii) Supply Of New Machined/Manufactured End Fittings (Unions Set, Check Nuts,Nipples ) As Per Material Standards. Material: Aluminium Bronze Dia 6Mm To 10 Mm , 1011(A)System Pipe Lines (Ix) Supply Of New Machined/Manufactured End Fittings (Unions Set, Check Nuts,Nipples ) As Per Material Standards. Material: Aluminium Bronze Dia 11 Mm To 20 Mm , 1011(A)System Pipe Lines (X) Supply Of New Machined/Manufactured End Fittings (Unions Set, Check Nuts,Nipples ) As Per Material Standards. Material: Mild Steel Dia Up To 25 Mm , 1011(A)System Pipe Lines (Xi) Flanges- Firm To Supply (Machined/Manufactured) Flanges As Per S Le. Material: Mild Steel , 1011(A)System Pipe Lines (Xii) Flanges- Firm To Supply (Machined/Manufactured) Flanges As Per S Le. Material: (Copper/Cupro Nickel/Cu Ni/Ss 316 Ti ) , 1011(A)System Pipe Lines (Xiii) Old Rubber Rings Inside The Cl S Are Damaged. Firm To Supply And Replace The Old Rubber Rings With Rings. New Rubber Rings Of Various Sizes As Follows (40Mm,65Mm,80Mm,100Mm,125Mm,150Mm,160Mm) (10 Nos Each) , 1012 Eqpt/System: Foam System/ Foam Guns , 1012 Eqpt/System: Foam System/ Foam Guns(A) Overhauling Of Foam Guns To Be Carried Out. Prove For Satisfactory Operation (Fog And Jet Operation) Post Completion Foam Gun To Be Painted. (Red Colour). , 1012 Eqpt/System: Foam System/ Foam Guns(B) Firm To Supply New Spares And Fitment Of All Perished Rubber Fittings (80 Mm Dia, 5 Mm Thick) To Be Carried Out. , 1012 Eqpt/System: Foam System/ Foam Guns(C) Overhauling Of Foam Gun Drive Gearboxes To Be Carried Out And Make Free For Movement , 1012 Eqpt/System: Foam System/ Foam Guns(D) Overhauling Of Foam Tank Isolating Valves To Be Carried Out ( 50Mm Sdnr (Gm)) , 1012 Eqpt/System: Foam System/ Foam Guns(E) Firm To Supply New Spares And Fitment Of 50Mm Sdnr (Mat: Gm) To Be Carried Out , 1012 Eqpt/System: Foam System/ Foam Guns(F) Firm To Supply New Spares And Fitment Of 50Mm Sdnr (Gm) To Be Carried Out , 1012 Eqpt/System: Foam System/ Foam Guns(G) Firm To Supply New Spares And Fitment Of Couplings Shaft Locking Pins (Dia 05 Mm,10 Mm Long) To Be Carried Out. , 1012 Eqpt/System: Foam System/ Foam Guns(H) Overhauling Of Three Way Flushing Valve To Be Carried Out (50Mm). , 1012 Eqpt/System: Foam System/ Foam Guns(J) Overhauling Of Foam System Proportionate To Be Carried Out , 1013Eqpt/System: Co2 Extinguishing System, Make: New Fire Engineers Pvt Limited , 1013Eqpt/System: Co2 Extinguishing System(A) Co2 Cylinders To Be Weighed And Recharged With Co2 . , 1013Eqpt/System: Co2 Extinguishing System(B) Overhauling Of Non Return Valves On Cylinder Heads To Be Carried Out , 1013Eqpt/System: Co2 Extinguishing System(C) All Co2 Discharge Nozzles To Be Opened, Checked For Chockages, Cleaned And Fitted Back. , 1013Eqpt/System: Co2 Extinguishing System(D) Overhauling Of Shuttle Valve To Be Carried Out , 1013Eqpt/System: Co2 Extinguishing System(E) Overhauling Of Relief Valve Assembly To Be Carried Out , 1013Eqpt/System: Co2 Extinguishing System(F) Overhauling Of Pressure Operated Switch To Be Carried Out , 1013Eqpt/System: Co2 Extinguishing System(G) Complete Drenching System Piping To Be Blown Through Using Hp Air To Prove System Free Of Blockages , 1013Eqpt/System: Co2 Extinguishing System(H) All Co2 Cylinders (45 Kg Capacity) And System Pipes To Be Painted As Per Coding Post Work Completion. , 1013Eqpt/System: Co2 Extinguishing System(J) All System Pipes (Dia-20 Mm) To Be Painted As Per Coding Post Work Completion. , 1014Eqpt/System: Marine Sanitation Device (Stp), Make/Model: Exceltec Omnipure 7Me, Cap: 1200 Gal/Day , 1014Eqpt/System: Marine Sanitation Device (Stp)(A) Chemical Cleaning Of Surge Tanks To Be Carried Out , 1014Eqpt/System: Marine Sanitation Device (Stp)(B) Firm To Supply New Pump. Fitment Of Macerators Pump To Be Carried Out . Baldor Wash Down 1Hp , 1014Eqpt/System: Marine Sanitation Device (Stp)(C) Firm To Supply New Pump. Fitment Of Overboard Pump To Be Carried Out. Baldor Dirty Duty 1Hp , 1014Eqpt/System: Marine Sanitation Device (Stp)(D) Firm To Supply New Valve And Fitment Of12mm Needle Valves To Be Carried Out , 1014Eqpt/System: Marine Sanitation Device (Stp)(E) Venturi To Be Dismantled Cleaned Internally And Boxed Back , 1014Eqpt/System: Marine Sanitation Device (Stp)(F) Inline Strainer To Be Dismantled And Strainer Element To Be Renewed , 1014Eqpt/System: Marine Sanitation Device (Stp)(G) Firm To Supply New Air Filter And Fitment Of Air Filter Element To Be Carried Out. , 1014Eqpt/System: Marine Sanitation Device (Stp)(H) Air Regulator To Be Dismantled Cleaned And Boxed Up And Set Pressure To Be Set At Range 1-150 Psi , 1014Eqpt/System: Marine Sanitation Device (Stp)(J) Electro Catalytic Cell To Be Dismantled And Acid Cleaned Using 6%-10% Solution Of Water And Muriatic Acid. , 1014Eqpt/System: Marine Sanitation Device (Stp)(K) Complete Assembly And System Pipe To Be Painted Post Work Completion As Per Colour Code. , 1015 Miscellaneous (A) Dg Cooling Water Pump Suction & Discharge Pipe Line To Be Renewed.( Pipe Dia 40 Mm, Mat: Cuni, 10 Mtrs) New Valves (Qty-02) To Be Fitted In Cooling Water Line To Regulate The Flow. , 1015 Miscellaneous (B) Foundation Frame ( Size 1.5 Mts* 0.5 Mtrs) To Be Replace With Newed. Primer To Be Applied Post Fitment Of Foundation Frame. Set Of Nut & Bolt ( Material : Ss ) To Be Provided By Firm , 1015 Miscellaneous C) Main Engine & Da Engine Complete Structure To Be Cleaned. Spray Down The Entire Engine Block With Degreaser. Scrub Down The Deposited Oil,Grease,Rust And Dirt. After Complete Cleaning Apply Suitable Anti Rust Coating To Engine Body. Cautions To Be Taken While Cleaning Of Engine. Sensors And Controls Not Be Damaged. , 1015 Miscellaneous D) Shafting System:- Intermediate/Propeller Shaft To Be Cleaned. Spray Down The Entire Shaft (From Main Engine To Propulsion System) With Degreaser. Scrub Down The Deposited Oil,Grease,Rust And Dirt. Grease To Be Applied To Shaft For Rust Prevention. , 1015 Miscellaneous E) Main Engine Exhaust Trunking To Be Cleaned Internally. Compensator To Be Replaced With New. , 1015 Miscellaneous F) Da Exhaust Trunking To Be Cleaned Internally. Compensator To Be Replaced With New. , 1015 Miscellaneous G) Da Exhaust Lagging To Be Renewed , 1015 Miscellaneous H) Main Engine Exhaust Lagging To Be Renewed , 1015 Miscellaneous J) Rack At Spare Room Perished , New Racks To Be Fabricated In Spare/ Store Room As Per S Le ( Rack Dimensions 240*120*60 Cms) . For Sufficient Strength Angle Bar 5 Mm To Be Provided For Racks To Store Heavy Spare Parts. Three Side To Be Covered By Metal Sheet And Five Partitions With Support Of Angle Bars ( Minimum 02 Nos) Be Provided In Each Rack. Primer And Paint To Be Applied To Racks. Dimensions: Metal Sheet 2 Mm, Angle Bar 5 Mm, , 1015 Miscellaneous K) Firm To Supply Strainers For Sea Water System. Strainers To Be Fabricated As Per S Le (Shape:Cylinderical/Box), Mat : Brass ( Thickness Up To 4Mm, Height Up To 20 Mm) , 1015 Miscellaneous M) Firm To Supply Strainers For Sea Water System. Strainers To Be Fabricated As Per S Le (Shape:Cylinderical), Mat : Brass ( Thickness Up To 4Mm, Diameter Up To 10 Inch, Height Up To 18 Inch.) , 1015 Miscellaneous N) Firm To Provide Sacrificial Zinc Anodes With Brass Plug Fitting. Size: ( 1 Inch To 2 Inch) Anodes To Be Manufactured As Per S Le , 1015 Miscellaneous P) Zinc Plugs For Main Engine Along With Adapters To Be Replaced. Location Of Zinc Plug Is Elbow Of The Auxiliary Water Pump And Elbow Of The After Cooler. (Zinc Plugs Be Provided By Firm) , 1015 Miscellaneous Q) Fifi System Inlet Sea Water Line Pressure Measuring Point And Pressure Gauge To Be Provided. (Range 0-10Bar) , 1015 Miscellaneous R) Fifi System Outlet Sea Water Line Pressure Measuring Point And Pressure Gauges To Be Provided. (Range 0-10Bar) , 1015 Miscellaneous S) Both Main Engines Sea Water Suction Line Pressure Measuring Points And Pressure Gauge To Be Provided , 1015 Miscellaneous T) Ru Tanks Level Sight Glass Tubes To Be Renewed. Quick Closing Valve And Drain Valves For Sight Glass To Be Renewed. , 1015 Miscellaneous U) Portable Pump Along With Motor ( Capacity: 1-2 Hp) To Be Overhauled. And Prove For Satisfactory Operation. Pump End Flange Connections To Be Renewed , 1015 Miscellaneous V) Sea Water Pump Housing Is Perished . Reconditioning Of Sea Water Pump Housing To Be Carried Out. , 1015 Miscellaneous W) Sea Water Pump Shaft Is Damaged . Reconditioning Of Sea Water Pump Shaft To Be Carried Out. , 1015 Miscellaneous X) Sea Water Pump Impeller Is Damaged . Reconditioning Of Sea Water Pump Impeller To Be Carried Out. , 1015 Miscellaneous Y) Reconditioning Of Pump Damaged Parts Including Shaft & Impeller, Pump Housing To Be Done. , 1015 Miscellaneous Z) Firm To Supply Victaulic Cl S/Coupling With Suitable Gaskets Of Various Sizes ( Size: 2 To 4 ) As Per S Le. , 1015 Miscellaneous Aa) Firm To Supply Victaulic Type Flanges As Per S Le (Dia 80~100 Mm) , 1015 Miscellaneous Ab) Firm To Supply New Valve (Gear Operated Butterfly Valve: Dia 80~100 Mm) , 1015 Miscellaneous Ac) Firm To Supply New Wet And Dry Dust Vacuum Cleaner (Industrial Type) Make Dewalt, Power- 1400 Watts,Capacity-36 Ltrs. , 1015 Miscellaneous (Ad) Firm To Supply And Fitment Of Name Tallies For All System Valves And Filling Lines . , 1015 Miscellaneous (Ae) Main Engine Air Starting Line Pressure Reducing Valve (Prv):- Firm To Supply New Prv And For Both Main Engine To Be Replaced . Prove For Satisfactory Trials., Range-30Bar To 10 Bar, Dia- 40Mm. , 1015 Miscellaneous (Af) Firm To Supply And Fitment Of Moisture Separators To Be Done. For Starting Air Line The Moisture Separator To Be Replace With Newed Before Air Starter. The Separator To Be Provided By Firm. Details Of Moisture Separator Are As Follows:- Make: Hydint/Ceson , Design Press/Working Press : 16 Bar, Test Press: 24 Bar, Size 1 1/2, Element : S/ Steel , Line Size: 40 Mm.. Fitment Of Moisture Separator To Be Carried Out And Prove For Satisfactory Trials. Job Includes Fabrication/Renewal Of System Pipe Line, Joints, Connection , Flanges Etc. Firm To Quote For Required Spares And Material To Undertake Job , 1015 Miscellaneous (Ag) Firm To Supply And Fitment Of Air Line Pressure Hoses, Dia -40Mm, Length-2 Mtrs , 1015 Miscellaneous (Ah) Firm To Supply And Fitment Of Starting Air Line Lubricators, Pipe Line Dia- 40Mm , 1015 Miscellaneous (Aj) Ac Outdoor Unit Deteriorated View Exposure & Weather Conditions. Suitable Protection Cover/Box To Be Fabricated For Ac Outdoor Units. Ac Outdoor Unit Supporting Stand To Be Renewed. , 1015 Miscellaneous (Ah) Firm To Supply And Fitment Of Starting Air Line Lubricators, Pipe Line Dia- 40Mm , 1015 Miscellaneous (Aj) Firm To Supply And Fitment Of Starting Air Line Lubricators, Pipe Line Dia- 40Mm , 1015 Miscellaneous (Ah) Firm To Supply And Fitment Of Starting Air Line Lubricators, Pipe Line Dia- 40Mm , 1015 Miscellaneous (Ah) Firm To Supply And Fitment Of Starting Air Line Lubricators, Pipe Line Dia- 40Mm , 1016 Eqpt: Submersible Pump, Make : Modi , 1016 Eqpt: Submersible Pump, Make : Modi, Model- S541, Capacity- 40 Tph(A) Submersible Pump To Be Overhaul And Discharge Side Canvas Hose To Be Renewed (Dia- 4 Inch, Length- 50 Meter). Pump To Be Proved For Satisfactory Performance Post Work Completion. Capacity- 40 Tph , 1016 Eqpt: Submersible Pump, Make : Modi, Capacity- 20 Tph(B) Submersible Pump To Be Overhaul And Discharge Side Canvas Hose To Be Renewed (Dia- 4 Inch, Length- 50 Meter). Pump To Be Proved For Satisfactory Performance Post Work Completion. Capacity- 20 Tph , 1017Eqpt/System:Srp System, Make : Rolls Royce, Type- Aquamaster Us1201/2500 , Manufacturing No-61805(Stbd),61804(Port) . Routines/ Job To Be Undertaken By Oem/Oem Authorised Rep Only. Firm To Supply/Use Spares/Consumables Indicated/Approved By Oem/Oem Authorised Rep , 1017Eqpt/System:Srp System, Make : Rolls Royce(A) Firm To Supply New Spares And Fitment Of Clutch Oil And Boost Oil Pressure Gauge (0-40Bar) To Be Carried Out. , 1017Eqpt/System:Srp System, Make : Rolls Royce(B) Sluggish Operation Of Aqm Lever Throttle Observed During Operation. New Cable For Aqm Lever Throttle To Be Supplied And Be Replaced . Prove For Satisfactory Performance. , 1017Eqpt/System:Srp System, Make : Rolls Royce(C) Cleaning And Flushing Of Gravity Tanks, Steering Oil Tanks And Gravity Oil Pipe Line For Srp Units To Be Carried Out. Firm To Inspect Upper Units And Lower Gears, Adjust If Required. Oil For Flushing Will Be Provided By Firm , 1017Eqpt/System:Srp System, Make : Rolls Royce(D) Chemical Cleaning And Pressure Testing Of Lub Oil Coolers To Be Carried Out. , 1017Eqpt/System:Srp System, Make : Rolls Royce(E) Coolers To Be Boxed Up With New Zinc Anodes. Anodes To Be Manufactured As Per S Le. , 1017Eqpt/System:Srp System, Make : Rolls Royce(F) Renew The Seals Of The Propeller Shaft, Seals Of The Steering Tube And Of The Input Shaft. Firm To Quote And Supply All Spares And Consumables To Undertake Job Including Propeller Shaft Seal, Radial Seal, Shaft Seals,O-Rings,Sealing Rings, Steel Wire,Sleeve,Set Screw . , 1017Eqpt/System:Srp System, Make : Rolls Royce(G) Accumulator Assembly To Be Charged To Pre-Pressure. Prove For Satisfactory Operation. , 1017Eqpt/System:Srp System, Make : Rolls Royce(H) Lub Oil In Sump To Be Completely Drained And New Oil Charged Sp 150. Oil To Be Provided By The Firm. , 1017Eqpt/System:Srp System, Make : Rolls Royce(J) Hydraulic Oil To Be Drained And New Oil Charged Servo System 46. Oil To Be Provided By The Firm. , 1017Eqpt/System:Srp System, Make : Rolls Royce(K) Firm To Supply New Spares And Fitment Of Hydraulic Oil Filter Elements To Be Carried Out. Firm To Quote For Filter Cartridges And Seal Kit. Each Set Contains Following Filter Cartridge And Seal Kit:- Filter Cartridge Rrm000026236, Filter Cartridge Rrm000026233, Seal Kit Rrm000026248/ Ref Patt No 6659858. , 1017Eqpt/System:Srp System, Make : Rolls Royce(M) Firm To Supply New Spares And Fitment Of Lub Oil Filter Elements To Be Carried Out. / Ref Patt No 6659861. , 1017Eqpt/System:Srp System, Make : Rolls Royce(N)Firm To Supply New Spares And Fitment Of All Drive Belts To Be Carried Out. Firm To Supply Pump Drive Belts- V-Belt Rrm000025984 , 1017Eqpt/System:Srp System, Make : Rolls Royce(P) Renew/Replace The Zinc Anodes Of Aqua Master Kort Nozzle. Firm To Supply Following Zinc/Sacrificial Anodes:- (I) Zinc Anode (5251216L25-A Mounting Of Bottom Well, Qty-12 Pcs) (Ii) Sacrificial Anode (5251096000 A Rope Guard, Qty-12 Pcs) (Iii) Sacrificial Anode (5150736 Nozzle, Qty -08 Pcs) , 1017Eqpt/System:Srp System, Make : Rolls Royce(Q) Paint Under Water Parts According To The Surface Treatment Instructions. , 1017Eqpt/System:Srp System, Make : Rolls Royce(R) Carry Out Maintenance On All Intermediate Shaft Bearing. Remove The Used Grease And Fresh Standard Grease To Be Packed. , 1017Eqpt/System:Srp System, Make : Rolls Royce(S) Greasing Of Universal Shaft Joints To Be Carried Out , 1017Eqpt/System:Srp System, Make : Rolls Royce(T) Check The Condition Of The Gears Through The Inspection Hatches. Intermediate Shaft Bearings To Be Dismantled And Old Grease Removed. Greasing Of Bearing To Be Carried Out Thereafter Grease Type Ep-2 , 1017Eqpt/System:Srp System, Make : Rolls Royce(U) Firm To Supply New Spares And Fitment Of All Flexible Hoses/ Durettes To Be Replaced With New (To Be Supplied As Per S Le.) , 1017Eqpt/System:Srp System, Make : Rolls Royce(V) Firm To Supply New Spares And Fitment Of Breathing Filter (Rrm000026221) ,Breather Filler Cap(Rrm000026220) , 1017Eqpt/System:Srp System, Make : Rolls Royce(W) Firm To Supply New Spares And Fitment Of Accumulator Solenoid Valves To Be Carried Out , 1017Eqpt/System:Srp System, Make : Rolls Royce(X) Srp System Equipments/Pipe Lines Etc To Be Clean Completely And Painted Post Work Completion As Per Colour Code. Firm To Supply Hydraulic Sealing Material, Lubrication Grease,Marker,Corrosion Inhibitor, Sealing Glue For Undertaking Routines Of Srp System. , 1017 (A) Eqpt/System:Srp System, Make : Rolls Royce . Firm To Supply/Use Spares/Consumables Indicated/Approved By Oem/Oem Authorised Rep Following Instrumentation Gauges And Thermometers To Be Calibrated And Certificate To Be Rendered. Defective Items To Be Replaced With New. , 1017Eqpt/System:Srp System, Make : Rolls Royce(A) Firm To Undertake Firm To Undertake Calibration/Serviceability Checks Of All Instrumentation Gauges And Thermometers Fitted For Srp System And Firm To Undertake Calibration/Serviceability Checks Certificate To Be Rendered. Defective Items To Be Replaced With New. , 1017Eqpt/System:Srp System, Make : Rolls Royce(B) Firm To Supply New Clutch Oil Pressure Gauge (0-40Bar) And Fitment Of Pressure Gauge To Be Carried Out. Prove For Satisfactory Operation. , 1017Eqpt/System:Srp System, Make : Rolls Royce(C) Firm To Supply New Lub Oil Pressure Gauge (0-6Bar) And Fitment Of Pressure Gauge To Be Carried Out. Prove For Satisfactory Operation. , 1017Eqpt/System:Srp System, Make : Rolls Royce(D) Firm To Supply New Thermometers ( As S Le) And Fitment Of Thermometers For Local Reading To Be Carried Out , 1017Eqpt/System:Srp System, Make : Rolls Royce(E) Valves For Oil Pressure Adjustment Of Srp System To Be Overhauled And Post Overhauling System Oil Pressure To Be Adjusted, Valves To Be Proved For Satisfactory Performance , 1018Eqpt/System: Bilge Platform , 1018Eqpt/System: Bilge Platform(A) Engine Room And Srp Compartment Bilge Platform To Be Removed, Cleaned And Painting Of Plates . Post Completion Of Work All Plates To Be Fitted Back To Facilitate Bilge Area Work. , 1018Eqpt/System: Bilge Platform(B) Renew Bilge Platform Plate Of Srp Compartment . Material- Aluminium Chequered Plates, Thickness- 05 Mm, , 1018Eqpt/System: Bilge Platform(C) Bilge Plates To Be Secured With Bilge Securing Screws, Material - Ss , 1018Eqpt/System: Bilge Platform(D) Bilge Platform Supporting Brackets For Srp Compartment To Be Renewed As Indicated . Mat - Ms , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm. Routines/ Job To Be Undertaken By Oem/Oem Authorised Rep Only. Firm To Supply/Use Spares/Consumables Indicated/Approved By Oem/Oem Authorised Rep , 1019Main Engine, Make: Cummins, (A) Carry Out Visual Inspection Of Mounts. Check Thickness Of D Er At 0,90, 180,270 Degree Positions. Checks To Be Undertaken In Coupled Condition. , 1019Main Engine, Make: Cummins, (B) Record Crankshaft End Clearances With Dial Indicator And Crank Shaft Deflection To Be Checked , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, (C) Calibrate The Pt Pump Based On Performance Of Engine (Reports To Be Rendered) , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, (D) Calibrate The Injectors Based On Performance Of Engine (Reports To Be Rendered) , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, E) Inspect Charge Air Cooler Side And Chemical Cleaning To Be Carried Out. Job Includes Cleaning Of The Internal Passages I.E. Air And Fresh Water/Coolant Side To Be Pressure Tested Up To 2 Kg/Cm2 , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm,F) Cleaning Of Injector Screen, Fuel Pump Magnetic Screen Filter And Magnetic Screen Filter To Be Carried Out , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, G) Cleaning Of Turbocharger Compressor Wheel And Diffuser To Be Carried Out , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, H) Chemical Cleaning Of Heat Exchangers To Be Carried Out . Heat Exchangers To Be Prove For Satisfactory Performance. , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, J) Cleaning And Inspection Of Vibration D Er For Leak To Be Carried Out , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm,K) Firm To Supply Engine Oil ( Servo Premium/Pride 15W40) , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, M) Firm To Supply And Fitment Of Fuel Fitters (Primary And Secondary) To Be Carried Out , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, N) Firm To Supply Fitment Of Air Filter To Be Carried Out , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm,P) Firm To Supply New Lub Oil Coolers And Fitment Of Lube Oil Coolers To Be Carried Out , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, Q) Firm To Supply And Fitment Of Thermostat To Be Carried Out , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm,R) Firm To Undertake Tappet Clearance For All Unit Of Main Engine And Adjust. Firm To Supply & Fitment Of The Tappet Cover Gaskets To Be Carried Out . , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, S) Drain The Engine Coolant, Flush The Cooling System, And Fill Fresh Coolant , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, T) Overhauling Of Priming Pump To Be Carried Out. Job Includes Renewal Of Three Jaw Couplings, Bearings, Seals And Gaskets And Prove For Satisfactory Performance . Firm To Supply Additional 02 Sets Of Couplings As Per S Le , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, U) Overhauling Of Fresh Water Pump To Be Carried Out Job Includes Renewal Of Bearings, Seals And Gaskets. Pump To Be Proved For Satisfactory Performance , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, V) Firm To Supply & Renewal Of Sea Water Pump (3049157)Including Gear (3008841), Gear Ring (3008840), Lock Washer (S605) & Cap Screw (127512) , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, W) Overhauling Of Sea Water Pump To Be Carried Out. Job Includes Renewal Of Bearings, Seals And Gaskets. Pump To Be Proved For Satisfactory Performance , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, X) Firm To Supply & Renewal Of Fresh Water Pump(Ar3050447) For Both Main Engines. , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, Y) Overhauling Of Air Starter Motor To Be Carried Out. Job Includes Renewal Of Pinion ,Bearings And Seals. Prove Air Starter For Satisfactory Performance , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, Z) Firm To Supply And Renew Air Solenoid Valve For Main Engine Air Starter , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, Aa) Firm To Supply Main Engine Air Starter Motor (3026797). , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, Ab) Firm To Supply Renewal Of Expansion Tank And Cap Filler. , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, Ac) Firm To Inspect/Check For Loose/Broken Support Bracket Bolts, Clearance Between Support Flanges For Thermal Expansion And Misalignment Between Trunking Sections. Exhaust System Pipes To Be Provided With Support Or Load Hanger At Various Places. , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, Ac) Firm To Supply Main Engine Air Starter Motor Pinions(Ss815r-1331),Bolts(Ss800r-394),Washers(Ss800-725),Springs(Ss800l-419). , 1019Main Engine, Make: Cummins, Model: Kta 38-M, Rating / Capacity: 1200Bhp@1800 Rpm, Ad) Post Completion Of All Routines, Run The Engine And Check All Engine Related Parameters And Undertake Load Trials. Prove For Satisfactory Performance. , 1020Eqpt : Diesel Generator, Make: Cummins, Model- Nt495mg Dg Fwd(Port) Running Hrs Since Installation : 15011 Hrs (Till Dec 23) Last Routine Carried Out - 12000Hrly / Nr-20 Dg Aft (Stbd) Running Hrs Since Installation : 16532 Hrs (Till Dec 23) , Last Routine Carried Out - 12000 Hrly / Nr-20 Routines/ Job To Be Undertaken By Oem/Oem Authorised Rep Only. Firm To Supply/Use Spares/Consumables Indicated/Approved By Oem/Oem Authorised Rep , 1020 Eqpt: Diesel Generator (Port & Stbd)Make: Cummins, Model: Nt495mg (A) Carry Out Visual Inspection Of Mounts. Check Condition Of Shock Vibration Mountings (Max. Permissible Deflection In Rubber Metal Bonds Is 20% In Height). , 1020 Eqpt: Diesel Generator (Port & Stbd)Make: Cummins, Model: Nt495mg (B) Firm To Supply And Renew The Mounts As Their Condition Is Deteriorated. , 1020 Eqpt: Diesel Generator (Port & Stbd)Make: Cummins, Model: Nt495mg (C) Firm To Supply Head Gaskets And Replace Dg Cylinder Head Gasket With New. , 1020 Eqpt: Diesel Generator (Port & Stbd)Make: Cummins, Model: Nt495mg (D) Undertake Alignment Checks Between The Generator And Engine And Restore Radial/Axial Initial Alignment To 25% Of The Maximum Limit , 1020 Eqpt: Diesel Generator (Port & Stbd)Make: Cummins, Model: Nt495mg (E) Sump Oil To Be Drained, Sump To Be Cleaned And Fresh Lub Oil To Be Charged Into Sump.( Servo 15 W 40) , 1020 Eqpt: Diesel Generator (Port & Stbd)Make: Cummins, Model: Nt495mg (E1) Firm To Replace All Lub Oil Filters With New. Filters To Be Supplied By Firm , 1020 Diesel Generator,Make-Cummins India Ltd(F) Firm To Replace All Fuel Oil Filters With New. Filters To Be Supplied By Firm , 1020 Diesel Generator,Make-Cummins India Ltd(G) Overhauling Of Turbocharger To Be Carried Out. Job Includes Renewal Of Seals And Bearings Of Turbocharger. Post Overhauling Turbocharger To Be Proved For Satisfactory Performance. , 1020 Diesel Generator,Make-Cummins India Ltd(H) Firm To Supply New Heat Exchanger Patt No. Ar3246882 , 1020 Diesel Generator,Make-Cummins India Ltd(J) Remove Fuel Injection Pump. Clean,Inspect,Calibrate & Repair With New Spare Parts.(New Spares Required For Overhauling To Be Supplied By Firm) , 1020 Diesel Generator,Make-Cummins India Ltd(K) Firm To Replace Fuel Injection Line For Dg Manifold Fuel(4021110) , 1020 Diesel Generator,Make-Cummins India Ltd(M) Firm To Supply Fuel Injection Line For Dg Manifold Fuel(4021110) , 1020 Diesel Generator,Make-Cummins India Ltd(N) Firm To Replace Fuel Drain Line For Dg Manifold Fuel Drain (3875502) , 1020 Diesel Generator,Make-Cummins India Ltd(P) Firm To Supply Fuel Drain Line For Dg Manifold Fuel Drain (3875502) , 1020 Diesel Generator,Make-Cummins India Ltd(Q) Remove Injectors, Clean, Inspect And Firm To Undertake Calibration/Serviceability Checks To Be Carried Out. All O-Rings To Be Renewed. .Report Of Firm To Undertake Calibration/Serviceability Checks To Be Rendered.(Spares For Testing/Firm To Undertake Calibration/Serviceability Checks Of Injectors To Be Considered In Boq Of Material) , 1020 Diesel Generator,Make-Cummins India Ltd(R) Replace Zinc Plugs Of Heat Exchangers. Firm To Quote For Material Cost Of Zn Plugs. , 1020 Diesel Generator,Make-Cummins India Ltd(S) Overhauling Of Fresh Water Pump To Be Carried Out. Pump To Be Proved For Satisfactory Performance. , 1020 Diesel Generator,Make-Cummins India Ltd(T) Firm To Supply New Fresh Water Pump , 1020 Diesel Generator,Make-Cummins India Ltd(U) Dg Cooling Sea Water Pump Suction & Discharge Pipe Line To Be Renewed. Mat Cu Ni , 1020 Diesel Generator,Make-Cummins India Ltd(V) Dg Sea Water Pump To Be Renewed Patt No 3225879. Pump Inlet And Outlet Flange Connections To Be Renewed. , 1020 Diesel Generator,Make-Cummins India Ltd(W) Replace All Flexible Hoses/Wire Breaded Hoses Of Cooling System, Lub Oil And Fuel Systems.(All Hoses To Be Considered Within The Cost Of Material) , 1020 Diesel Generator,Make-Cummins India Ltd(X) Check / Tighten All Foundation Bolts. , 1020 Diesel Generator,Make-Cummins India Ltd(Y) Carry Out Tappet Settings. , 1020 Diesel Generator,Make-Cummins India Ltd(Z) Firm To Supply And Replace Turbocharger (Conversion Kit Turbo Part No. Kit3238552) With New. , 1020 Diesel Generator,Make-Cummins India Ltd (Aa) Remove & Chemical Cleaning Of Lub Oil Cooler To Be Carried Out. Pressure Testing To Be Done .Renew Gasket & O Rings. Repairs Of End Covers To Be Undertaken , 1020 Diesel Generator,Make-Cummins India Ltd (Ab) Firm To Drain Coolant Of Both Dgs. Carry Out Descaling Of Engine Cooling Water Circuit By Circulating The Descaling Agent. Flush Through Using Restore Plus. Renew Coolant. Coolant To Be Supplied By Firm , 1020 Diesel Generator,Make-Cummins India Ltd (Ac) Sea Water Pump Foundation To Be Renewed. Firm To Fabricate Pump Foundation (Material Ss). Dip Tray To Be Manufactured Underneath The Pump And Arrangement For Water Drainage To Be Facilitate. , 1020 Diesel Generator,Make-Cummins India Ltd (Ad) Dip Tray To Be Manufactured Underneath The Pump And Arrangement For Water Drainage To Be Facilitate. , 1020 Diesel Generator,Make-Cummins India Ltd (Ae) All Rubber Duretts,Cl S,Jubilee Clips To Be Renewed. These Consumables To Be Supplied By Firm. Dia 40-60 Mm, , 1020 Diesel Generator,Make-Cummins India Ltd (Af) Air Intake Filter To Be Renewed , 1020 Diesel Generator,Make-Cummins India Ltd (Ag) Remove & Chemical Cleaning Of Fresh Water Cooler To Be Carried Out. Pressure Testing To Be Done .Renew Gasket & O Rings. Repairs Of End Covers To Be Undertaken , 1020 Diesel Generator,Make-Cummins India Ltd (Ah) Firm To Clean Fresh Water Expansion Tank Internally And Externally. Tank To Be Chemically Cleaned Internally. Pressure Testing To Be Carried Out. Necessary Repair To Be Undertaken. Tank To Be Painted. Pressure Cap To Be Replaced With New. , 1020 Diesel Generator,Make-Cummins India Ltd (Ak) Firm To Supply And Renew Expansion Tank , 1020Eqpt : Diesel Generator, Make: Cumminsam) Firm To Supply And Replacement Of Rocker Cover Gaskets To Be Carried Out , 1020Eqpt : Diesel Generator, Make: Cumminsan) Dismantle And Carry Out Chemical Cleaning Of Exhaust Compensator And Silencer. Carry Out Insite Pressure Testing Of The Double Jacket Of Exhaust Trunking , Identify Leaks And Rectify. Carry Out Exhaust Trunking Alignment And Securing. , 1020Eqpt : Diesel Generator, Make: Cumminsap) Tightening Of All Foundation Bolts Of Engine And Alternator Mountings. , 1020Eqpt : Diesel Generator, Make: Cumminsaq) Dg Lub Oil Priming Pump (Manually Operated, Semi Rotary Pump) To Be Overhauled And Prove For Satisfactory Operation. , 1020Eqpt : Diesel Generator, Make: Cumminsar) Firm To Supply New Dg Lub Oil Pump (Manually Operated, Semi Rotary Pump) To Be Replaced With New And Prove For Satisfactory Operation.. , 1020Eqpt : Diesel Generator, Make: Cumminsas) Firm To Supply And Fitment Of New Exhaust Line Pressure Gauges With Sensors , 1020Eqpt : Diesel Generator, Make: Cumminsat)Firm To Supply And Renew Fresh Water And Sea Water Pump Belts , 1020Eqpt : Diesel Generator, Make: Cumminsau) Firm To Supply Lub Oil Level Dipsticks (Part No. 119704) , 1020Eqpt : Diesel Generator, Make: Cumminsav) Post Completion Of Routines, Start The Engine And Check All Parameters . Undertake Load Trials . Prove For Satisfactory Performance. , 1021 Eqpt: Hand Pumps (E/R Bilge,Fo,Lo,Fw,Forward Bilge) ( All Pumps Are Hard To Operate) Make: M/S Bhargav , 1021 Eqpt: Hand Pumps(A) Dismantle And Clean Pumps Internally, Firm To Supply New Spares And Fitment Of Wear Down Parts , 1021 Eqpt: Hand Pumps(B) Fitment Of Pump Suction Cocks To Be Carried Out, Size 25 Mm , 1021 Eqpt: Hand Pumps(C) Firm To Supply New Spares And Fitment Of Wooden Handles Of Pumps To Be Carried Out. ( As Per Existing S Le) , 1021 Eqpt: Hand Pumps(D) Pump To Be Boxed Back And Proved For Satisfactory Performance. , 1022 Eqpt: System Valves. Following System Valves To Be Removed, Chemically Cleaned, Overhauling To Be Carried Out. All Valves To Be Painted As Per Colour Code. Post Overhauling Pressure Testing To Be Done , 1022 Eqpt: System Valvessea Water System:- Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(A) 200Mm Gate Valve , 1022 Eqpt: System Valvessea Water System:- Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(B) 80Mm Sdnr Valve , 1022 Eqpt: System Valvessea Water System:- Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(C) 65Mm Sdnr Valve , 1022 Eqpt: System Valvessea Water System:- Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(D) 40Mm Sdnr Valve , 1022 Eqpt: System Valvessea Water System:- Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(E) 80 Mm Angle Valve , 1022 Eqpt: System Valvessea Water System:- Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(F) 65Mm Angle Valve , 1022 Eqpt: System Valvesbilge System: Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(G) 80Mm Sdnr Valve , 1022 Eqpt: System Valvesbilge System : Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(H) 60Mm Sdnr Valve , 1022 Eqpt: System Valvesbilge System: Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(J) 50Mm Sdnr Valve , 1022 Eqpt: System Valvesfuel Line System: Overhauling Of Valve To Be Carried Out And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(K) 40Mm Qsv Spring Loaded Valve , 1022 Eqpt: System Valvesfuel Line System: Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(M) 25Mm Qsv Valve , 1022 Eqpt: System Valvesfuel Line System: Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(N) 40Mm Sdnr Valve , 1022 Eqpt: System Valvesfuel Line System: Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(P) 20Mm Sdnr , 1022 Eqpt: System Valvesfresh Water Valve: Overhauling Of Valve To Be Carried Out. Chemical Cleaning And Pressure Testing Of Valve To Be Carried Out. All Valves To Be Painted As Per Colour Code(Q) 32Mm Sdnr , 1022 Eqpt: System Valvesexhaust Drain Line: Firm To Supply New Valves And Same To Be Fitted At Position As Indicated. Prove For Satisfactory Operation. (R) 20Mm Ball Valve , 1022 Eqpt: System Valvesexhaust Drain Line: Firm To Supply New Valves And Same To Be Fitted At Position As Indicated. Prove For Satisfactory Operation. (S) 10Mm Ball Valve , 1022 Eqpt: System Valvesfire Line; Chemical Cleaning And Pressure Testing Of The Following To Be Carried Out. All Valves To Be Painted As Per Colour Code(T) 60Mm Fire Hydrant Valves , 1022 Eqpt: System Valvesfire Line: Chemical Cleaning And Pressure Testing Of The Following To Be Carried Out. All Valves To Be Painted As Per Colour Code(U) 50Mm Sdnr Valves , 1022 Eqpt: System Valvesfifi Line: Chemical Cleaning And Pressure Testing Of The Following To Be Carried Out. All Valves To Be Painted As Per Colour Code(V) 200Mm Sdnr Valve , 1022 Eqpt: System Valvesfifi Line: Chemical Cleaning And Pressure Testing Of The Following To Be Carried Out. All Valves To Be Painted As Per Colour Code(W) 300Mm Gate Valve , 1022 Eqpt: System Valvesfifi Line: Chemical Cleaning And Pressure Testing Of The Following To Be Carried Out. All Valves To Be Painted As Per Colour Code(X) 100Mm Sdnr Valve , 1022 Eqpt: System Valvesair Line: Firm To Supply New Valves And Same To Be Fitted At Position As Indicated. Prove For Satisfactory Operation. (Y) 25Mm Ball Valve , 1022 Eqpt: System Valvesair Line: Firm To Supply New Valves And Same To Be Fitted At Position As Indicated. Prove For Satisfactory Operation. (Z) 15Mm Ball Valve , 1022 Eqpt: System Valves(Aa) Firm To Supply New Spares And Fitment Of15mm Ball Valve To Be Carried Out , 1022 Eqpt: System Valves(Ab) Firm To Supply New Spares And Fitment Of 25Mm Ball Valves To Be Carried Out , 1022Eqpt/ System: Air Bottles, Make- Elgi, Capacity-250Ltr, Max Working Pressure-30 Bar, Test Pressure-49.5 Bar , 1022Eqpt/ System: Air Bottles(A) Chemical Cleaning And Pressure Testing Of Air Bottles To Be Carried Out. Thread Cleaning For Inlet, Outlet Pipe Nipple Fittings To Be Carried Out. Replacement Of Drain Valve, Inlet Valve And Outlet Valve To Be Carried Out. Firm To Supply New Valves For Each Bottle. , 1022Eqpt/ System: Air Bottles(B) Firm To Undertake Calibration/Serviceability Checks Of Safety Valve To Be Carried Out. Prove For Satisfactory Operation , 1022Eqpt/ System: Air Bottles(C ) Firm To Supply New Gauges And Fitment Of Pressure Gauges (0 - 50 Bar) To Be Carried Out , Electrical Work Packageall Electrical Power Components / Spares Like Contactors, Overload Relays, Etc Are To Be Sourced From Navy Approved Vendors. Important Note:- Following Points Are Applicable For All Relevant Dls And Shipyards/Firms To Consider And Quote Accordingly. (A) Firm To Supply New Spares And Fitment Of Items / Spares:- (I) Firm To Supply New Spares And Fitment Of Items / Spares Wherever Mentioned In The Qdl To Be Undertaken By Shipyard / Firm As Per The S Le / Drawing / Details Provided By Ss / Coa / Rmt. (Ii) Shipyard / Firm Should Undertake The Routines / Overhaul Of The Equipment Including The Mandatory Spares Required For Undertaking The Same, Irrespective Of The Spares Mentioned In The Mandatory Spares List Provided By Nd(V). (Iii) Further, The Cost Should Include The Degutting Of Existing Item, Supply Of New Item, Fitment And Proving Of The System Post Renewal.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 09-06-2026 24-06-2026

Key Dates

Publish Date 09-06-2026
Last Date of Bid Submission 24-06-2026
Tender Opening Date 24-06-2026

Contact Information

Company Name Indian Navy
Address VISHAKHAPATNAM CITY

BOQ Items

Sl. No. Item TitleItem Description
1HULL QDLs-AJR-MR-26001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e. ND(V) slipway). Note 2:- Last date of Undocking - 04 Oct 21HULL QDLs-AJR-MR-26001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e. ND(V) slipway). Note 2:- Last date of Undocking - 04 Oct 21
2002 Hull Cleaning (a) Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and present for survey (a) U/W area: 310 Sqm,(b) Boot Top area: 40 Sqm002 Hull Cleaning (a) Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and present for survey (a) U/W area: 310 Sqm,(b) Boot Top area: 40 Sqm
3002 Hull Cleaning (b) Miscellaneous Tanks The following tanks to be cleaned and present for survey:- Fore Peak Tank-01 Ballast Tanks/void space (02 Nos), Cable locker-01 Fresh water tanks -02 Fire fighting foam tanks -01 , Cofferdams -02 Note: - Ventilation and gas free for all tanks to be carried out. The residue/ left over inside tanks to be transferred to empty drums. Manually cleaning of all tanks to be carried out. The tanks should be washed out with fresh water and soap water to remove any sediment or dirt present in the tank. All tanks to be made available for undertaking survey.002 Hull Cleaning (b) Miscellaneous Tanks The following tanks to be cleaned and present for survey:- Fore Peak Tank-01 Ballast Tanks/void space (02 Nos), Cable locker-01 Fresh water tanks -02 Fire fighting foam tanks -01 , Cofferdams -02 Note: - Ventilation and gas free for all tanks to be carried out. The residue/ left over inside tanks to be transferred to empty drums. Manually cleaning of all tanks to be carried out. The tanks should be washed out with fresh water and soap water to remove any sediment or dirt present in the tank. All tanks to be made available for undertaking survey.
4002 Hull Cleaning (c) Internal Compartments - Engine Room and SRP compartment Manually cleaning of following internal compartments to be carried out and present for undertaking survey. (i) Engine room. (ii) SRP compartment002 Hull Cleaning (c) Internal Compartments - Engine Room and SRP compartment Manually cleaning of following internal compartments to be carried out and present for undertaking survey. (i) Engine room. (ii) SRP compartment
5002 Hull Cleaning (d) Fuel and Lub Oil Tanks Ventilation and gas free for all tanks to be carried out. The residue/ left over inside tanks to be transferred to empty drums. Manually cleaning of all tanks to be carried out. The tanks should be washed out with fresh water and soap water to remove any sediment or dirt present in the tank. All tanks to be made available for undertaking survey. The following tanks to be cleaned and present for survey:- (a) Fuel Tank (02 no's) (b) RU Tanks (02 no's) (c) Lub Oil Tank002 Hull Cleaning (d) Fuel and Lub Oil Tanks Ventilation and gas free for all tanks to be carried out. The residue/ left over inside tanks to be transferred to empty drums. Manually cleaning of all tanks to be carried out. The tanks should be washed out with fresh water and soap water to remove any sediment or dirt present in the tank. All tanks to be made available for undertaking survey. The following tanks to be cleaned and present for survey:- (a) Fuel Tank (02 no's) (b) RU Tanks (02 no's) (c) Lub Oil Tank
6003 Hull survey (a) Visual Survey External and Internal Hull survey. Carry out visual and hammer survey (in the presence of QC representatives) in accordance with NO 01/15 of under water hull, boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, Manholes ,all stiffeners and deck fittings etc.. Approx. area: 3000 Sqm Firm to submit 07 copies of Hull survey report . Firm to prove the welds by non-destructive tests and by hose test on completion of welding.003 Hull survey (a) Visual Survey External and Internal Hull survey. Carry out visual and hammer survey (in the presence of QC representatives) in accordance with NO 01/15 of under water hull, boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, Manholes ,all stiffeners and deck fittings etc.. Approx. area: 3000 Sqm Firm to submit 07 copies of Hull survey report . Firm to prove the welds by non-destructive tests and by hose test on completion of welding.
7003 Hull survey (b) UTG Survey External and Internal Hull survey. Carry out UTG survey in the presence of QC representatives of U/W hull, ship side, superstructure, weather deck, bulkheads, Tanks, living spaces covering entire part of hull. Firm to submit 07 copies of Hull survey report.003 Hull survey (b) UTG Survey External and Internal Hull survey. Carry out UTG survey in the presence of QC representatives of U/W hull, ship side, superstructure, weather deck, bulkheads, Tanks, living spaces covering entire part of hull. Firm to submit 07 copies of Hull survey report.
8004 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/degutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipment's with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc. Note 2:- Firms to indicate cost of new panelling(2mm thick) and Lagging (2\\" MFMB) material in the budgetary cost for 50 sqm each.004 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/degutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipment's with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc. Note 2:- Firms to indicate cost of new panelling(2mm thick) and Lagging (2\\" MFMB) material in the budgetary cost for 50 sqm each.
9005 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) 25 x 25 mm -005 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) 25 x 25 mm -
10005 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) 50 x50 mm -005 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) 50 x50 mm -
11006 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor006 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
12007 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.007 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
13008 Sea tube (a) Hydro jet blasting, survey, Repairs and pressure testing of sea tube including sea chest to be carried out.008 Sea tube (a) Hydro jet blasting, survey, Repairs and pressure testing of sea tube including sea chest to be carried out.
14008 Sea tube (b) Carryout renewal of sea tubes, OD-300mm, schedule 80.008 Sea tube (b) Carryout renewal of sea tubes, OD-300mm, schedule 80.
15009 Draught Marks Draught marks to be renewed and painted. Both Roman and Numeric.009 Draught Marks Draught marks to be renewed and painted. Both Roman and Numeric.
16010 Sacrificial Anodes (a) Firm to supply and Renew Sacrificial anodes (MK-II) .010 Sacrificial Anodes (a) Firm to supply and Renew Sacrificial anodes (MK-II) .
17010 Sacrificial Anodes (b) Firm to supply and Renew Sacrificial anodes (MK-III)010 Sacrificial Anodes (b) Firm to supply and Renew Sacrificial anodes (MK-III)
18011 Surface preparation Under Water area including Boot top area Grit blasting to SA 2.5 on the underwater areas for removal of U/W paint and application of Under water paint scheme as per NO 01/15011 Surface preparation Under Water area including Boot top area Grit blasting to SA 2.5 on the underwater areas for removal of U/W paint and application of Under water paint scheme as per NO 01/15
19011 Surface preparation Under Water area including Boot top area Grit blasting to SA 1 on the underwater areas for removal of U/W paint and application of Under water paint scheme as per NO 01/15011 Surface preparation Under Water area including Boot top area Grit blasting to SA 1 on the underwater areas for removal of U/W paint and application of Under water paint scheme as per NO 01/15
20012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - Pen guard Primer , DFT-50 microns012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - Pen guard Primer , DFT-50 microns
21012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also.. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jota coat Universal N10 (Aluminium) - 150 microns012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also.. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jota coat Universal N10 (Aluminium) - 150 microns
22012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jota coat Universal N10 (grey) - 150 microns012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jota coat Universal N10 (grey) - 150 microns
23012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard Universal ES(Red) - 125 microns012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard Universal ES(Red) - 125 microns
24012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea quantum Pro U(Light Red) - 150 microns012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea quantum Pro U(Light Red) - 150 microns
25012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F:Seaquantum Pro U (Dark Red) - 150 microns012 Under Water Area - Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F:Seaquantum Pro U (Dark Red) - 150 microns
26012 Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 7th Top Coat: A/F Seaquantum Spectrum (Black) - 150 microns DFT012 Painting - JOTUN Scheme. Paint under water area with following paint scheme:-note:- Quoted repair cost shall be inclusive of cost of paints also. Paint under water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 7th Top Coat: A/F Seaquantum Spectrum (Black) - 150 microns DFT
27013 Surface preparation Above Water Area and Bulwark including guardrails Carry out spot blasting to SA 2.5 standard for paint application013 Surface preparation Above Water Area and Bulwark including guardrails Carry out spot blasting to SA 2.5 standard for paint application
28013 Surface preparation Above Water Area and Bulwark including guardrails Carry out spot blasting to SA 1 standard for paint application013 Surface preparation Above Water Area and Bulwark including guardrails Carry out spot blasting to SA 1 standard for paint application
29013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Pen guard primer (Red), 50 microns DFT013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Pen guard primer (Red), 50 microns DFT
30013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jota mastic 80 (Red Brown) - 125 microns DFT013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jota mastic 80 (Red Brown) - 125 microns DFT
31013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme Paint above water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota mastic 80 (Grey) - 125 microns DFT013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme Paint above water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota mastic 80 (Grey) - 125 microns DFT
32013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hardtop XP (RAL9011) - 60 microns DFT013 Painting Above Water Area and Bulwark including guardrails - JOTUN Scheme. Paint above water area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hardtop XP (RAL9011) - 60 microns DFT
33014 Surface preparation Super Structure, Deck Fittings Carry out mechanical cleaning to ST 1 standard for paint application014 Surface preparation Super Structure, Deck Fittings Carry out mechanical cleaning to ST 1 standard for paint application
34014 Surface preparation Super Structure, Deck Fittings Carry out mechanical cleaning to ST 3 standard for paint application014 Surface preparation Super Structure, Deck Fittings Carry out mechanical cleaning to ST 3 standard for paint application
35015 Painting Superstructure and Deck fittings - JOTUN Scheme. Paint super structure area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Pen guard primer (Red), 50 microns DFT015 Painting Superstructure and Deck fittings - JOTUN Scheme. Paint super structure area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Pen guard primer (Red), 50 microns DFT
36015 Painting Superstructure and Deck fittings - JOTUN Scheme. Paint super structure area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jota mastic 80 (Red Brown) - 125 microns DFT015 Painting Superstructure and Deck fittings - JOTUN Scheme. Paint super structure area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jota mastic 80 (Red Brown) - 125 microns DFT
37015 Painting Superstructure and Deck fittings - JOTUN Scheme. Paint super structure area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota mastic 80 (Grey) - 125 microns DFT015 Painting Superstructure and Deck fittings - JOTUN Scheme. Paint super structure area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota mastic 80 (Grey) - 125 microns DFT
38015 Painting Superstructure and Deck fittings - JOTUN Scheme. Paint super structure area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: RAL 9010 white - 100 microns DFT015 Painting Superstructure and Deck fittings - JOTUN Scheme. Paint super structure area with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: RAL 9010 white - 100 microns DFT
39016 Surface preparation Weather Deck and fittings Carry out surface preparation to WJ 2.0 standard for paint application as per survey report by Paint OEM rep016 Surface preparation Weather Deck and fittings Carry out surface preparation to WJ 2.0 standard for paint application as per survey report by Paint OEM rep
40017 Painting Weather Deck and fittings - JOTUN Scheme. Paint weather decks and fittings with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Pen guard primer (Red), 50 microns DFT017 Painting Weather Deck and fittings - JOTUN Scheme. Paint weather decks and fittings with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Pen guard primer (Red), 50 microns DFT
41017 Painting Weather Deck and fittings - JOTUN Scheme. Paint weather decks and fittings with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jota mastic 87 (Aluminium) - 300 microns DFT017 Painting Weather Deck and fittings - JOTUN Scheme. Paint weather decks and fittings with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jota mastic 87 (Aluminium) - 300 microns DFT
42017 Painting Weather Deck and fittings - JOTUN Scheme. paint with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jot armour BS640 - 800 microns017 Painting Weather Deck and fittings - JOTUN Scheme. paint with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jot armour BS640 - 800 microns
43018 Surface preparation Internal compartments -Tanks Carry out mechanical surface preparation to ST 1 standards for paint application wherever peeled off / paint defective in Fore Peak Tanks-02 Ballast Tanks-02 Nos Cable locker-01 Fire fighting foam tanks -01 Cofferdams -02018 Surface preparation Internal compartments -Tanks Carry out mechanical surface preparation to ST 1 standards for paint application wherever peeled off / paint defective in Fore Peak Tanks-02 Ballast Tanks-02 Nos Cable locker-01 Fire fighting foam tanks -01 Cofferdams -02
44018 Surface preparation Internal compartments -Tanks Carry out mechanical surface preparation to ST 3 standards for paint application wherever peeled off / paint defective in Fore Peak Tanks-02 Ballast Tanks-02 Nos Cable locker-01 Fire fighting foam tanks -01 Cofferdams -02018 Surface preparation Internal compartments -Tanks Carry out mechanical surface preparation to ST 3 standards for paint application wherever peeled off / paint defective in Fore Peak Tanks-02 Ballast Tanks-02 Nos Cable locker-01 Fire fighting foam tanks -01 Cofferdams -02
45019 Painting Fore peak Tank, Ballast tank, Cable locker , Cofferdam, Fresh water tanks and Fire fighting foam tanks - JOTUN Scheme. Paint fore peak tanks, cofferdams and cable locker with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Pen guard Primer(Red)-50 microns DFT019 Painting Fore peak Tank, Ballast tank, Cable locker , Cofferdam, Fresh water tanks and Fire fighting foam tanks - JOTUN Scheme. Paint fore peak tanks, cofferdams and cable locker with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Pen guard Primer(Red)-50 microns DFT
46019 Painting Fore peak Tank, Ballast tank, Cable locker , Cofferdam, Fresh water tanks and Fire fighting foam tanks - JOTUN Scheme. . Paint fore peak tanks, cofferdams and cable locker with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jota coat Universal (Aluminium) - 150 microns019 Painting Fore peak Tank, Ballast tank, Cable locker , Cofferdam, Fresh water tanks and Fire fighting foam tanks - JOTUN Scheme. . Paint fore peak tanks, cofferdams and cable locker with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jota coat Universal (Aluminium) - 150 microns
47019 Painting Fore peak Tank, Ballast tank, Cable locker , Cofferdam, Fresh water tanks and Fire fighting foam tanks - JOTUN Scheme. . Paint fore peak tanks, cofferdams and cable locker with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota coat Universal (Grey) - 150 microns019 Painting Fore peak Tank, Ballast tank, Cable locker , Cofferdam, Fresh water tanks and Fire fighting foam tanks - JOTUN Scheme. . Paint fore peak tanks, cofferdams and cable locker with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota coat Universal (Grey) - 150 microns
48019 Painting Fore peak Tank, Ballast tank, Cable locker , Cofferdam and Fire fighting foam tanks - JOTUN Scheme. . Paint fore peak tanks, cofferdams and cable locker with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Pen guard Top Coat -50 microns019 Painting Fore peak Tank, Ballast tank, Cable locker , Cofferdam and Fire fighting foam tanks - JOTUN Scheme. . Paint fore peak tanks, cofferdams and cable locker with following paint scheme:-Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Pen guard Top Coat -50 microns
49020 Surface preparation Fresh water and fresh water gravity tanks. Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application. Fresh water tanks, Foam tank and Fresh water gravity tanks020 Surface preparation Fresh water and fresh water gravity tanks. Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application. Fresh water tanks, Foam tank and Fresh water gravity tanks
50021 Painting Fresh water and fresh water gravity tanks- JOTUN Scheme. Paint both fresh water tanks/ foam tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Pen guard HB (White)- 1X100 microns DFT021 Painting Fresh water and fresh water gravity tanks- JOTUN Scheme. Paint both fresh water tanks/ foam tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Pen guard HB (White)- 1X100 microns DFT
51021 Painting Fresh water and fresh water gravity tanks- JOTUN Scheme. Paint both fresh water tanks/ foam tanks with following paint scheme:- note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Pen guard HB(Grey) - 1X100 microns DFT021 Painting Fresh water and fresh water gravity tanks- JOTUN Scheme. Paint both fresh water tanks/ foam tanks with following paint scheme:- note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Pen guard HB(Grey) - 1X100 microns DFT
52021 Painting Fresh water and fresh water gravity tanks- JOTUN Scheme. Paint both fresh water tanks/ foam tanks with following paint scheme:- note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Pen guard HB(White) - 1X100 microns DFT021 Painting Fresh water and fresh water gravity tanks- JOTUN Scheme. Paint both fresh water tanks/ foam tanks with following paint scheme:- note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Pen guard HB(White) - 1X100 microns DFT
53022 Surface Preparation Internal Compartments - Bilges of Engine Room and ASP Compartment Carry out mechanical cleaning to ST 1 standard as survey report of Paint OEM for paint application.022 Surface Preparation Internal Compartments - Bilges of Engine Room and ASP Compartment Carry out mechanical cleaning to ST 1 standard as survey report of Paint OEM for paint application.
54022 Surface Preparation Internal Compartments - Bilges of Engine Room and ASP Compartment Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application.022 Surface Preparation Internal Compartments - Bilges of Engine Room and ASP Compartment Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application.
55023 Painting Bilges of Engine Room and ASP Compartment - JOTUN Scheme. Paint bilges of Engine room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Pen guard Primer(Red) - 50 microns DFT023 Painting Bilges of Engine Room and ASP Compartment - JOTUN Scheme. Paint bilges of Engine room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Pen guard Primer(Red) - 50 microns DFT
56023 Painting Bilges of Engine Room and ASP Compartment - JOTUN Scheme. Paint bilges of Engine room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anticorrosive - Jota coat Universal N10(Aluminium) - 150 microns023 Painting Bilges of Engine Room and ASP Compartment - JOTUN Scheme. Paint bilges of Engine room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anticorrosive - Jota coat Universal N10(Aluminium) - 150 microns
57023 Painting Bilges of Engine Room and ASP Compartment - JOTUN Scheme. Paint bilges of Engine room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Jota coat Universal N10(Grey) - 150 microns023 Painting Bilges of Engine Room and ASP Compartment - JOTUN Scheme. Paint bilges of Engine room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Jota coat Universal N10(Grey) - 150 microns
58023 Painting Bilges of Engine Room and ASP Compartment - JOTUN Scheme. Paint bilges of Engine room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: Top Coat -Pen guard Top Coat(Grey 38)- 50 microns023 Painting Bilges of Engine Room and ASP Compartment - JOTUN Scheme. Paint bilges of Engine room and ASP compartment with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also (d) 4th Coat: Top Coat -Pen guard Top Coat(Grey 38)- 50 microns
59024 Surface Preparation Bulkheads of Engine room and SRP compartments and living spaces. (a) Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application.024 Surface Preparation Bulkheads of Engine room and SRP compartments and living spaces. (a) Carry out mechanical cleaning to ST 3 standard as survey report of Paint OEM for paint application.
60024 Surface Preparation Bulkheads of Engine room and SRP compartments and living spaces. (b) Carry out mechanical cleaning to ST 1 standard as survey report of Paint OEM for paint application.024 Surface Preparation Bulkheads of Engine room and SRP compartments and living spaces. (b) Carry out mechanical cleaning to ST 1 standard as survey report of Paint OEM for paint application.
61025 Painting Bulkheads of Engine room and SRP compartments and living spaces - JOTUN Scheme. Paint bulkheads of Engine room and SRP compartments and living spaces ,with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Pen guard Primer - 50 microns DFT025 Painting Bulkheads of Engine room and SRP compartments and living spaces - JOTUN Scheme. Paint bulkheads of Engine room and SRP compartments and living spaces ,with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Pen guard Primer - 50 microns DFT
62025 Painting Bulkheads of Engine room and SRP compartments and living spaces - JOTUN Scheme. Paint bulkheads of Engine room and SRP compartments and living spaces ,with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: White interior fire retardant paint 100 microns DFT025 Painting Bulkheads of Engine room and SRP compartments and living spaces - JOTUN Scheme. Paint bulkheads of Engine room and SRP compartments and living spaces ,with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: White interior fire retardant paint 100 microns DFT
63025 Painting Bulkheads of Engine room and SRP compartments and living spaces - JOTUN Scheme. Paint bulkheads of Engine room and SRP compartments and living spaces ,with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3nd Coat: White interior fire retardant paint 100 microns DFT025 Painting Bulkheads of Engine room and SRP compartments and living spaces - JOTUN Scheme. Paint bulkheads of Engine room and SRP compartments and living spaces ,with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3nd Coat: White interior fire retardant paint 100 microns DFT
64026 Air Pressure Testing Air Pressure Test the following tanks to 0.14 Kg per Sq. Cms and rectify the defects any observed during pressure testing and prove. note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Fresh Water Tank- 01 ,Foam tank -01, Lub oil tank-01 , FO tank -02, FODS tank -02, Fore peak tank-01, Void space/Ballast tank -02026 Air Pressure Testing Air Pressure Test the following tanks to 0.14 Kg per Sq. Cms and rectify the defects any observed during pressure testing and prove. note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Fresh Water Tank- 01 ,Foam tank -01, Lub oil tank-01 , FO tank -02, FODS tank -02, Fore peak tank-01, Void space/Ballast tank -02
65027 Bilge Platform plate (a) Renew bilge platform plate. Material- aluminium chequered plate, thickness- 05 mm027 Bilge Platform plate (a) Renew bilge platform plate. Material- aluminium chequered plate, thickness- 05 mm
66027 Bilge Platform Supporting brackets (b) Bilge platform supporting brackets at indicated locations to be renewed. Mat - MS027 Bilge Platform Supporting brackets (b) Bilge platform supporting brackets at indicated locations to be renewed. Mat - MS
67028 Key Fender securing arrangement (a) Removal of head and stern key fenders for hull survey. Post repair on hull , fender fitment to be carried.028 Key Fender securing arrangement (a) Removal of head and stern key fenders for hull survey. Post repair on hull , fender fitment to be carried.
68028 Key Fender Head & Stern fenders Key Fender securing arrangement (b) Coaming plate and partition plates between fenders corroded, thinned and holed. All fittings to be renewed as per survey reports . Note: - Work involves removal of head and stern key fenders for hull survey and repair/ renewal of top and bottom securing brackets/ plates and partition plates. Top and bottom securing brackets/ plates and partition plates size: 130mm x 8mm thick028 Key Fender Head & Stern fenders Key Fender securing arrangement (b) Coaming plate and partition plates between fenders corroded, thinned and holed. All fittings to be renewed as per survey reports . Note: - Work involves removal of head and stern key fenders for hull survey and repair/ renewal of top and bottom securing brackets/ plates and partition plates. Top and bottom securing brackets/ plates and partition plates size: 130mm x 8mm thick
69028 Key Fender Head & Stern fenders Key Fender securing arrangement (c) Renewal securing rod - M24 DIA , Length of rod varies between 1225 mm to 620 mm. All nuts are to be tack welded post tightening.028 Key Fender Head & Stern fenders Key Fender securing arrangement (c) Renewal securing rod - M24 DIA , Length of rod varies between 1225 mm to 620 mm. All nuts are to be tack welded post tightening.
70028 Key Fender (d) All Head Key Fenders to be renewed with White colour fenders as per sizes. Specification - EPDM rubber as per NES 170.Crossection size 250mmx250mm. Length of fenders varies between 729mm to 633 mm. . Note: Quote for material only view services covered at sl (a)028 Key Fender (d) All Head Key Fenders to be renewed with White colour fenders as per sizes. Specification - EPDM rubber as per NES 170.Crossection size 250mmx250mm. Length of fenders varies between 729mm to 633 mm. . Note: Quote for material only view services covered at sl (a)
71028 Key Fender (e) All Aft Key Fenders to be renewed with White colour fenders as per size Cross section size 250mmx250mm. . Length of fenders varies between 1126mm to 520 mm. Note: Quote for material only view services covered at sl (a)028 Key Fender (e) All Aft Key Fenders to be renewed with White colour fenders as per size Cross section size 250mmx250mm. . Length of fenders varies between 1126mm to 520 mm. Note: Quote for material only view services covered at sl (a)
72028 Fender (e) Portable pneumatic fender to be provided by firm.028 Fender (e) Portable pneumatic fender to be provided by firm.
73028 Fender (e) Portable fender (apple buoy fender) to be provided by firm.028 Fender (e) Portable fender (apple buoy fender) to be provided by firm.
74029 Tyre Fender Tyre fender damaged on P&S side to be renewed with used aircraft tyre fenders moulded with 8 mm layer of white natural rubber on top and outer sides. Mat- Rubber, colour-white. No painting will be permitted. any other type of tyres not to be used. (a) OD 750mm; ID 450 mm , width - 350 mm029 Tyre Fender Tyre fender damaged on P&S side to be renewed with used aircraft tyre fenders moulded with 8 mm layer of white natural rubber on top and outer sides. Mat- Rubber, colour-white. No painting will be permitted. any other type of tyres not to be used. (a) OD 750mm; ID 450 mm , width - 350 mm
75029 Tyre Fender Tyre fenders damaged on P&S side to be renewed with used automobile tyre fenders moulded with 8 mm layer of white natural rubber on top and outer sides. Mat- Rubber, colour-white. No painting or coating of any other form will be permitted. Vendors to adhere to SoW (b) Tyre fender OD-1400 mm ID -1000 mm Width -350 mm029 Tyre Fender Tyre fenders damaged on P&S side to be renewed with used automobile tyre fenders moulded with 8 mm layer of white natural rubber on top and outer sides. Mat- Rubber, colour-white. No painting or coating of any other form will be permitted. Vendors to adhere to SoW (b) Tyre fender OD-1400 mm ID -1000 mm Width -350 mm
76030 Tyre Fender securing arrangement Tyre fender to be secured with 14 mm Dia chain on head, stern and ship side (a) Securing chains: 14mm Dia(Mat-GI)030 Tyre Fender securing arrangement Tyre fender to be secured with 14 mm Dia chain on head, stern and ship side (a) Securing chains: 14mm Dia(Mat-GI)
77030 Tyre Fender securing arrangement Tyre fender to be secured with D shackles on ship side (b) D Shackles 14 mm Dia(Mat-GI)030 Tyre Fender securing arrangement Tyre fender to be secured with D shackles on ship side (b) D Shackles 14 mm Dia(Mat-GI)
78030 Tyre Fender securing arrangement Securing chain is to be passed through metallic sleeves. Firm to undertake primer and anti corrosive paint on all metallic sleeves. (c) Securing sleeves of Dia 03 inch and length 250 mm (Mat MS pipe of 06mm thick)030 Tyre Fender securing arrangement Securing chain is to be passed through metallic sleeves. Firm to undertake primer and anti corrosive paint on all metallic sleeves. (c) Securing sleeves of Dia 03 inch and length 250 mm (Mat MS pipe of 06mm thick)
79030 Tyre Fender securing arrangement Tyre fenders securing eye plates to be welded along ships side for connecting of securing chains (d) Eye plate thickness 8 mm. (Mat - MS)030 Tyre Fender securing arrangement Tyre fenders securing eye plates to be welded along ships side for connecting of securing chains (d) Eye plate thickness 8 mm. (Mat - MS)
80031 Under water fenders (a) Underwater fenders to be removed, inspected and surveyed and necessary repairs to be attended on fender securing brackets(C Channel) and associated hull.031 Under water fenders (a) Underwater fenders to be removed, inspected and surveyed and necessary repairs to be attended on fender securing brackets(C Channel) and associated hull.
81031 Under water fenders (b) ) All underwater Fenders to be renewed as per sample, Black colour fenders below water and above water fenders with Grey/white colour fenders to be renewed. Specification - EPDM rubber as per NES 170, D fenders Max Size--D Fender 250x250x1000mm031 Under water fenders (b) ) All underwater Fenders to be renewed as per sample, Black colour fenders below water and above water fenders with Grey/white colour fenders to be renewed. Specification - EPDM rubber as per NES 170, D fenders Max Size--D Fender 250x250x1000mm
82031 Underwater fenders securing arrangement (c) Fenders is to be secured with proper nut, bolt and washers as per sample. (Mat - MS with nickel coating), Nut & Bolt Dia -20 mm, bolt Length-370 mm, Washer dia-22mm) (Note : QUOTE FOR NUTS BOLTS AND ASSOCIATED ACCESSORIES also)031 Underwater fenders securing arrangement (c) Fenders is to be secured with proper nut, bolt and washers as per sample. (Mat - MS with nickel coating), Nut & Bolt Dia -20 mm, bolt Length-370 mm, Washer dia-22mm) (Note : QUOTE FOR NUTS BOLTS AND ASSOCIATED ACCESSORIES also)
83032 Metallic half pipe fender Metallic half pipe fender around the shipside to be renewed. (a) Size - 150mm Dia, 08mm thick & Size - 160mm Dia, 08mm thick032 Metallic half pipe fender Metallic half pipe fender around the shipside to be renewed. (a) Size - 150mm Dia, 08mm thick & Size - 160mm Dia, 08mm thick
84033 Bulwark coaming Bulwark coaming plate corroded and thinned. To be included in hull in survey and renew as per survey report along with coaming rod. (a) Bulwark area Thickness-8 mm033 Bulwark coaming Bulwark coaming plate corroded and thinned. To be included in hull in survey and renew as per survey report along with coaming rod. (a) Bulwark area Thickness-8 mm
85033 Bulwark coaming Bulwark coaming pipes corroded and thinned. To be included in hull in survey and renew as per survey report. (b) Pipe On Bulwark - Size- Dia 3 \\", MAT-MS033 Bulwark coaming Bulwark coaming pipes corroded and thinned. To be included in hull in survey and renew as per survey report. (b) Pipe On Bulwark - Size- Dia 3 \\", MAT-MS
86034 Anchor and chain cable Anchor chain cable and associated fittings are to be mechanically cleaned, eased for free movement, hydro jet blast chain cable to bare metal, paint with black bituminous paint post survey IAW NO 07/11 and refit back. Renew off all such parts which declared unserviceable & prove load test and submit load test certificate to CoY office. The Following job involves removal of all anchor accessories, laying out and hydro jet blasting for survey and painting and final refitment post survey by ND (V. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, paint with black bituminous paint post survey IAW NO 07/11 and refit back.034 Anchor and chain cable Anchor chain cable and associated fittings are to be mechanically cleaned, eased for free movement, hydro jet blast chain cable to bare metal, paint with black bituminous paint post survey IAW NO 07/11 and refit back. Renew off all such parts which declared unserviceable & prove load test and submit load test certificate to CoY office. The Following job involves removal of all anchor accessories, laying out and hydro jet blasting for survey and painting and final refitment post survey by ND (V. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, paint with black bituminous paint post survey IAW NO 07/11 and refit back.
87034 Anchor and chain cable (a) Chain cable to be removed. Laying out and hydro jet blasting to be undertaken and presented for survey. Post successful survey of item to be painted as per norms. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, painted with black bituminous paint post survey IAW NO 07/11 and refit back.034 Anchor and chain cable (a) Chain cable to be removed. Laying out and hydro jet blasting to be undertaken and presented for survey. Post successful survey of item to be painted as per norms. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, painted with black bituminous paint post survey IAW NO 07/11 and refit back.
88034 Anchor and chain cable (b) Swivel piece to be removed. Laying out and hydro jet blasting to be undertaken and presented for survey. Post successful survey of item to be painted as per norms. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, painted with black bituminous paint post survey IAW NO 07/11 and refit back.034 Anchor and chain cable (b) Swivel piece to be removed. Laying out and hydro jet blasting to be undertaken and presented for survey. Post successful survey of item to be painted as per norms. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, painted with black bituminous paint post survey IAW NO 07/11 and refit back.
89034 Anchor and chain cable (c) Lug less joining shackles to be removed. Laying out and hydro jet blasting to be undertaken and presented for survey. Post successful survey of item to be painted as per norms. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, painted with black bituminous paint post survey IAW NO 07/11 and refit back.034 Anchor and chain cable (c) Lug less joining shackles to be removed. Laying out and hydro jet blasting to be undertaken and presented for survey. Post successful survey of item to be painted as per norms. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, painted with black bituminous paint post survey IAW NO 07/11 and refit back.
90034 Anchor and chain cable (d) D Shackles to be removed. Laying out and hydro jet blasting to be undertaken and presented for survey. Post successful survey of item to be painted as per norms. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, painted with black bituminous paint post survey IAW NO 07/11 and refit back.034 Anchor and chain cable (d) D Shackles to be removed. Laying out and hydro jet blasting to be undertaken and presented for survey. Post successful survey of item to be painted as per norms. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, painted with black bituminous paint post survey IAW NO 07/11 and refit back.
91034 Anchor and chain cable (e) Anchor to be removed. Laying out and hydro jet blasting to be undertaken and presented for survey. Post successful survey of item to be painted as per norms. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, painted with black bituminous paint post survey IAW NO 07/11 and refit back.034 Anchor and chain cable (e) Anchor to be removed. Laying out and hydro jet blasting to be undertaken and presented for survey. Post successful survey of item to be painted as per norms. Anchor chain cable associated fittings are to be mechanically cleaned, eased for free movement, painted with black bituminous paint post survey IAW NO 07/11 and refit back.
92035 Anchor windlass Overhauling of Anchor windlass to be carried out and prove for satisfactory operation. Note :- Overhaul involves removal of drum, gearbox, renewal of brake lining, Oil and oil sight glass. Oil grade VG 150035 Anchor windlass Overhauling of Anchor windlass to be carried out and prove for satisfactory operation. Note :- Overhaul involves removal of drum, gearbox, renewal of brake lining, Oil and oil sight glass. Oil grade VG 150
93036 Capstan Overhaul Q- deck capstan and prove for satisfactory operation. Dia 400 mm note :- Overhaul involves removal of drum, gearbox, renewal of brake lining and recharge of fresh gear box oil. Oil grade VG 150036 Capstan Overhaul Q- deck capstan and prove for satisfactory operation. Dia 400 mm note :- Overhaul involves removal of drum, gearbox, renewal of brake lining and recharge of fresh gear box oil. Oil grade VG 150
94037 Single bollards (a) Single bollards corroded, thinned and holed. To be repaired as per survey report. Details :- Size of pipe: Single bollards ,Size: 250mm Dia, 10 mm thickness, 1300 mm length. Doubler plate of Dia 300mm and 10mm thick, dummy plate of 300mm Dia and 12mm thick, supporting bracket of bollard pipe of 380mmx360mmx10mm. Tripping bracket of size 250mmx150mm and 03 no's on each bollard.037 Single bollards (a) Single bollards corroded, thinned and holed. To be repaired as per survey report. Details :- Size of pipe: Single bollards ,Size: 250mm Dia, 10 mm thickness, 1300 mm length. Doubler plate of Dia 300mm and 10mm thick, dummy plate of 300mm Dia and 12mm thick, supporting bracket of bollard pipe of 380mmx360mmx10mm. Tripping bracket of size 250mmx150mm and 03 no's on each bollard.
95037 Single bollards (b) Single bollards corroded, thinned and holed. To be renewed as per survey report. Details :- Size of pipe: Single bollards ,Size: 250mm Dia, 10 mm thickness, 1300 mm length. Doubler plate of Dia 300mm and 10mm thick, dummy plate of 300mm Dia and 12mm thick, supporting bracket of bollard pipe of 380mmx360mmx10mm. Tripping bracket of size 250mmx150mm and 03 no's on each bollard.037 Single bollards (b) Single bollards corroded, thinned and holed. To be renewed as per survey report. Details :- Size of pipe: Single bollards ,Size: 250mm Dia, 10 mm thickness, 1300 mm length. Doubler plate of Dia 300mm and 10mm thick, dummy plate of 300mm Dia and 12mm thick, supporting bracket of bollard pipe of 380mmx360mmx10mm. Tripping bracket of size 250mmx150mm and 03 no's on each bollard.
96037 Small twin Bollard (c) . Twin bollards corroded, thinned and holed. To be repaired as per survey report . Dia of bollard pipe 11 inch . Height of bollard 15 inch (02Nos). Size of bollard base/ foundation: 1.14Mtr x 0.4Mtr, Thickness of pipe: 10 mm. Doubler plate size: 125x49CM, thickness: 10mm037 Small twin Bollard (c) . Twin bollards corroded, thinned and holed. To be repaired as per survey report . Dia of bollard pipe 11 inch . Height of bollard 15 inch (02Nos). Size of bollard base/ foundation: 1.14Mtr x 0.4Mtr, Thickness of pipe: 10 mm. Doubler plate size: 125x49CM, thickness: 10mm
97037 Small twin Bollard (d) . Twin bollards corroded, thinned and holed. To be renewed as per survey report . Dia of bollard pipe 11 inch . Height of bollard 15 inch (02Nos). Size of bollard base/ foundation: 1.14Mtr x 0.4Mtr, Thickness of pipe: 10 mm. Doubler plate size: 125x49CM, thickness: 10mm037 Small twin Bollard (d) . Twin bollards corroded, thinned and holed. To be renewed as per survey report . Dia of bollard pipe 11 inch . Height of bollard 15 inch (02Nos). Size of bollard base/ foundation: 1.14Mtr x 0.4Mtr, Thickness of pipe: 10 mm. Doubler plate size: 125x49CM, thickness: 10mm
98037 Twin Bollard (e) Large Twin bollards corroded, thinned. Entire bollard to be renewed as per Hull survey report. Dia of bollard pipe 340 MM. Height of bollard 1400MM. Size of bollard base/ foundation 1575X575X10 MM: , Thickness of pipe: 10 mm. Doubler plate size: 1575X575X10 MM , thickness: 10 mm, TRIPPING BRACKET 150X10 MM037 Twin Bollard (e) Large Twin bollards corroded, thinned. Entire bollard to be renewed as per Hull survey report. Dia of bollard pipe 340 MM. Height of bollard 1400MM. Size of bollard base/ foundation 1575X575X10 MM: , Thickness of pipe: 10 mm. Doubler plate size: 1575X575X10 MM , thickness: 10 mm, TRIPPING BRACKET 150X10 MM
99038 Rubber beading Rubber beading of wt doors , hatches, scuttles perished/cracked to be renewed and chalk test to be proved. WT door. (a) Rubber beading size: specification as per sample.Note: silicon rubber beading to be used as per NCD 5910038 Rubber beading Rubber beading of wt doors , hatches, scuttles perished/cracked to be renewed and chalk test to be proved. WT door. (a) Rubber beading size: specification as per sample.Note: silicon rubber beading to be used as per NCD 5910
100038 Clips Operating clips of wt doors , hatches, scuttles sky light corroded/thinned to be overhauled and chalk test to be proved.038 Clips Operating clips of wt doors , hatches, scuttles sky light corroded/thinned to be overhauled and chalk test to be proved.
101039 WT Hatch metal coaming Metallic coaming of 05 in no WT Hatches on weather deck corroded and thinned. To be renewed as per survey report. Area - 20 Sqm.039 WT Hatch metal coaming Metallic coaming of 05 in no WT Hatches on weather deck corroded and thinned. To be renewed as per survey report. Area - 20 Sqm.
102040 NWT doors NWT wooden doors at various locations perished /damaged. To be renewed/repaired including frames.040 NWT doors NWT wooden doors at various locations perished /damaged. To be renewed/repaired including frames.
103041 Ventilation Following mushroom type ventilators to be removed, cleaned/ overhauled and fitted beck. ( a) Dia: 550mm Dia041 Ventilation Following mushroom type ventilators to be removed, cleaned/ overhauled and fitted beck. ( a) Dia: 550mm Dia
104041 Ventilation Following mushroom type ventilators to be removed, cleaned/ overhauled and fitted beck. (b) Dia - 360mm Dia041 Ventilation Following mushroom type ventilators to be removed, cleaned/ overhauled and fitted beck. (b) Dia - 360mm Dia
105042 Towing Hook Towing hook to be overhauled and load tested to 25 Tons . note 1 -The job involves overhaul of operating handle, steel wire rope and in way pullies.note 2 - Firm to project for load testing to CoY. Load testing will be undertaken by ND(VZG). Any defects occurred during load testing will be rectified by the firm.042 Towing Hook Towing hook to be overhauled and load tested to 25 Tons . note 1 -The job involves overhaul of operating handle, steel wire rope and in way pullies.note 2 - Firm to project for load testing to CoY. Load testing will be undertaken by ND(VZG). Any defects occurred during load testing will be rectified by the firm.
106043 Tanks/Manhole (a) Manholes including coaming to be renewed as per survey carried in DL No. 0003 Size of manhole: 720x520x08mm thick043 Tanks/Manhole (a) Manholes including coaming to be renewed as per survey carried in DL No. 0003 Size of manhole: 720x520x08mm thick
107043 Tanks/Manhole (b) Rubber joints of 720mmx520mmx06mm perished/deteriorated to be renewed043 Tanks/Manhole (b) Rubber joints of 720mmx520mmx06mm perished/deteriorated to be renewed
108043 Tanks/Manhole (c) Nuts and bolts/ studs of 16 mm Dia and 50 mm length -24 nos. on each manhole. mat-SS043 Tanks/Manhole (c) Nuts and bolts/ studs of 16 mm Dia and 50 mm length -24 nos. on each manhole. mat-SS
109044 Nav Light Nav light foundation (Port & Stbd) corroded, to be renewed. Size: 620mmx620mmx300mm and thickness 6mm, Mat MS044 Nav Light Nav light foundation (Port & Stbd) corroded, to be renewed. Size: 620mmx620mmx300mm and thickness 6mm, Mat MS
110045 Drainage System (a) Deck Drain pipes corroded/ holed, to be renewed. Dia 2 1/2 inch. Mat: GI note : Pipes / fittings should be secured with rubber packing's and clamps uniformly045 Drainage System (a) Deck Drain pipes corroded/ holed, to be renewed. Dia 2 1/2 inch. Mat: GI note : Pipes / fittings should be secured with rubber packing's and clamps uniformly
111045 Drainage System (b) Scupper with coaming of drain pipe ( leading from 01 deck to No. 1 deck and bridge top to platform deck corroded/ thinned, to be renewed. Size: 250mmx200mm045 Drainage System (b) Scupper with coaming of drain pipe ( leading from 01 deck to No. 1 deck and bridge top to platform deck corroded/ thinned, to be renewed. Size: 250mmx200mm
112045 Drainage System (c ) Deck drain pieces on upper deck corroded, to be renewed. Dia 2 1/2 inch, each of length 01Mtr. note-The job involves removal/renewal and fitment of pipes/ panelling/ lagging/ trunking in the way.045 Drainage System (c ) Deck drain pieces on upper deck corroded, to be renewed. Dia 2 1/2 inch, each of length 01Mtr. note-The job involves removal/renewal and fitment of pipes/ panelling/ lagging/ trunking in the way.
113045 Drainage System (d) 4\\" Soil pipes of Crew, ED's and Master's bathrooms to be removed chemically cleaned and fit back.045 Drainage System (d) 4\\" Soil pipes of Crew, ED's and Master's bathrooms to be removed chemically cleaned and fit back.
114045 Drainage System (e) 4\\" Soil pipes of Crew, ED's and Master's bathrooms corroded/holed to be renewed045 Drainage System (e) 4\\" Soil pipes of Crew, ED's and Master's bathrooms corroded/holed to be renewed
115046 Extinguishers replace with new of following extinguishers at various places. (a) 9 Ltr AFFF extinguisher046 Extinguishers replace with new of following extinguishers at various places. (a) 9 Ltr AFFF extinguisher
116046 Extinguishers replace with new of following extinguishers at various places (b) 2 Kg CO2 Extinguisher046 Extinguishers replace with new of following extinguishers at various places (b) 2 Kg CO2 Extinguisher
117046 Extinguishers replace with new of following extinguishers. (c) 10 Kg DCP extinguisher046 Extinguishers replace with new of following extinguishers. (c) 10 Kg DCP extinguisher
118046 Extinguishers Replacement of following hoses with new at various places (d) Fire hoses , Fire hoses length 15 mts Dia 63 mm with end coupling of AL046 Extinguishers Replacement of following hoses with new at various places (d) Fire hoses , Fire hoses length 15 mts Dia 63 mm with end coupling of AL
119047 Foam solution Filling of Type 3% AFFF concentrate for forming mechanical foam for foam tank047 Foam solution Filling of Type 3% AFFF concentrate for forming mechanical foam for foam tank
12048 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments NOTE;- Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (a) Application of Underlay as per NCD 371748 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments NOTE;- Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (a) Application of Underlay as per NCD 3717
121048 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments NOTE;- Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (b) Application of sealer coat and top coat on entire area As Per NCD 3717.048 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments NOTE;- Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (b) Application of sealer coat and top coat on entire area As Per NCD 3717.
122049 Lifebuoy Lifebuoys to be painted as per sample including lettering and symbols.049 Lifebuoy Lifebuoys to be painted as per sample including lettering and symbols.
123050Lifer raft securing Stand Securing stand of Life rafts perished and damaged. To be renewed.050Lifer raft securing Stand Securing stand of Life rafts perished and damaged. To be renewed.
124050Lifer raft securing Stand Life rafts are to be secured with rubber lining at securing stand, including fitment of HRG.050Lifer raft securing Stand Life rafts are to be secured with rubber lining at securing stand, including fitment of HRG.
125051 Name board Tug name board perished/damaged , to be renewed (a) Vessel illuminating board-01,051 Name board Tug name board perished/damaged , to be renewed (a) Vessel illuminating board-01,
126051 Name board (b) Tug name board (Wooden) damaged, to be renewed including wooden pad. and letters (SS) are to be electroplated.051 Name board (b) Tug name board (Wooden) damaged, to be renewed including wooden pad. and letters (SS) are to be electroplated.
127051 Name board (c) Electroplating of Tug name board tallies (Brass) letters to be carried out.051 Name board (c) Electroplating of Tug name board tallies (Brass) letters to be carried out.
128051 Name board (c) Word letter of tug name (BC DUTT) on bulwark perished at fwd and stern , to be renewed, tug name is to be painted with fluorescent paint.051 Name board (c) Word letter of tug name (BC DUTT) on bulwark perished at fwd and stern , to be renewed, tug name is to be painted with fluorescent paint.
129052 Door locks Mortise lock of non wt door defective at various locations , All defective mortise locks to be renewed.052 Door locks Mortise lock of non wt door defective at various locations , All defective mortise locks to be renewed.
130053 Locking arrangement Locking arrangement is to be provided in all the wt doors at various locations including hasp and staple arrangement053 Locking arrangement Locking arrangement is to be provided in all the wt doors at various locations including hasp and staple arrangement
131054 Sunmica Deck head Sunmica damaged at various locations , to be renewed054 Sunmica Deck head Sunmica damaged at various locations , to be renewed
132055 MFMB lagging Degutting/regutting of MFMB lagging at accommodation area, wheel house to be carried out. quoted cost should including services and new material055 MFMB lagging Degutting/regutting of MFMB lagging at accommodation area, wheel house to be carried out. quoted cost should including services and new material
133056 PIPE LINES Chemical cleaning of soil and fresh water pipe lines at various places056 PIPE LINES Chemical cleaning of soil and fresh water pipe lines at various places
134057 Sanitary system WC of crew and master cabin corroded/thinned/holed to be renewed including base plate repairs (a) .WC commode along with suitable arrangement (Flush tank, piping, valves etc.) to be replaced with new Note:- Quoted repair cost shall include cost all items.057 Sanitary system WC of crew and master cabin corroded/thinned/holed to be renewed including base plate repairs (a) .WC commode along with suitable arrangement (Flush tank, piping, valves etc.) to be replaced with new Note:- Quoted repair cost shall include cost all items.
135057 Sanitary system Wash basin including drain pipes of crew and master cabin corroded/thinned/holed to be renewed (b) Wash basin including drain pipes Note:- Quoted repair cost shall include cost all items.057 Sanitary system Wash basin including drain pipes of crew and master cabin corroded/thinned/holed to be renewed (b) Wash basin including drain pipes Note:- Quoted repair cost shall include cost all items.
136057 Sanitary system (c)SS tap: 1/2 inch damaged to be renewed. Note:- Quoted repair cost shall include cost all items.057 Sanitary system (c)SS tap: 1/2 inch damaged to be renewed. Note:- Quoted repair cost shall include cost all items.
137057 Sanitary system (d).Supply pipes deformed to be renewed. Mat : Cu-Ni, Note:- Quoted repair cost shall include cost all items057 Sanitary system (d).Supply pipes deformed to be renewed. Mat : Cu-Ni, Note:- Quoted repair cost shall include cost all items
138057 Sanitary system (e) Drain pipe: Mat-MS,dia- 2 inch to be renewed. Note:- Quoted repair cost shall include cost all items057 Sanitary system (e) Drain pipe: Mat-MS,dia- 2 inch to be renewed. Note:- Quoted repair cost shall include cost all items
139057 Sanitary system (f) Water faucet set for toilet to be replaced with new057 Sanitary system (f) Water faucet set for toilet to be replaced with new
140057 Sanitary system (g) Mirror as per sample to be renewed. Note:- Quoted repair cost shall include cost all items057 Sanitary system (g) Mirror as per sample to be renewed. Note:- Quoted repair cost shall include cost all items
141057 Sanitary system (h) SS stop cock 1’’ damaged to be renewed. Note:- Quoted repair cost shall include cost all items057 Sanitary system (h) SS stop cock 1’’ damaged to be renewed. Note:- Quoted repair cost shall include cost all items
142057 Sanitary system (j) Fwd pipe lines corroded/thinned/holed to be renewed. (Dia. 2 inch) (Mat - CuNi) Note:- Quoted repair cost shall include cost all items057 Sanitary system (j) Fwd pipe lines corroded/thinned/holed to be renewed. (Dia. 2 inch) (Mat - CuNi) Note:- Quoted repair cost shall include cost all items
143057 Sanitary system (k) Shower head in bathrooms damaged i to be renewed. Note:- Quoted repair cost shall include cost all items057 Sanitary system (k) Shower head in bathrooms damaged i to be renewed. Note:- Quoted repair cost shall include cost all items
144058 Panelling Panelling in living spaces/wheel house and other areas , damaged at various locations , to be renewed as indicated by SS/ RMT (Mat-Wood)058 Panelling Panelling in living spaces/wheel house and other areas , damaged at various locations , to be renewed as indicated by SS/ RMT (Mat-Wood)
145059 Kit Lockers Kit lockers in crew cabin and master cabin damaged to be renewed, (mat-CRCA)059 Kit Lockers Kit lockers in crew cabin and master cabin damaged to be renewed, (mat-CRCA)
146060 Fisherman Plate Corroded/Thin/holed , to be renewed Mat-MS (a) Fish plate size: 20x20 inch, 10mm thickness060 Fisherman Plate Corroded/Thin/holed , to be renewed Mat-MS (a) Fish plate size: 20x20 inch, 10mm thickness
147060 Fisherman Plate Corroded/Thin/holed , to be repaired Mat-MS (b) Doubler plate size:28x28inch, 10 mm thickness060 Fisherman Plate Corroded/Thin/holed , to be repaired Mat-MS (b) Doubler plate size:28x28inch, 10 mm thickness
148060 Fisherman Plate Corroded/Thin/holed , to be renewed Mat-MS (c) Angle bar 3 x1.5 inch060 Fisherman Plate Corroded/Thin/holed , to be renewed Mat-MS (c) Angle bar 3 x1.5 inch
149061 Butterfly nut SS butterfly nuts and tumbler bolt of engine room sky light &exhaust flaps broken. To be renewed. Dia of bolt : 20 mm & 6 inch length (Mat-SS) including rubber beading . Rmt-4 rmt061 Butterfly nut SS butterfly nuts and tumbler bolt of engine room sky light &exhaust flaps broken. To be renewed. Dia of bolt : 20 mm & 6 inch length (Mat-SS) including rubber beading . Rmt-4 rmt
150062 Guard rail Guard rails on 01 & 02 deck (Port side) corroded/perished . To be renewed. (Mat-GI Pipe) Dia of guard rail pipe:1 ¾’’,062 Guard rail Guard rails on 01 & 02 deck (Port side) corroded/perished . To be renewed. (Mat-GI Pipe) Dia of guard rail pipe:1 ¾’’,
151063 Guard rail Securing chain Guard rails securing chain on 01 & 02 deck (Port side) corroded/perished . To be renewed. mat-GI063 Guard rail Securing chain Guard rails securing chain on 01 & 02 deck (Port side) corroded/perished . To be renewed. mat-GI
152064 Non WT door Non water tight door of bridge and living spaces damaged including frames, to be renewed.064 Non WT door Non water tight door of bridge and living spaces damaged including frames, to be renewed.
153065 Ventilation Vent pipes including head of various tanks on upper deck corroded and thinned, to be renewed. (Mat. GI pipe).065 Ventilation Vent pipes including head of various tanks on upper deck corroded and thinned, to be renewed. (Mat. GI pipe).
154066 Ventilation Wire mesh of all air vent corroded/perished. To be renewed.066 Ventilation Wire mesh of all air vent corroded/perished. To be renewed.
155067 Bulwark doors Bulwarks doors on weather deck jammed /dented/damaged. To be renewed067 Bulwark doors Bulwarks doors on weather deck jammed /dented/damaged. To be renewed
156068 Cleats MS cleats on (P & S) bulwark damaged, to be renewed including doubler plate . Size 28 MM068 Cleats MS cleats on (P & S) bulwark damaged, to be renewed including doubler plate . Size 28 MM
157069 Boxes (a) Fire hoses securing boxes and its glass damaged at various locations , to be renewed. As per navy standard069 Boxes (a) Fire hoses securing boxes and its glass damaged at various locations , to be renewed. As per navy standard
158069 Boxes (b) Boxes of various control panel corroded/thinned/holed at various locations, to be renewed as per existing as fitted sample. (Mat-MS)069 Boxes (b) Boxes of various control panel corroded/thinned/holed at various locations, to be renewed as per existing as fitted sample. (Mat-MS)
159070 Wooden cup board Wooden lockers damaged at various locations to be renewed. Job including renewal of lockers and hands.070 Wooden cup board Wooden lockers damaged at various locations to be renewed. Job including renewal of lockers and hands.
160071 Sofa Sofa cushion torned in ED ,Master and crew rest room , Sofa to be renewed.071 Sofa Sofa cushion torned in ED ,Master and crew rest room , Sofa to be renewed.
161072 Panelling SS panelling at indicated locations damaged to be renewed.072 Panelling SS panelling at indicated locations damaged to be renewed.
162073 Water Purifier Firm to supply and install new water purifier (RO+UF+TDS, Storage Cap 8 Ltrs) . additionally firm to supply 02 sets of following Spares :- (a) RO Membrane Welded , (b) RO Membrane High Flow(c) Inline Carbon filter ,(d) Inline Sediment Filter-(e) Activated Carbon Filter (Excel Elite) , (f) Post Carbon Filter073 Water Purifier Firm to supply and install new water purifier (RO+UF+TDS, Storage Cap 8 Ltrs) . additionally firm to supply 02 sets of following Spares :- (a) RO Membrane Welded , (b) RO Membrane High Flow(c) Inline Carbon filter ,(d) Inline Sediment Filter-(e) Activated Carbon Filter (Excel Elite) , (f) Post Carbon Filter
163074 Water Cooler Firm to replace with a new water cooler in crew dining hall. Water storage Cooler cum water purifier (RO/UV), Water Storage capacity 30 Ltrs. Firm to consider all cost w.r.t. to fitment of water cooler and prove for optimum performance. Details of Water Cooler:- Minimum three stage purification 1st stage of purification:- Sediment Filtration , 2nd Stage of Purification:- Carbon Filtration, 3rd Stage of Purification:- UV Filtration, Body Material :- Stainless Steel, Storage tank material:- SS 304,Thermal Insulation for storage tanks:- PUF , No of water Faucets:- 02, Make:- Aqua guard/Voltas/Blue Star. Firm to provide 02 Sets of all filters.074 Water Cooler Firm to replace with a new water cooler in crew dining hall. Water storage Cooler cum water purifier (RO/UV), Water Storage capacity 30 Ltrs. Firm to consider all cost w.r.t. to fitment of water cooler and prove for optimum performance. Details of Water Cooler:- Minimum three stage purification 1st stage of purification:- Sediment Filtration , 2nd Stage of Purification:- Carbon Filtration, 3rd Stage of Purification:- UV Filtration, Body Material :- Stainless Steel, Storage tank material:- SS 304,Thermal Insulation for storage tanks:- PUF , No of water Faucets:- 02, Make:- Aqua guard/Voltas/Blue Star. Firm to provide 02 Sets of all filters.
164075 Fixed H2s Sensor Firm to undertake Calibration/Serviceability checks of Fixed H2S sensors in the vicinity of STP compartment. (OEM - Hi-Point Services Pvt. Ltd.). Note:- H2S sensors Firm to undertake Calibration/Serviceability checks certificate by OEM to be submitted.075 Fixed H2s Sensor Firm to undertake Calibration/Serviceability checks of Fixed H2S sensors in the vicinity of STP compartment. (OEM - Hi-Point Services Pvt. Ltd.). Note:- H2S sensors Firm to undertake Calibration/Serviceability checks certificate by OEM to be submitted.
165076 Portable H2S Sensors. replace with new of Portable H2S sensors . (OEM - Hi-Point Services Pvt. Ltd.) Note:- Trial report along with H2S sensors Firm to undertake Calibration/Serviceability checks certificate by OEM to be submitted.076 Portable H2S Sensors. replace with new of Portable H2S sensors . (OEM - Hi-Point Services Pvt. Ltd.) Note:- Trial report along with H2S sensors Firm to undertake Calibration/Serviceability checks certificate by OEM to be submitted.
166077 Bunk Bunk in crew rest room / master room damaged to be repaired. MAT-CRCA077 Bunk Bunk in crew rest room / master room damaged to be repaired. MAT-CRCA
167078 Wooden Panelling Panelling in living spaces/wheel house and other areas , damaged at various locations , to be renewed. Mat Sunmica078 Wooden Panelling Panelling in living spaces/wheel house and other areas , damaged at various locations , to be renewed. Mat Sunmica
168079 Seating arrangement Metallic seating arrangement on foxle corroded, thinned and holed. Seating arrangement to provisioned. Size: 1500x750x700MM. Mat: MS Plate: 06MM thickness, Stand made of Angles and welded on deck.079 Seating arrangement Metallic seating arrangement on foxle corroded, thinned and holed. Seating arrangement to provisioned. Size: 1500x750x700MM. Mat: MS Plate: 06MM thickness, Stand made of Angles and welded on deck.
169080Mattress Mattress to be replaced with new mattress for crew cabin as per sample.080Mattress Mattress to be replaced with new mattress for crew cabin as per sample.
170081 Awning Repair of damaged awning shade frame at Foxle of GI pipes and fitment of the same on fwd. a) Size: 2m x 5.5 m Approx. Mat: GI pipe081 Awning Repair of damaged awning shade frame at Foxle of GI pipes and fitment of the same on fwd. a) Size: 2m x 5.5 m Approx. Mat: GI pipe
171081 Awning Repair of damaged awning shade frame at aft side of GI pipes and fitment of the same on fwd. and aft on weather deck area. (b) SIZE - 6 X 3 M Approx.081 Awning Repair of damaged awning shade frame at aft side of GI pipes and fitment of the same on fwd. and aft on weather deck area. (b) SIZE - 6 X 3 M Approx.
172081 PVC Awning PVC Awning at Foxle and at aft side (c) Renewal of PVC awning/Roofing sheet over the frame using Nut Bolt. Mat - PVC. Size - 3mm thickness081 PVC Awning PVC Awning at Foxle and at aft side (c) Renewal of PVC awning/Roofing sheet over the frame using Nut Bolt. Mat - PVC. Size - 3mm thickness
173081 Awning Repair of damaged awning shade frame at aft side of GI pipes and fitment of the same on fwd. and aft on weather deck area. (b) SIZE - 6 X 3 M Approx.081 Awning Repair of damaged awning shade frame at aft side of GI pipes and fitment of the same on fwd. and aft on weather deck area. (b) SIZE - 6 X 3 M Approx.
174081 PVC Awning PVC Awning at Foxle and at aft side (c) Firm to supply new awning and fitment of PVC awning over the frame using securing rope. Mat - As per sample.081 PVC Awning PVC Awning at Foxle and at aft side (c) Firm to supply new awning and fitment of PVC awning over the frame using securing rope. Mat - As per sample.
175082 Life Saving Appliance (a) Firm to supply new stretcher (Neil Robertson Stretcher).082 Life Saving Appliance (a) Firm to supply new stretcher (Neil Robertson Stretcher).
176082 Life Saving Appliance (b) Firm to replace with new life raft securing arrangement (polyester webbing with SS slip) including Hydrostatic release Unit (HRU Hammer H20 R), eye on deck.082 Life Saving Appliance (b) Firm to replace with new life raft securing arrangement (polyester webbing with SS slip) including Hydrostatic release Unit (HRU Hammer H20 R), eye on deck.
177082 Life Saving Appliance (c) Firm to new life buoy (Tug Name to be indicated)082 Life Saving Appliance (c) Firm to new life buoy (Tug Name to be indicated)
178082 Life Saving Appliance (d) Firm to replace with new life buoy with MOB light & smoke signal with securing bracket082 Life Saving Appliance (d) Firm to replace with new life buoy with MOB light & smoke signal with securing bracket
179082 Life Saving Appliance (e) Firm to replace with new life jacket made as per SOLAS/IRS/MMD standard (with ISO Certificate). Jacket to be fitted with three buckle with adjustable belt whistle attached with a lynyard reflective tape 04 nos082 Life Saving Appliance (e) Firm to replace with new life jacket made as per SOLAS/IRS/MMD standard (with ISO Certificate). Jacket to be fitted with three buckle with adjustable belt whistle attached with a lynyard reflective tape 04 nos
180083 Misc (a) Firm to replace with new Polyester Webbing Slings Capacity 5 Tons, Length 6.5 Mtrs083 Misc (a) Firm to replace with new Polyester Webbing Slings Capacity 5 Tons, Length 6.5 Mtrs
181083 Misc (b) Firm to replace with new Self Adhesive Photo luminescent stickers IMO Symbols & Safety Sign/Escape Route Sign. (150 mm x 150mm) . Firm to provide stickers as per sample083 Misc (b) Firm to replace with new Self Adhesive Photo luminescent stickers IMO Symbols & Safety Sign/Escape Route Sign. (150 mm x 150mm) . Firm to provide stickers as per sample
182083 Misc (c) Water stagnation at wheel house deck. Firm to provision proper drainage by ensuring a slight slope , installing deck level drainage using durable, rust resistant piping.083 Misc (c) Water stagnation at wheel house deck. Firm to provision proper drainage by ensuring a slight slope , installing deck level drainage using durable, rust resistant piping.
183Engineering1001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS, MODEL-SFGP-36,SL NO-300386, TYPE: ROTARY GEAR PUMP, Capacity : 06 CuM/hr, Firm to supply and replace with new spares/material required for renewal.Engineering1001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS, MODEL-SFGP-36,SL NO-300386, TYPE: ROTARY GEAR PUMP, Capacity : 06 CuM/hr, Firm to supply and replace with new spares/material required for renewal.
1841001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(a) Overhauling of Pump to be carried out. Pump to be dismantle completely and all parts to be inspected. Damaged & defective parts to be replaced with new spares. Post overhauling, pump to be proved for satisfactory operation. Vibration analysis of pump to be carried out and same to be recorded. Post successful trials of pump, trial report to be rendered.1001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(a) Overhauling of Pump to be carried out. Pump to be dismantle completely and all parts to be inspected. Damaged & defective parts to be replaced with new spares. Post overhauling, pump to be proved for satisfactory operation. Vibration analysis of pump to be carried out and same to be recorded. Post successful trials of pump, trial report to be rendered.
1851001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(b) Fitment and Alignment of pump with motor to be carried out. Misalignment to be corrected1001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(b) Fitment and Alignment of pump with motor to be carried out. Misalignment to be corrected
1861001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(c) Firm to supply & fitment of three jaw coupling to be carried out.1001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(c) Firm to supply & fitment of three jaw coupling to be carried out.
1871001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(d) Firm to provide coupling (as per sample) for pump1001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(d) Firm to provide coupling (as per sample) for pump
1881001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(e) Firm to supply and fitment of all foundation nut and bolts (M 16, Material -SS, length as per sample ) to be carried out1001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(e) Firm to supply and fitment of all foundation nut and bolts (M 16, Material -SS, length as per sample ) to be carried out
1891001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(f) Firm to supply new spares and fitment of Suction pressure gauges to be carried out. Suction gauge Range -1 to 1.5 bar. The gauges should be glycerine filled.1001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(f) Firm to supply new spares and fitment of Suction pressure gauges to be carried out. Suction gauge Range -1 to 1.5 bar. The gauges should be glycerine filled.
1901001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(g) Firm to supply new spares and fitment of discharge pressure gauges to be carried out. discharge gauge range 0 to 10 bar. The gauges should be glycerine filled.1001EQPT : FUEL TRANSFER PUMPS MAKE : ROYSONS(g) Firm to supply new spares and fitment of discharge pressure gauges to be carried out. discharge gauge range 0 to 10 bar. The gauges should be glycerine filled.
1911002EQPT : GENERAL SERVICE PUMP, Capacity: 35 m3/hr. Firm to supply and replace with new spares/material required for renewal.1002EQPT : GENERAL SERVICE PUMP, Capacity: 35 m3/hr. Firm to supply and replace with new spares/material required for renewal.
1921002EQPT :GENERAL SERVICE PUMP(a) Firm to supply new pumps. Pump to be fitted at place and prove for satisfactory operation. . Make BE/Johnson/ SPX, Capacity: 35 m3/hr. Post successful trials of pump, trial report to be rendered.1002EQPT :GENERAL SERVICE PUMP(a) Firm to supply new pumps. Pump to be fitted at place and prove for satisfactory operation. . Make BE/Johnson/ SPX, Capacity: 35 m3/hr. Post successful trials of pump, trial report to be rendered.
1931002EQPT :GENERAL SERVICE PUMP(b)Fitment and Alignment of pump with motor to be carried out. Misalignment to be corrected1002EQPT :GENERAL SERVICE PUMP(b)Fitment and Alignment of pump with motor to be carried out. Misalignment to be corrected
1941002EQPT :GENERAL SERVICE PUMP(c) Fitment of three jaw coupling to be carried out.1002EQPT :GENERAL SERVICE PUMP(c) Fitment of three jaw coupling to be carried out.
1951002EQPT :GENERAL SERVICE PUMP(d) Firm to provide new mechanical seal for pump (as per sample)1002EQPT :GENERAL SERVICE PUMP(d) Firm to provide new mechanical seal for pump (as per sample)
1961002EQPT :GENERAL SERVICE PUMP(e) Firm to provide coupling (as per sample) for pump1002EQPT :GENERAL SERVICE PUMP(e) Firm to provide coupling (as per sample) for pump
1971002EQPT :GENERAL SERVICE PUMP(f) Firm to supply new spares and fitment of foundation nut and bolts (M 16, Material -SS) to be carried out1002EQPT :GENERAL SERVICE PUMP(f) Firm to supply new spares and fitment of foundation nut and bolts (M 16, Material -SS) to be carried out
1981002EQPT :GENERAL SERVICE PUMP(g) Firm to supply new spares and fitment of Suction gauges to be carried out .Suction gauge Range -1 to1. 5 bar . The gauges should be glycerine filled.1002EQPT :GENERAL SERVICE PUMP(g) Firm to supply new spares and fitment of Suction gauges to be carried out .Suction gauge Range -1 to1. 5 bar . The gauges should be glycerine filled.
1991002EQPT :GENERAL SERVICE PUMP(h) Firm to supply new spares and fitment of discharge pressure gauges to be carried out. discharge gauge range 0 to 10 bar. The gauges should be glycerine filled.1002EQPT :GENERAL SERVICE PUMP(h) Firm to supply new spares and fitment of discharge pressure gauges to be carried out. discharge gauge range 0 to 10 bar. The gauges should be glycerine filled.
2001002EQPT :GENERAL SERVICE PUMP(j) Firm to supply new spares and fitment of Instrumentation gauges pipes (RMT- 02 mts) with suitable end fittings to be carried out1002EQPT :GENERAL SERVICE PUMP(j) Firm to supply new spares and fitment of Instrumentation gauges pipes (RMT- 02 mts) with suitable end fittings to be carried out
2011002EQPT :GENERAL SERVICE PUMP(k) Firm to supply new spares and fitment of isolating cock to be carried out. Mat: CuNi, Dia:1/4 inch.1002EQPT :GENERAL SERVICE PUMP(k) Firm to supply new spares and fitment of isolating cock to be carried out. Mat: CuNi, Dia:1/4 inch.
2021002EQPT :GENERAL SERVICE PUMP(m) Firm to supply new spares and fitment of durettes (Dia-80mm) length - 30cm to be carried out1002EQPT :GENERAL SERVICE PUMP(m) Firm to supply new spares and fitment of durettes (Dia-80mm) length - 30cm to be carried out
2031002EQPT :GENERAL SERVICE PUMP(n) Pump Bed to be repaired and cleaning & painting to be carried out1002EQPT :GENERAL SERVICE PUMP(n) Pump Bed to be repaired and cleaning & painting to be carried out
2041002EQPT :GENERAL SERVICE PUMP(p) Casing, shaft and impeller to be chemically cleaned and checked for pitting. , followed by surface finishing1002EQPT :GENERAL SERVICE PUMP(p) Casing, shaft and impeller to be chemically cleaned and checked for pitting. , followed by surface finishing
2051002EQPT :GENERAL SERVICE PUMP(q) Firm to supply new spares and fitment of purging cocks and adaptors to be carried out1002EQPT :GENERAL SERVICE PUMP(q) Firm to supply new spares and fitment of purging cocks and adaptors to be carried out
2061002EQPT :GENERAL SERVICE PUMP(r) Firm to supply new spares and fitment of flexible hose pipes wire braded 1/2 inch, length 1/2 mts to be carried out1002EQPT :GENERAL SERVICE PUMP(r) Firm to supply new spares and fitment of flexible hose pipes wire braded 1/2 inch, length 1/2 mts to be carried out
2071003EQPT/SYSTEM: FRESH WATER PUMPS, MAKE: BE PUMPS, MODEL- A03110K/MS-3/DGS-2/316, TYPE: SINGLE STAGE, SELF PRIMING, CENTRIFUGAL CAP: 2cu.m/hr, FIRM NOT TO QUOTE1003EQPT/SYSTEM: FRESH WATER PUMPS, MAKE: BE PUMPS, MODEL- A03110K/MS-3/DGS-2/316, TYPE: SINGLE STAGE, SELF PRIMING, CENTRIFUGAL CAP: 2cu.m/hr, FIRM NOT TO QUOTE
2081003EQPT/SYSTEM: FRESH WATER PUMPS(a) Overhauling of Pump to be carried out. Pump to be dismantle completely and all parts to be inspected. Damaged & defective parts to be replaced with new spares. Post overhauling, pump to be proved for satisfactory operation. Vibration analysis of pump to be carried out and same to be recorded. Post successful trials of pump, trial report to be rendered.1003EQPT/SYSTEM: FRESH WATER PUMPS(a) Overhauling of Pump to be carried out. Pump to be dismantle completely and all parts to be inspected. Damaged & defective parts to be replaced with new spares. Post overhauling, pump to be proved for satisfactory operation. Vibration analysis of pump to be carried out and same to be recorded. Post successful trials of pump, trial report to be rendered.
2091003EQPT/SYSTEM: FRESH WATER PUMPS(b) Fitment and Alignment of pump with motor to be carried out. Misalignment to be corrected1003EQPT/SYSTEM: FRESH WATER PUMPS(b) Fitment and Alignment of pump with motor to be carried out. Misalignment to be corrected
2101003EQPT/SYSTEM: FRESH WATER PUMPS(c) Fitment of shaft coupling to be carried out. Firm to provide coupling for drive shaft (as per sample) for pump1003EQPT/SYSTEM: FRESH WATER PUMPS(c) Fitment of shaft coupling to be carried out. Firm to provide coupling for drive shaft (as per sample) for pump
2111003EQPT/SYSTEM: FRESH WATER PUMPS(d) Firm to supply and fitment of all foundation nut and bolts ( M 16, Material -SS) to be carried out1003EQPT/SYSTEM: FRESH WATER PUMPS(d) Firm to supply and fitment of all foundation nut and bolts ( M 16, Material -SS) to be carried out
2121003EQPT/SYSTEM: FRESH WATER PUMPS(e) Firm to supply new spares and fitment of Suction pressure gauges to be carried out. Suction gauge Range -1 to 1.5 bar. The gauges should be glycerine filled.1003EQPT/SYSTEM: FRESH WATER PUMPS(e) Firm to supply new spares and fitment of Suction pressure gauges to be carried out. Suction gauge Range -1 to 1.5 bar. The gauges should be glycerine filled.
2131003EQPT/SYSTEM: FRESH WATER PUMPS(f) Firm to supply new spares and fitment of discharge pressure gauges to be carried out. discharge gauge range 0 to 10 bar. The gauges should be glycerine filled.1003EQPT/SYSTEM: FRESH WATER PUMPS(f) Firm to supply new spares and fitment of discharge pressure gauges to be carried out. discharge gauge range 0 to 10 bar. The gauges should be glycerine filled.
2141003EQPT/SYSTEM: FRESH WATER PUMPS(g) Firm to supply new spares and fitment of Instrumentation gauges pipes (RMT- 02 mts) with suitable end fittings to be carried out1003EQPT/SYSTEM: FRESH WATER PUMPS(g) Firm to supply new spares and fitment of Instrumentation gauges pipes (RMT- 02 mts) with suitable end fittings to be carried out
2151003EQPT/SYSTEM: FRESH WATER PUMPS(h) Firm to supply and fitment of isolating cock to be carried out. Mat: CuNi, Dia:1/4 inch.1003EQPT/SYSTEM: FRESH WATER PUMPS(h) Firm to supply and fitment of isolating cock to be carried out. Mat: CuNi, Dia:1/4 inch.
2161004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP, MAKE : BE PUMPS , Model A5110KK-DGS2-316, TYPE: SINGLE STAGE ,SELF PRIMING,CENTRIFUGAL , CAP : 15 M3/hr.1004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP, MAKE : BE PUMPS , Model A5110KK-DGS2-316, TYPE: SINGLE STAGE ,SELF PRIMING,CENTRIFUGAL , CAP : 15 M3/hr.
2171004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(a) Overhauling of Pump to be carried out. Pump to be dismantle completely and all parts to be inspected. Damaged & defective parts to be replaced with new spares. Post overhauling, pump to be proved for satisfactory operation. Vibration analysis of pump to be carried out and same to be recorded. Pump bed to be cleaned and painting to be done. Post fitment and Alignment of pump with motor. Post successful trials of pump, trial report to be rendered.1004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(a) Overhauling of Pump to be carried out. Pump to be dismantle completely and all parts to be inspected. Damaged & defective parts to be replaced with new spares. Post overhauling, pump to be proved for satisfactory operation. Vibration analysis of pump to be carried out and same to be recorded. Pump bed to be cleaned and painting to be done. Post fitment and Alignment of pump with motor. Post successful trials of pump, trial report to be rendered.
2181004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP, MAKE : BE PUMPS , Model A5110KK-DGS2-316, TYPE: SINGLE STAGE ,SELF PRIMING,CENTRIFUGAL , CAP : 15 M3/hr.(b) Firm to replace with new sea water pump for SRP system cooling and prove for satisfactory performance. Job includes supply of BE pump or other make with equivalent capacity. Fabrication of foundation frame as suitable to Fitment of pump at place along with motor. Post fitment alignment of Pump-Motor to be undertaken. Prove pump for satisfactory performance.1004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP, MAKE : BE PUMPS , Model A5110KK-DGS2-316, TYPE: SINGLE STAGE ,SELF PRIMING,CENTRIFUGAL , CAP : 15 M3/hr.(b) Firm to replace with new sea water pump for SRP system cooling and prove for satisfactory performance. Job includes supply of BE pump or other make with equivalent capacity. Fabrication of foundation frame as suitable to Fitment of pump at place along with motor. Post fitment alignment of Pump-Motor to be undertaken. Prove pump for satisfactory performance.
2191004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(c) Firm to supply new spares and fitment of spider jaw coupling to be carried out.1004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(c) Firm to supply new spares and fitment of spider jaw coupling to be carried out.
2201004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(d) Firm to provide additional new spare couplings.1004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(d) Firm to provide additional new spare couplings.
2211004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(e) Firm to supply new spares and fitment of all foundation nut and bolts ( M16, Material -SS) to be carried out1004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(e) Firm to supply new spares and fitment of all foundation nut and bolts ( M16, Material -SS) to be carried out
2221004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(f) Firm to supply new spares and fitment of Suction pressure gauges to be carried out. Suction gauge Range -1 to 1.5 bar. The gauges should be glycerine filled.1004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(f) Firm to supply new spares and fitment of Suction pressure gauges to be carried out. Suction gauge Range -1 to 1.5 bar. The gauges should be glycerine filled.
2231004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(g) Firm to supply new spares and fitment of discharge pressure gauges to be carried out. discharge gauge range 0 to 10 bar. The gauges should be glycerine filled.1004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(g) Firm to supply new spares and fitment of discharge pressure gauges to be carried out. discharge gauge range 0 to 10 bar. The gauges should be glycerine filled.
2241003EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(h) Firm to supply new spares and fitment of Instrumentation gauges pipes (RMT- 02 mts) with suitable end fittings to be carried out1003EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(h) Firm to supply new spares and fitment of Instrumentation gauges pipes (RMT- 02 mts) with suitable end fittings to be carried out
2251003EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(j) Firm to supply new spares and fitment of isolating cock to be carried out. Mat: CuNi, Dia:1/4 inch. To be carried out1003EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(j) Firm to supply new spares and fitment of isolating cock to be carried out. Mat: CuNi, Dia:1/4 inch. To be carried out
2261004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(k) Firm to supply new spares and fitment of durets-02 no. (Dia-60mm) length - 30cm to be carried out1004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(k) Firm to supply new spares and fitment of durets-02 no. (Dia-60mm) length - 30cm to be carried out
2271004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(m) Casing to be chemically cleaned and checked for pitting. , followed by surface finishing1004EQPT/SYSTEM: SRP COOLING SEA WATER PUMP(m) Casing to be chemically cleaned and checked for pitting. , followed by surface finishing
2281005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS MAKE: BE PUMPS, MODEL- M2022kk/RR-DGS2-316 TYPE: TWO STAGE,CENTRIFUGAL PUMP, CAP: 300CuM/hr,1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS MAKE: BE PUMPS, MODEL- M2022kk/RR-DGS2-316 TYPE: TWO STAGE,CENTRIFUGAL PUMP, CAP: 300CuM/hr,
2291005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (a) Overhauling of Pump to be carried out. Pump to be dismantle completely and all parts to be inspected. Damaged & defective parts to be replaced with new spares. Post overhauling, pump to be proved for satisfactory operation. Vibration analysis of pump to be carried out and same to be recorded. Post successful trials of pump, trial report to be rendered.1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (a) Overhauling of Pump to be carried out. Pump to be dismantle completely and all parts to be inspected. Damaged & defective parts to be replaced with new spares. Post overhauling, pump to be proved for satisfactory operation. Vibration analysis of pump to be carried out and same to be recorded. Post successful trials of pump, trial report to be rendered.
2301005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (b) Casing to be chemically cleaned and checked for pitting. , followed by surface finishing1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (b) Casing to be chemically cleaned and checked for pitting. , followed by surface finishing
2311005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (c) Firm to supply new spares and fitment of Suction pressure gauges to be carried. Suction gauge Range -1 to 1.5 bar . The gauges should be glycerine filled.1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (c) Firm to supply new spares and fitment of Suction pressure gauges to be carried. Suction gauge Range -1 to 1.5 bar . The gauges should be glycerine filled.
2321005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (d) Firm to supply new spares and fitment of discharge pressure gauges to be carried. discharge gauge range 0 to 10 bar. The gauges should be glycerine filled.1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (d) Firm to supply new spares and fitment of discharge pressure gauges to be carried. discharge gauge range 0 to 10 bar. The gauges should be glycerine filled.
2331005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (e) Firm to supply new spares and fitment of all gasket and o' rings to be carried out1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (e) Firm to supply new spares and fitment of all gasket and o' rings to be carried out
2341005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (f) Firm to supply new spares and fitment of Instrumentation gauges pipes (RMT- 02 mts) with suitable end fittings to be carried out1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (f) Firm to supply new spares and fitment of Instrumentation gauges pipes (RMT- 02 mts) with suitable end fittings to be carried out
2351005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (g) Firm to supply new spares and fitment of isolating cock to be carried out1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (g) Firm to supply new spares and fitment of isolating cock to be carried out
2361005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (h) Firm to supply new spares and fitment of end bearings to be carried out1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (h) Firm to supply new spares and fitment of end bearings to be carried out
2371005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (j) Firm to supply new spares and fitment of packing's to be carried out1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (j) Firm to supply new spares and fitment of packing's to be carried out
2381005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (k) Firm to supply new spares and fitment of purging cocks with funnel to be carried out1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (k) Firm to supply new spares and fitment of purging cocks with funnel to be carried out
2391005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (m) Cleaning and painting of pump with bed to be carried out1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (m) Cleaning and painting of pump with bed to be carried out
2401005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (n) Prove the pump for satisfactory performance1005 EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (n) Prove the pump for satisfactory performance
2411006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY Model: SL 214 P 101,1006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY Model: SL 214 P 101,
2421006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY(a) Check and inspect the clutch mechanism.1006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY(a) Check and inspect the clutch mechanism.
2431006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY(b) Firm to supply new coupling along with rubber bellow bushes.1006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY(b) Firm to supply new coupling along with rubber bellow bushes.
2441006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY(c) overhauling of clutch-in & declutch mechanism to be carried out.1006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY(c) overhauling of clutch-in & declutch mechanism to be carried out.
2451006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY(d) Carry out alignment of pump with power take off assembly & engine.1006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY(d) Carry out alignment of pump with power take off assembly & engine.
2461006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY(e) Pump to be proved for satisfactory performance post work completion.1006ENGINE DRIVEN FIRE PUMP POWER TAKE OFF ASSEMBLY(e) Pump to be proved for satisfactory performance post work completion.
2471007EQPT : DD COMPRESSOR ENGINE, MAKE : GREAVES , MODEL - 1080, SL NO- A4A24423,POWER-6.1HP,RPM-3000, TYPE: SINGLE CYLINDER,1007EQPT : DD COMPRESSOR ENGINE, MAKE : GREAVES , MODEL - 1080, SL NO- A4A24423,POWER-6.1HP,RPM-3000, TYPE: SINGLE CYLINDER,
2481007EQPT : DD COMPRESSOR ENGINE(a) Sump to be drained, flushed through and refill new oil. (Oil Grade 15 W 40)1007EQPT : DD COMPRESSOR ENGINE(a) Sump to be drained, flushed through and refill new oil. (Oil Grade 15 W 40)
2491007EQPT : DD COMPRESSOR ENGINE(b) Valve tappet setting to be carried out.1007EQPT : DD COMPRESSOR ENGINE(b) Valve tappet setting to be carried out.
2501007EQPT : DD COMPRESSOR ENGINE(c ) Firm to supply oil filter element and fitment of oil filter element to be carried out.1007EQPT : DD COMPRESSOR ENGINE(c ) Firm to supply oil filter element and fitment of oil filter element to be carried out.
2511007EQPT : DD COMPRESSOR ENGINE(d) Remove/ cleaning of cylinder head and de carbonise piston and cylinder heads.1007EQPT : DD COMPRESSOR ENGINE(d) Remove/ cleaning of cylinder head and de carbonise piston and cylinder heads.
2521007EQPT : DD COMPRESSOR ENGINE(e )Chemical Cleaning of exhaust pipe and silencers to be carried out.1007EQPT : DD COMPRESSOR ENGINE(e )Chemical Cleaning of exhaust pipe and silencers to be carried out.
2531007EQPT : DD COMPRESSOR ENGINE(f) Firm to supply new spares and fitment of fuel filter element to be carried out.1007EQPT : DD COMPRESSOR ENGINE(f) Firm to supply new spares and fitment of fuel filter element to be carried out.
2541007EQPT : DD COMPRESSOR ENGINE(g) Firm to supply new spares and fitment of air intake filter to be carried out.1007EQPT : DD COMPRESSOR ENGINE(g) Firm to supply new spares and fitment of air intake filter to be carried out.
2551007EQPT : DD COMPRESSOR ENGINE(h) Chemical Cleaning and Firm to undertake Calibration/Serviceability checks of fuel injectors to be carried out. Firm to undertake Calibration/Serviceability checks reports to be rendered1007EQPT : DD COMPRESSOR ENGINE(h) Chemical Cleaning and Firm to undertake Calibration/Serviceability checks of fuel injectors to be carried out. Firm to undertake Calibration/Serviceability checks reports to be rendered
2561007EQPT : DD COMPRESSOR ENGINE(j) Firm to supply new spares and fitment of flexible pipes ,size - 1/4 inch to be carried out1007EQPT : DD COMPRESSOR ENGINE(j) Firm to supply new spares and fitment of flexible pipes ,size - 1/4 inch to be carried out
2571007EQPT : DD COMPRESSOR ENGINE(k) Firm to supply new spares and fitment of o'ring and gasket to be carried out.1007EQPT : DD COMPRESSOR ENGINE(k) Firm to supply new spares and fitment of o'ring and gasket to be carried out.
2581007EQPT : DD COMPRESSOR ENGINE(m) Provide new self starting arrangement for engine including belt and operating system .Prove smooth starting and stopping of engine.1007EQPT : DD COMPRESSOR ENGINE(m) Provide new self starting arrangement for engine including belt and operating system .Prove smooth starting and stopping of engine.
2591007EQPT : DD COMPRESSOR ENGINE(n) Bleed off air from fuel system and fuel filter to be carried out.1007EQPT : DD COMPRESSOR ENGINE(n) Bleed off air from fuel system and fuel filter to be carried out.
2601007EQPT : DD COMPRESSOR ENGINE(p) Prove engine along with compressor for satisfactory performance.1007EQPT : DD COMPRESSOR ENGINE(p) Prove engine along with compressor for satisfactory performance.
2611008EQPT: AIR COMPRESSOR , MAKEL: ELGI, MODEL- HP -05- 300, Cap-12.4m3/hr@30kg/cm2. TYPE: 2 STAGE RECIPROCATING TYPE, CAP: 200LPM,1008EQPT: AIR COMPRESSOR , MAKEL: ELGI, MODEL- HP -05- 300, Cap-12.4m3/hr@30kg/cm2. TYPE: 2 STAGE RECIPROCATING TYPE, CAP: 200LPM,
2621008EQPT: AIR COMPRESSOR(a) Firm to supply and fitment of V-Belts to be carried out.1008EQPT: AIR COMPRESSOR(a) Firm to supply and fitment of V-Belts to be carried out.
2631008EQPT: AIR COMPRESSOR(b) Firm to supply and fitment of gasket to be carried out.1008EQPT: AIR COMPRESSOR(b) Firm to supply and fitment of gasket to be carried out.
2641008EQPT: AIR COMPRESSOR(c ) Firm to supply and fitment of piston rigs to be carried out.1008EQPT: AIR COMPRESSOR(c ) Firm to supply and fitment of piston rigs to be carried out.
2651008EQPT: AIR COMPRESSOR(d) Firm to supply crankshaft assembly along with connecting rod and same to be replaced.1008EQPT: AIR COMPRESSOR(d) Firm to supply crankshaft assembly along with connecting rod and same to be replaced.
2661008EQPT: AIR COMPRESSOR(e ) Firm to supply new spares and fitment of pressure switch to be carried out.1008EQPT: AIR COMPRESSOR(e ) Firm to supply new spares and fitment of pressure switch to be carried out.
2671008EQPT: AIR COMPRESSOR(f) Firm to supply new spares and fitment of pressure relief valve to be carried out.1008EQPT: AIR COMPRESSOR(f) Firm to supply new spares and fitment of pressure relief valve to be carried out.
2681008EQPT: AIR COMPRESSOR(g) Firm to supply new Safety valve & same to replace. Prove for satisfactory performance.1008EQPT: AIR COMPRESSOR(g) Firm to supply new Safety valve & same to replace. Prove for satisfactory performance.
2691008EQPT: AIR COMPRESSOR(h) Firm to supply new spares and fitment of pressure gauge (0 - 50 bar) to be carried out1008EQPT: AIR COMPRESSOR(h) Firm to supply new spares and fitment of pressure gauge (0 - 50 bar) to be carried out
2701008EQPT: AIR COMPRESSOR(j) Firm to supply lub oil , Lub oil :- Elgi Reciprocating air Compressor Lube Oil1008EQPT: AIR COMPRESSOR(j) Firm to supply lub oil , Lub oil :- Elgi Reciprocating air Compressor Lube Oil
2711008EQPT: AIR COMPRESSOR(k) Foundation frame for compressor to be renewed. Fabrication of new channels to be done ( Thickness 6mm, length 4mtrs). Suitable Primer and paint to be applied.1008EQPT: AIR COMPRESSOR(k) Foundation frame for compressor to be renewed. Fabrication of new channels to be done ( Thickness 6mm, length 4mtrs). Suitable Primer and paint to be applied.
2721008EQPT: AIR COMPRESSOR(m) Air compressor to be cleaned completely. Post Cleaning, panting of whole body to be carried out. Firm to supply and renew lub oil sight glass1008EQPT: AIR COMPRESSOR(m) Air compressor to be cleaned completely. Post Cleaning, panting of whole body to be carried out. Firm to supply and renew lub oil sight glass
2731008EQPT: AIR COMPRESSOR(n) Overhauling of compressors to be carried out and Prove the Air compressor for satisfactory operational.1008EQPT: AIR COMPRESSOR(n) Overhauling of compressors to be carried out and Prove the Air compressor for satisfactory operational.
2741009EQPT: FUEL OIL PURIFIER , MAKE: ALFA LEVEL1009EQPT: FUEL OIL PURIFIER , MAKE: ALFA LEVEL
2751009EQPT: FUEL OIL PURIFIER , MAKEL: ALFA LEVEL (a) Over hauling of fuel oil purifier to be done. Job includes Cleaning of bowl and firm to be renew Gaskets, Bearings and Seals. Firm to replace all water hoses with new1009EQPT: FUEL OIL PURIFIER , MAKEL: ALFA LEVEL (a) Over hauling of fuel oil purifier to be done. Job includes Cleaning of bowl and firm to be renew Gaskets, Bearings and Seals. Firm to replace all water hoses with new
2761009EQPT: FUEL OIL PURIFIER , MAKEL: ALFA LEVEL(b) Over hauling of pump and firm to be renew Seals and bearings.1009EQPT: FUEL OIL PURIFIER , MAKEL: ALFA LEVEL(b) Over hauling of pump and firm to be renew Seals and bearings.
2771009EQPT: FUEL OIL PURIFIER , MAKEL: ALFA LEVEL(c ) Overhauling of water block assembly to be carried out.1009EQPT: FUEL OIL PURIFIER , MAKEL: ALFA LEVEL(c ) Overhauling of water block assembly to be carried out.
2781009EQPT: FUEL OIL PURIFIER , MAKEL: ALFA LEVEL(d) Firm to be replace pressure switch with new one.1009EQPT: FUEL OIL PURIFIER , MAKEL: ALFA LEVEL(d) Firm to be replace pressure switch with new one.
2791009EQPT: FUEL OIL PURIFIER , MAKEL: ALFA LEVEL(e) Prove the system for satisfactory performance.1009EQPT: FUEL OIL PURIFIER , MAKEL: ALFA LEVEL(e) Prove the system for satisfactory performance.
2801010EQPT/SYSTEM: STRAINERS Following system strainers to be manufactured as per sample, Strainer, 3 mm hole Dia, spaced 5 mm apart, with zig zag position of holes1010EQPT/SYSTEM: STRAINERS Following system strainers to be manufactured as per sample, Strainer, 3 mm hole Dia, spaced 5 mm apart, with zig zag position of holes
2811010EQPT/SYSTEM: STRAINERS (a) Manufacturing of Main supply manifold strainers Dia 300mm, Material:- Brass, thickness- 3 mm to be carried out1010EQPT/SYSTEM: STRAINERS (a) Manufacturing of Main supply manifold strainers Dia 300mm, Material:- Brass, thickness- 3 mm to be carried out
2821010EQPT/SYSTEM: STRAINERS (b) Manufacturing of Main engine cooling water strainers Dia 80mm, Mat: Brass, thick- 3 mm to be carried out1010EQPT/SYSTEM: STRAINERS (b) Manufacturing of Main engine cooling water strainers Dia 80mm, Mat: Brass, thick- 3 mm to be carried out
2831010EQPT/SYSTEM: STRAINERS (c) Manufacturing of E/D sea water pump main suction strainers Dia 200mm,Material:- Brass, thickness- 3 mm to be carried out1010EQPT/SYSTEM: STRAINERS (c) Manufacturing of E/D sea water pump main suction strainers Dia 200mm,Material:- Brass, thickness- 3 mm to be carried out
2841010EQPT/SYSTEM: STRAINERS (d) Manufacturing of Foam system inline strainer Dia 30 mm, Material:- Brass, thickness- 3 mm to be carried out1010EQPT/SYSTEM: STRAINERS (d) Manufacturing of Foam system inline strainer Dia 30 mm, Material:- Brass, thickness- 3 mm to be carried out
2851010EQPT/SYSTEM: STRAINERS (e) Manufacturing of Fresh water pump suction foot valve 32 mm, Material:- Brass, thickness- 2 mm to be carried out1010EQPT/SYSTEM: STRAINERS (e) Manufacturing of Fresh water pump suction foot valve 32 mm, Material:- Brass, thickness- 2 mm to be carried out
2861010EQPT/SYSTEM: STRAINERS (f) Manufacturing of SRP lub oil cooler sea water system inlet side strainer body to be replaced, including strainer, Body- Material -SS, Strainer material -Brass, Body dimension 12 cm Dia, ht- 16 cm, Strainer dimension - Dia 10 cm and ht 15 cm to be carried out1010EQPT/SYSTEM: STRAINERS (f) Manufacturing of SRP lub oil cooler sea water system inlet side strainer body to be replaced, including strainer, Body- Material -SS, Strainer material -Brass, Body dimension 12 cm Dia, ht- 16 cm, Strainer dimension - Dia 10 cm and ht 15 cm to be carried out
2871010EQPT/SYSTEM: STRAINERS (g) Firm to replace with new purging cocks for sea water strainers. Job includes removal of damaged purging cock and new Purging cocks to be fitted on top cover of sea chest strainer. Firm to provide suitable drain pipe from purging cock to engine room bilges. Prove for satisfactory operation.1010EQPT/SYSTEM: STRAINERS (g) Firm to replace with new purging cocks for sea water strainers. Job includes removal of damaged purging cock and new Purging cocks to be fitted on top cover of sea chest strainer. Firm to provide suitable drain pipe from purging cock to engine room bilges. Prove for satisfactory operation.
2881010EQPT/SYSTEM: STRAINERS (h) Manufacturing of 80 mm Line suction strainer to be carried out1010EQPT/SYSTEM: STRAINERS (h) Manufacturing of 80 mm Line suction strainer to be carried out
2891010EQPT/SYSTEM: STRAINERS (j) Manufacturing of 100mm Line suction strainer to be carried out1010EQPT/SYSTEM: STRAINERS (j) Manufacturing of 100mm Line suction strainer to be carried out
2901011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING Following system pipes to be removed, chemically cleaned , pressure tested ( 1.5 times of working pressure ). Firm to undertake necessary repair of defective system pipe line Post fitment of pipelines, Firm to paint all system pipe line as per colour code.1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING Following system pipes to be removed, chemically cleaned , pressure tested ( 1.5 times of working pressure ). Firm to undertake necessary repair of defective system pipe line Post fitment of pipelines, Firm to paint all system pipe line as per colour code.
2911011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING SEA WATER SYSTEM(a) Dia.- 200mm Sea water system pipe Mat: CuNi,1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING SEA WATER SYSTEM(a) Dia.- 200mm Sea water system pipe Mat: CuNi,
2921011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING SEA WATER SYSTEM(b) Dia.-80mm Pipe Sea water system pipe Mat: CuNi1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING SEA WATER SYSTEM(b) Dia.-80mm Pipe Sea water system pipe Mat: CuNi
2931011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING SEA WATER SYSTEM(c) Dia.-60mm Sea water system pipe Mat: GI1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING SEA WATER SYSTEM(c) Dia.-60mm Sea water system pipe Mat: GI
2941011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING SEA WATER SYSTEM(d) Dia.-40mm Sea water system pipe Mat: CuNi1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING SEA WATER SYSTEM(d) Dia.-40mm Sea water system pipe Mat: CuNi
2951011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING SEA WATER SYSTEM(d) Dia.-100mm Sea water system pipe Mat: CuNi1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING SEA WATER SYSTEM(d) Dia.-100mm Sea water system pipe Mat: CuNi
2961011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING BILGE SYSTEM(e) Dia.- 80mm pipe Mat: CuNi,1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING BILGE SYSTEM(e) Dia.- 80mm pipe Mat: CuNi,
2971011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING BILGE SYSTEM(f) Dia.-60mm pipe Mat: CuNi1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING BILGE SYSTEM(f) Dia.-60mm pipe Mat: CuNi
2981011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING BILGE SYSTEM(g) Dia.-50mm pipe Mat: GI1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING BILGE SYSTEM(g) Dia.-50mm pipe Mat: GI
2991011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING FUEL SYSTEM(h) Dia.- 50mm pipe Mat: CuNi,1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING FUEL SYSTEM(h) Dia.- 50mm pipe Mat: CuNi,
3001011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING FUEL SYSTEM(j) Dia.-20mm pipe Mat: CuNi1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING FUEL SYSTEM(j) Dia.-20mm pipe Mat: CuNi
3011011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING FRESH WATER SYSTEM(k) Dia-32 mm pipe MAT: CuNi1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING FRESH WATER SYSTEM(k) Dia-32 mm pipe MAT: CuNi
3021011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING Exhaust line(m) 150 mm Mat. Mild Steel1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING Exhaust line(m) 150 mm Mat. Mild Steel
3031011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING Exhaust line(n) 100 mm Mat. Mild Steel1011EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING & PRESSURE TESTING Exhaust line(n) 100 mm Mat. Mild Steel
3041011(a)System pipe linesFirm to undertake Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. System1011(a)System pipe linesFirm to undertake Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. System
3051011(a)System pipe linesManufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (i)System Pipes Lines (Mild Steel) up to 25 mm1011(a)System pipe linesManufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (i)System Pipes Lines (Mild Steel) up to 25 mm
3061011(a)System pipe linesManufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (ii) System Pipes Lines (Mild Steel) 26 mm to 50 mm1011(a)System pipe linesManufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (ii) System Pipes Lines (Mild Steel) 26 mm to 50 mm
3071011(a)System pipe lines Fabrication/Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (iii) System Pipes Lines (Mild Steel) 51 mm to 75 mm1011(a)System pipe lines Fabrication/Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (iii) System Pipes Lines (Mild Steel) 51 mm to 75 mm
3081011(a)System pipe lines Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (iv) System Pipes Lines (Mild Steel) 76 mm to 100 mm1011(a)System pipe lines Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (iv) System Pipes Lines (Mild Steel) 76 mm to 100 mm
3091011(a)System pipe lines Fabrication/Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (v) System Pipes Lines (Copper/Cuero Nickel/Cu Ni/SS 316 Ti ) up to 25 mm1011(a)System pipe lines Fabrication/Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (v) System Pipes Lines (Copper/Cuero Nickel/Cu Ni/SS 316 Ti ) up to 25 mm
3101011(a)System pipe lines Fabrication/Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (vi) System Pipes Lines (Copper/Cupro Nickel/Cu Ni/SS 316 Ti ) 26 mm to 50 mm1011(a)System pipe lines Fabrication/Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (vi) System Pipes Lines (Copper/Cupro Nickel/Cu Ni/SS 316 Ti ) 26 mm to 50 mm
3111011(a)System pipe lines Fabrication/Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (vii) System Pipes Lines (Copper/Cupro Nickel/Cu Ni/SS 316 Ti ) 51 mm to 75 mm1011(a)System pipe lines Fabrication/Manufacturing of new pipes as per sample. Job Includes templating, bending, fabrication, cutting, edge preparation, pressure testing as per procedure, fitment of suitable flanges. (vii) System Pipes Lines (Copper/Cupro Nickel/Cu Ni/SS 316 Ti ) 51 mm to 75 mm
3121011(a)System pipe lines (viii) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Aluminium Bronze Dia 6mm to 10 mm1011(a)System pipe lines (viii) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Aluminium Bronze Dia 6mm to 10 mm
3131011(a)System pipe lines (ix) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Aluminium Bronze Dia 11 mm to 20 mm1011(a)System pipe lines (ix) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Aluminium Bronze Dia 11 mm to 20 mm
3141011(a)System pipe lines (x) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Mild Steel Dia up to 25 mm1011(a)System pipe lines (x) Supply of new machined/manufactured end fittings (Unions Set, Check nuts,nipples ) as per material standards. Material: Mild Steel Dia up to 25 mm
3151011(a)System pipe lines (xi) Flanges- Firm to supply (machined/manufactured) flanges as per sample. Material: Mild Steel1011(a)System pipe lines (xi) Flanges- Firm to supply (machined/manufactured) flanges as per sample. Material: Mild Steel
3161011(a)System pipe lines (xii) Flanges- Firm to supply (machined/manufactured) flanges as per sample. Material: (Copper/Cupro Nickel/Cu Ni/SS 316 Ti )1011(a)System pipe lines (xii) Flanges- Firm to supply (machined/manufactured) flanges as per sample. Material: (Copper/Cupro Nickel/Cu Ni/SS 316 Ti )
3171011(a)System pipe lines (xiii) Old rubber rings inside the clamps are damaged. Firm to supply and replace the old rubber rings with rings. New rubber rings of various sizes as follows (40mm,65mm,80mm,100mm,125mm,150mm,160mm) (10 Nos each)1011(a)System pipe lines (xiii) Old rubber rings inside the clamps are damaged. Firm to supply and replace the old rubber rings with rings. New rubber rings of various sizes as follows (40mm,65mm,80mm,100mm,125mm,150mm,160mm) (10 Nos each)
3181012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS
3191012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(a) Overhauling of Foam guns to be carried out. Prove for satisfactory operation (fog and jet operation) Post completion foam gun to be painted. (red colour).1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(a) Overhauling of Foam guns to be carried out. Prove for satisfactory operation (fog and jet operation) Post completion foam gun to be painted. (red colour).
3201012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(b) Firm to supply new spares and fitment of All perished rubber fittings (80 mm Dia, 5 mm thick) to be carried out.1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(b) Firm to supply new spares and fitment of All perished rubber fittings (80 mm Dia, 5 mm thick) to be carried out.
3211012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(c) Overhauling of Foam gun drive gearboxes to be carried out and make free for movement1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(c) Overhauling of Foam gun drive gearboxes to be carried out and make free for movement
3221012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(d) Overhauling of Foam tank isolating valves to be carried out ( 50mm SDNR (GM))1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(d) Overhauling of Foam tank isolating valves to be carried out ( 50mm SDNR (GM))
3231012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(e) Firm to supply new spares and fitment of 50mm SDNR (Mat: GM) to be carried out1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(e) Firm to supply new spares and fitment of 50mm SDNR (Mat: GM) to be carried out
3241012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(f) Firm to supply new spares and fitment of 50mm SDNR (GM) to be carried out1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(f) Firm to supply new spares and fitment of 50mm SDNR (GM) to be carried out
3251012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(g) Firm to supply new spares and fitment of Couplings shaft locking pins (Dia 05 mm,10 mm long) to be carried out.1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(g) Firm to supply new spares and fitment of Couplings shaft locking pins (Dia 05 mm,10 mm long) to be carried out.
3261012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(h) Overhauling of Three way flushing valve to be carried out (50mm).1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(h) Overhauling of Three way flushing valve to be carried out (50mm).
3271012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(j) Overhauling of foam system proportionate to be carried out1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS(j) Overhauling of foam system proportionate to be carried out
3281013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM, MAKE: NEW FIRE ENGINEERS PVT LIMITED1013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM, MAKE: NEW FIRE ENGINEERS PVT LIMITED
3291013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(a) CO2 cylinders to be weighed and recharged with CO2 .1013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(a) CO2 cylinders to be weighed and recharged with CO2 .
3301013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(b) Overhauling of Non return valves on cylinder heads to be carried out1013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(b) Overhauling of Non return valves on cylinder heads to be carried out
3311013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(c) All CO2 discharge nozzles to be opened, checked for chockages, cleaned and fitted back.1013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(c) All CO2 discharge nozzles to be opened, checked for chockages, cleaned and fitted back.
3321013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(d) Overhauling of shuttle valve to be carried out1013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(d) Overhauling of shuttle valve to be carried out
3331013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(e) Overhauling of relief valve assembly to be carried out1013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(e) Overhauling of relief valve assembly to be carried out
3341013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(f) Overhauling of pressure operated switch to be carried out1013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(f) Overhauling of pressure operated switch to be carried out
3351013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(g) Complete drenching system piping to be blown through using HP air to prove system free of blockages1013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(g) Complete drenching system piping to be blown through using HP air to prove system free of blockages
3361013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(h) All CO2 cylinders (45 kg capacity) and system pipes to be painted as per coding post work completion.1013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(h) All CO2 cylinders (45 kg capacity) and system pipes to be painted as per coding post work completion.
3371013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(j) All system pipes (dia-20 mm) to be painted as per coding post work completion.1013EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM(j) All system pipes (dia-20 mm) to be painted as per coding post work completion.
3381014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP), MAKE/MODEL: EXCELTEC OMNIPURE 7ME, CAP: 1200 GAL/DAY1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP), MAKE/MODEL: EXCELTEC OMNIPURE 7ME, CAP: 1200 GAL/DAY
3391014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(a) Chemical cleaning of Surge tanks to be carried out1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(a) Chemical cleaning of Surge tanks to be carried out
3401014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(b) Firm to supply new pump. Fitment of Macerators pump to be carried out . Baldor wash down 1hp1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(b) Firm to supply new pump. Fitment of Macerators pump to be carried out . Baldor wash down 1hp
3411014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(c) Firm to supply new pump. Fitment of Overboard pump to be carried out. Baldor dirty duty 1hp1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(c) Firm to supply new pump. Fitment of Overboard pump to be carried out. Baldor dirty duty 1hp
3421014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(d) Firm to supply new valve and fitment of12mm needle valves to be carried out1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(d) Firm to supply new valve and fitment of12mm needle valves to be carried out
3431014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(e) Venturi to be dismantled cleaned internally and boxed back1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(e) Venturi to be dismantled cleaned internally and boxed back
3441014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(f) Inline strainer to be dismantled and strainer element to be renewed1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(f) Inline strainer to be dismantled and strainer element to be renewed
3451014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(g) Firm to supply new air filter and fitment of Air filter element to be carried out.1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(g) Firm to supply new air filter and fitment of Air filter element to be carried out.
3461014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(h) Air regulator to be dismantled cleaned and boxed up and set pressure to be set at range 1-150 psi1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(h) Air regulator to be dismantled cleaned and boxed up and set pressure to be set at range 1-150 psi
3471014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(j) Electro catalytic cell to be dismantled and acid cleaned using 6%-10% solution of water and muriatic acid.1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(j) Electro catalytic cell to be dismantled and acid cleaned using 6%-10% solution of water and muriatic acid.
3481014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(k) complete assembly and system pipe to be painted post work completion as per colour code.1014EQPT/SYSTEM: MARINE SANITATION DEVICE (STP)(k) complete assembly and system pipe to be painted post work completion as per colour code.
3491015 MISCELLANEOUS (a) DG cooling water pump suction & discharge pipe line to be renewed.( Pipe Dia 40 mm, Mat: CuNi, 10 Mtrs) New valves (Qty-02) to be fitted in Cooling water line to regulate the flow.1015 MISCELLANEOUS (a) DG cooling water pump suction & discharge pipe line to be renewed.( Pipe Dia 40 mm, Mat: CuNi, 10 Mtrs) New valves (Qty-02) to be fitted in Cooling water line to regulate the flow.
3501015 MISCELLANEOUS (b) Foundation frame ( Size 1.5 mts* 0.5 Mtrs) to be replace with newed. Primer to be applied post fitment of foundation frame. Set of Nut & bolt ( Material : SS ) to be provided by firm1015 MISCELLANEOUS (b) Foundation frame ( Size 1.5 mts* 0.5 Mtrs) to be replace with newed. Primer to be applied post fitment of foundation frame. Set of Nut & bolt ( Material : SS ) to be provided by firm
3511015 MISCELLANEOUS c) Main Engine & DA Engine complete structure to be cleaned. Spray down the entire engine block with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply suitable anti rust coating to engine body. Cautions to be taken while cleaning of engine. Sensors and controls not be damaged.1015 MISCELLANEOUS c) Main Engine & DA Engine complete structure to be cleaned. Spray down the entire engine block with degreaser. Scrub down the deposited oil,grease,rust and dirt. After complete cleaning apply suitable anti rust coating to engine body. Cautions to be taken while cleaning of engine. Sensors and controls not be damaged.
3521015 MISCELLANEOUS d) Shafting System:- Intermediate/Propeller shaft to be cleaned. Spray down the entire shaft (from main engine to propulsion system) with degreaser. Scrub down the deposited oil,grease,rust and dirt. Grease to be applied to shaft for rust prevention.1015 MISCELLANEOUS d) Shafting System:- Intermediate/Propeller shaft to be cleaned. Spray down the entire shaft (from main engine to propulsion system) with degreaser. Scrub down the deposited oil,grease,rust and dirt. Grease to be applied to shaft for rust prevention.
3531015 MISCELLANEOUS e) Main Engine Exhaust trunking to be cleaned internally. Compensator to be replaced with new.1015 MISCELLANEOUS e) Main Engine Exhaust trunking to be cleaned internally. Compensator to be replaced with new.
3541015 MISCELLANEOUS f) DA Exhaust trunking to be cleaned internally. Compensator to be replaced with new.1015 MISCELLANEOUS f) DA Exhaust trunking to be cleaned internally. Compensator to be replaced with new.
3551015 MISCELLANEOUS g) DA Exhaust lagging to be renewed1015 MISCELLANEOUS g) DA Exhaust lagging to be renewed
3561015 MISCELLANEOUS h) Main engine Exhaust lagging to be renewed1015 MISCELLANEOUS h) Main engine Exhaust lagging to be renewed
3571015 MISCELLANEOUS j) Rack at spare room perished , New racks to be fabricated in spare/ store room as per sample ( Rack dimensions 240*120*60 cms) . For Sufficient strength Angle bar 5 mm to be provided for racks to store heavy spare parts. Three side to be covered by metal sheet and five partitions with support of angle bars ( minimum 02 nos) be provided in each rack. Primer and paint to be applied to racks. Dimensions: Metal Sheet 2 mm, Angle bar 5 mm,1015 MISCELLANEOUS j) Rack at spare room perished , New racks to be fabricated in spare/ store room as per sample ( Rack dimensions 240*120*60 cms) . For Sufficient strength Angle bar 5 mm to be provided for racks to store heavy spare parts. Three side to be covered by metal sheet and five partitions with support of angle bars ( minimum 02 nos) be provided in each rack. Primer and paint to be applied to racks. Dimensions: Metal Sheet 2 mm, Angle bar 5 mm,
3581015 MISCELLANEOUS k) Firm to supply strainers for sea water system. Strainers to be fabricated as per sample (Shape:Cylinderical/Box), Mat : Brass ( thickness up to 4mm, height up to 20 mm)1015 MISCELLANEOUS k) Firm to supply strainers for sea water system. Strainers to be fabricated as per sample (Shape:Cylinderical/Box), Mat : Brass ( thickness up to 4mm, height up to 20 mm)
3591015 MISCELLANEOUS m) Firm to supply strainers for sea water system. Strainers to be fabricated as per sample (Shape:Cylinderical), Mat : Brass ( thickness up to 4mm, Diameter up to 10 inch, height up to 18 inch.)1015 MISCELLANEOUS m) Firm to supply strainers for sea water system. Strainers to be fabricated as per sample (Shape:Cylinderical), Mat : Brass ( thickness up to 4mm, Diameter up to 10 inch, height up to 18 inch.)
3601015 MISCELLANEOUS n) Firm to provide Sacrificial Zinc anodes with brass plug fitting. Size: ( 1 inch to 2 inch) Anodes to be manufactured as per sample1015 MISCELLANEOUS n) Firm to provide Sacrificial Zinc anodes with brass plug fitting. Size: ( 1 inch to 2 inch) Anodes to be manufactured as per sample
3611015 MISCELLANEOUS p) Zinc Plugs for main engine along with adapters to be replaced. Location of Zinc Plug is elbow of the auxiliary water pump and elbow of the after cooler. (Zinc Plugs be provided by Firm)1015 MISCELLANEOUS p) Zinc Plugs for main engine along with adapters to be replaced. Location of Zinc Plug is elbow of the auxiliary water pump and elbow of the after cooler. (Zinc Plugs be provided by Firm)
3621015 MISCELLANEOUS q) FIFI system inlet sea water line pressure measuring point and pressure gauge to be provided. (range 0-10bar)1015 MISCELLANEOUS q) FIFI system inlet sea water line pressure measuring point and pressure gauge to be provided. (range 0-10bar)
3631015 MISCELLANEOUS r) FIFI system outlet sea water line pressure measuring point and pressure gauges to be provided. (range 0-10bar)1015 MISCELLANEOUS r) FIFI system outlet sea water line pressure measuring point and pressure gauges to be provided. (range 0-10bar)
3641015 MISCELLANEOUS s) Both Main Engines sea water suction line pressure measuring points and pressure gauge to be provided1015 MISCELLANEOUS s) Both Main Engines sea water suction line pressure measuring points and pressure gauge to be provided
3651015 MISCELLANEOUS t) RU tanks level sight glass tubes to be renewed. Quick closing valve and drain valves for sight glass to be renewed.1015 MISCELLANEOUS t) RU tanks level sight glass tubes to be renewed. Quick closing valve and drain valves for sight glass to be renewed.
3661015 MISCELLANEOUS u) Portable pump along with motor ( capacity: 1-2 HP) to be overhauled. and prove for satisfactory operation. Pump end flange connections to be renewed1015 MISCELLANEOUS u) Portable pump along with motor ( capacity: 1-2 HP) to be overhauled. and prove for satisfactory operation. Pump end flange connections to be renewed
3671015 MISCELLANEOUS v) Sea water pump housing is perished . Reconditioning of sea water pump housing to be carried out.1015 MISCELLANEOUS v) Sea water pump housing is perished . Reconditioning of sea water pump housing to be carried out.
3681015 MISCELLANEOUS w) Sea water pump shaft is damaged . Reconditioning of sea water pump shaft to be carried out.1015 MISCELLANEOUS w) Sea water pump shaft is damaged . Reconditioning of sea water pump shaft to be carried out.
3691015 MISCELLANEOUS x) Sea water pump impeller is damaged . Reconditioning of sea water pump impeller to be carried out.1015 MISCELLANEOUS x) Sea water pump impeller is damaged . Reconditioning of sea water pump impeller to be carried out.
3701015 MISCELLANEOUS y) Reconditioning of pump damaged parts including Shaft & impeller, pump housing to be done.1015 MISCELLANEOUS y) Reconditioning of pump damaged parts including Shaft & impeller, pump housing to be done.
3711015 MISCELLANEOUS z) Firm to supply Victaulic Clamps/Coupling with suitable gaskets of various sizes ( Size: 2\\" to 4 \\") as per sample.1015 MISCELLANEOUS z) Firm to supply Victaulic Clamps/Coupling with suitable gaskets of various sizes ( Size: 2\\" to 4 \\") as per sample.
3721015 MISCELLANEOUS aa) Firm to supply Victaulic type flanges as per sample (Dia 80~100 mm)1015 MISCELLANEOUS aa) Firm to supply Victaulic type flanges as per sample (Dia 80~100 mm)
3731015 MISCELLANEOUS ab) Firm to supply new valve (Gear operated butterfly valve: Dia 80~100 mm)1015 MISCELLANEOUS ab) Firm to supply new valve (Gear operated butterfly valve: Dia 80~100 mm)
3741015 MISCELLANEOUS ac) Firm to supply new Wet and dry dust vacuum cleaner (Industrial type) Make Dewalt, power- 1400 watts,Capacity-36 Ltrs.1015 MISCELLANEOUS ac) Firm to supply new Wet and dry dust vacuum cleaner (Industrial type) Make Dewalt, power- 1400 watts,Capacity-36 Ltrs.
3751015 MISCELLANEOUS (ad) Firm to supply and fitment of name tallies for All system valves and filling lines .1015 MISCELLANEOUS (ad) Firm to supply and fitment of name tallies for All system valves and filling lines .
3761015 MISCELLANEOUS (ae) Main engine Air Starting line Pressure reducing valve (PRV):- Firm to supply new PRV and for both main engine to be replaced . Prove for satisfactory trials., Range-30bar to 10 bar, Dia- 40mm.1015 MISCELLANEOUS (ae) Main engine Air Starting line Pressure reducing valve (PRV):- Firm to supply new PRV and for both main engine to be replaced . Prove for satisfactory trials., Range-30bar to 10 bar, Dia- 40mm.
3771015 MISCELLANEOUS (af) Firm to supply and fitment of Moisture separators to be done. For starting air line The moisture separator to be replace with newed before air starter. The separator to be provided by firm. Details of moisture separator are as follows:- Make: Hydint/Ceson , Design Press/Working press : 16 Bar, Test Press: 24 Bar, Size 1 1/2\\", Element : S/ Steel , Line Size: 40 mm.. Fitment of moisture separator to be carried out and prove for satisfactory trials. Job includes fabrication/renewal of system pipe line, joints, connection , flanges etc. Firm to quote for required spares and material to undertake job1015 MISCELLANEOUS (af) Firm to supply and fitment of Moisture separators to be done. For starting air line The moisture separator to be replace with newed before air starter. The separator to be provided by firm. Details of moisture separator are as follows:- Make: Hydint/Ceson , Design Press/Working press : 16 Bar, Test Press: 24 Bar, Size 1 1/2\\", Element : S/ Steel , Line Size: 40 mm.. Fitment of moisture separator to be carried out and prove for satisfactory trials. Job includes fabrication/renewal of system pipe line, joints, connection , flanges etc. Firm to quote for required spares and material to undertake job
3781015 MISCELLANEOUS (ag) Firm to supply and fitment of Air line pressure hoses, Dia -40mm, Length-2 Mtrs1015 MISCELLANEOUS (ag) Firm to supply and fitment of Air line pressure hoses, Dia -40mm, Length-2 Mtrs
3791015 MISCELLANEOUS (ah) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm1015 MISCELLANEOUS (ah) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm
3801015 MISCELLANEOUS (aj) AC Outdoor unit deteriorated view exposure & weather conditions. Suitable protection cover/box to be fabricated for AC outdoor units. AC outdoor unit supporting stand to be renewed.1015 MISCELLANEOUS (aj) AC Outdoor unit deteriorated view exposure & weather conditions. Suitable protection cover/box to be fabricated for AC outdoor units. AC outdoor unit supporting stand to be renewed.
3811015 MISCELLANEOUS (ah) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm1015 MISCELLANEOUS (ah) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm
3821015 MISCELLANEOUS (aj) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm1015 MISCELLANEOUS (aj) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm
3831015 MISCELLANEOUS (ah) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm1015 MISCELLANEOUS (ah) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm
3841015 MISCELLANEOUS (ah) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm1015 MISCELLANEOUS (ah) Firm to supply and fitment of Starting air line lubricators, pipe line Dia- 40mm
3851016 EQPT: Submersible Pump, MAKE : Modi1016 EQPT: Submersible Pump, MAKE : Modi
3861016 EQPT: Submersible Pump, MAKE : Modi, Model- S541, Capacity- 40 TPH(a) Submersible pump to be overhaul and discharge side canvas hose to be renewed (Dia- 4 inch, length- 50 meter). Pump to be proved for satisfactory performance post work completion. Capacity- 40 TPH1016 EQPT: Submersible Pump, MAKE : Modi, Model- S541, Capacity- 40 TPH(a) Submersible pump to be overhaul and discharge side canvas hose to be renewed (Dia- 4 inch, length- 50 meter). Pump to be proved for satisfactory performance post work completion. Capacity- 40 TPH
3871016 EQPT: Submersible Pump, MAKE : Modi, Capacity- 20 TPH(b) Submersible pump to be overhaul and discharge side canvas hose to be renewed (Dia- 4 inch, length- 50 meter). Pump to be proved for satisfactory performance post work completion. Capacity- 20 TPH1016 EQPT: Submersible Pump, MAKE : Modi, Capacity- 20 TPH(b) Submersible pump to be overhaul and discharge side canvas hose to be renewed (Dia- 4 inch, length- 50 meter). Pump to be proved for satisfactory performance post work completion. Capacity- 20 TPH
3881017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE, Type- AQUAMASTER US1201/2500 , Manufacturing no-61805(Stbd),61804(Port) . Routines/ Job to be undertaken by OEM/OEM authorised rep only. Firm to supply/use spares/consumables indicated/approved by OEM/OEM authorised rep1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE, Type- AQUAMASTER US1201/2500 , Manufacturing no-61805(Stbd),61804(Port) . Routines/ Job to be undertaken by OEM/OEM authorised rep only. Firm to supply/use spares/consumables indicated/approved by OEM/OEM authorised rep
3891017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(a) Firm to supply new spares and fitment of clutch oil and Boost oil pressure gauge (0-40bar) to be carried out.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(a) Firm to supply new spares and fitment of clutch oil and Boost oil pressure gauge (0-40bar) to be carried out.
3901017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(b) Sluggish operation of AQM lever throttle observed during operation. New cable for AQM Lever throttle to be supplied and be replaced . Prove for satisfactory performance.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(b) Sluggish operation of AQM lever throttle observed during operation. New cable for AQM Lever throttle to be supplied and be replaced . Prove for satisfactory performance.
3911017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(c) Cleaning and flushing of gravity tanks, steering oil tanks and gravity oil pipe line for SRP units to be carried out. Firm to inspect upper units and lower gears, adjust if required. Oil for flushing will be provided by Firm1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(c) Cleaning and flushing of gravity tanks, steering oil tanks and gravity oil pipe line for SRP units to be carried out. Firm to inspect upper units and lower gears, adjust if required. Oil for flushing will be provided by Firm
3921017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(d) Chemical cleaning and pressure testing of lub oil coolers to be carried out.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(d) Chemical cleaning and pressure testing of lub oil coolers to be carried out.
3931017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(e) Coolers to be boxed up with new zinc anodes. Anodes to be manufactured as per sample.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(e) Coolers to be boxed up with new zinc anodes. Anodes to be manufactured as per sample.
3941017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(f) Renew the seals of the propeller shaft, seals of the steering tube and of the input shaft. Firm to quote and supply all spares and consumables to undertake job including Propeller shaft seal, Radial Seal, Shaft seals,O-rings,Sealing rings, steel wire,Sleeve,set screw .1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(f) Renew the seals of the propeller shaft, seals of the steering tube and of the input shaft. Firm to quote and supply all spares and consumables to undertake job including Propeller shaft seal, Radial Seal, Shaft seals,O-rings,Sealing rings, steel wire,Sleeve,set screw .
3951017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(g) Accumulator assembly to be charged to pre-pressure. Prove for satisfactory operation.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(g) Accumulator assembly to be charged to pre-pressure. Prove for satisfactory operation.
3961017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(h) Lub oil in sump to be completely drained and new oil charged SP 150. Oil to be provided by the firm.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(h) Lub oil in sump to be completely drained and new oil charged SP 150. Oil to be provided by the firm.
3971017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(j) Hydraulic oil to be drained and new oil charged SERVO System 46. Oil to be provided by the firm.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(j) Hydraulic oil to be drained and new oil charged SERVO System 46. Oil to be provided by the firm.
3981017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(k) Firm to supply new spares and fitment of hydraulic oil filter elements to be carried out. Firm to quote for filter cartridges and seal kit. Each set contains following filter cartridge and seal kit:- Filter Cartridge RRM000026236, Filter Cartridge RRM000026233, Seal Kit RRM000026248/ Ref Patt no 6659858.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(k) Firm to supply new spares and fitment of hydraulic oil filter elements to be carried out. Firm to quote for filter cartridges and seal kit. Each set contains following filter cartridge and seal kit:- Filter Cartridge RRM000026236, Filter Cartridge RRM000026233, Seal Kit RRM000026248/ Ref Patt no 6659858.
3991017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(m) Firm to supply new spares and fitment of lub oil filter elements to be carried out. / Ref Patt no 6659861.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(m) Firm to supply new spares and fitment of lub oil filter elements to be carried out. / Ref Patt no 6659861.
4001017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(n)Firm to supply new spares and fitment of all drive belts to be carried out. Firm to supply Pump Drive belts- V-Belt RRM0000259841017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(n)Firm to supply new spares and fitment of all drive belts to be carried out. Firm to supply Pump Drive belts- V-Belt RRM000025984
4011017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(p) Renew/Replace the zinc anodes of Aqua Master Kort Nozzle. Firm to supply following Zinc/sacrificial anodes:- (i) Zinc Anode (5251216L25-A mounting of bottom well, Qty-12 Pcs) (ii) Sacrificial Anode (5251096000 A Rope Guard, Qty-12 Pcs) (iii) Sacrificial Anode (5150736 Nozzle, Qty -08 Pcs)1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(p) Renew/Replace the zinc anodes of Aqua Master Kort Nozzle. Firm to supply following Zinc/sacrificial anodes:- (i) Zinc Anode (5251216L25-A mounting of bottom well, Qty-12 Pcs) (ii) Sacrificial Anode (5251096000 A Rope Guard, Qty-12 Pcs) (iii) Sacrificial Anode (5150736 Nozzle, Qty -08 Pcs)
4021017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(q) Paint under water parts according to the surface treatment instructions.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(q) Paint under water parts according to the surface treatment instructions.
4031017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(r) Carry out maintenance on all intermediate shaft bearing. Remove the used grease and fresh standard grease to be packed.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(r) Carry out maintenance on all intermediate shaft bearing. Remove the used grease and fresh standard grease to be packed.
4041017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(s) Greasing of universal shaft joints to be carried out1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(s) Greasing of universal shaft joints to be carried out
4051017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(t) Check the condition of the gears through the inspection hatches. Intermediate shaft bearings to be dismantled and old grease removed. Greasing of bearing to be carried out thereafter Grease type EP-21017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(t) Check the condition of the gears through the inspection hatches. Intermediate shaft bearings to be dismantled and old grease removed. Greasing of bearing to be carried out thereafter Grease type EP-2
4061017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(u) Firm to supply new spares and fitment of All flexible hoses/ durettes to be replaced with new (to be supplied as per sample.)1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(u) Firm to supply new spares and fitment of All flexible hoses/ durettes to be replaced with new (to be supplied as per sample.)
4071017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(v) Firm to supply new spares and fitment of Breathing filter (RRM000026221) ,Breather Filler Cap(RRM000026220)1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(v) Firm to supply new spares and fitment of Breathing filter (RRM000026221) ,Breather Filler Cap(RRM000026220)
4081017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(w) Firm to supply new spares and fitment of accumulator solenoid valves to be carried out1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(w) Firm to supply new spares and fitment of accumulator solenoid valves to be carried out
4091017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(x) SRP system equipments/pipe lines etc to be clean completely and painted post work completion as per colour code. Firm to supply hydraulic sealing material, lubrication grease,marker,corrosion inhibitor, sealing glue for undertaking routines of SRP system.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(x) SRP system equipments/pipe lines etc to be clean completely and painted post work completion as per colour code. Firm to supply hydraulic sealing material, lubrication grease,marker,corrosion inhibitor, sealing glue for undertaking routines of SRP system.
4101017 (a) EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE . Firm to supply/use spares/consumables indicated/approved by OEM/OEM authorised rep Following Instrumentation gauges and thermometers to be calibrated and certificate to be rendered. Defective items to be replaced with new.1017 (a) EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE . Firm to supply/use spares/consumables indicated/approved by OEM/OEM authorised rep Following Instrumentation gauges and thermometers to be calibrated and certificate to be rendered. Defective items to be replaced with new.
4111017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(a) Firm to undertake Firm to undertake Calibration/Serviceability checks of all Instrumentation gauges and thermometers fitted for SRP system and Firm to undertake Calibration/Serviceability checks certificate to be rendered. Defective items to be replaced with new.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(a) Firm to undertake Firm to undertake Calibration/Serviceability checks of all Instrumentation gauges and thermometers fitted for SRP system and Firm to undertake Calibration/Serviceability checks certificate to be rendered. Defective items to be replaced with new.
4121017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(b) Firm to supply new Clutch oil pressure gauge (0-40bar) and fitment of pressure gauge to be carried out. Prove for satisfactory operation.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(b) Firm to supply new Clutch oil pressure gauge (0-40bar) and fitment of pressure gauge to be carried out. Prove for satisfactory operation.
4131017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(c) Firm to supply new Lub oil pressure gauge (0-6bar) and fitment of pressure gauge to be carried out. Prove for satisfactory operation.1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(c) Firm to supply new Lub oil pressure gauge (0-6bar) and fitment of pressure gauge to be carried out. Prove for satisfactory operation.
4141017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(d) Firm to supply new Thermometers ( as sample) and fitment of Thermometers for local reading to be carried out1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(d) Firm to supply new Thermometers ( as sample) and fitment of Thermometers for local reading to be carried out
4151017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(e) Valves for oil pressure adjustment of SRP system to be overhauled and Post overhauling system Oil pressure to be adjusted, Valves to be proved for satisfactory performance1017EQPT/SYSTEM:SRP SYSTEM, MAKE : ROLLS ROYCE(e) Valves for oil pressure adjustment of SRP system to be overhauled and Post overhauling system Oil pressure to be adjusted, Valves to be proved for satisfactory performance
4161018EQPT/SYSTEM: BILGE PLATFORM1018EQPT/SYSTEM: BILGE PLATFORM
4171018EQPT/SYSTEM: BILGE PLATFORM(a) Engine Room and SRP compartment bilge platform to be removed, cleaned and painting of plates . Post completion of work all plates to be fitted back to facilitate bilge area work.1018EQPT/SYSTEM: BILGE PLATFORM(a) Engine Room and SRP compartment bilge platform to be removed, cleaned and painting of plates . Post completion of work all plates to be fitted back to facilitate bilge area work.
4181018EQPT/SYSTEM: BILGE PLATFORM(b) Renew bilge platform plate of SRP compartment . Material- aluminium chequered plates, thickness- 05 mm,1018EQPT/SYSTEM: BILGE PLATFORM(b) Renew bilge platform plate of SRP compartment . Material- aluminium chequered plates, thickness- 05 mm,
4191018EQPT/SYSTEM: BILGE PLATFORM(c) Bilge plates to be secured with bilge securing screws, Material - SS1018EQPT/SYSTEM: BILGE PLATFORM(c) Bilge plates to be secured with bilge securing screws, Material - SS
4201018EQPT/SYSTEM: BILGE PLATFORM(d) Bilge platform supporting brackets for SRP Compartment to be renewed as indicated . Mat - MS1018EQPT/SYSTEM: BILGE PLATFORM(d) Bilge platform supporting brackets for SRP Compartment to be renewed as indicated . Mat - MS
4211019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM. Routines/ Job to be undertaken by OEM/OEM authorised rep only. Firm to supply/use spares/consumables indicated/approved by OEM/OEM authorised rep1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM. Routines/ Job to be undertaken by OEM/OEM authorised rep only. Firm to supply/use spares/consumables indicated/approved by OEM/OEM authorised rep
4221019MAIN ENGINE, Make: Cummins, (a) Carry out visual inspection of mounts. Check thickness of damper at 0,90, 180,270 degree positions. Checks to be undertaken in coupled condition.1019MAIN ENGINE, Make: Cummins, (a) Carry out visual inspection of mounts. Check thickness of damper at 0,90, 180,270 degree positions. Checks to be undertaken in coupled condition.
4231019MAIN ENGINE, Make: Cummins, (b) Record crankshaft end clearances with dial indicator and crank shaft deflection to be checked1019MAIN ENGINE, Make: Cummins, (b) Record crankshaft end clearances with dial indicator and crank shaft deflection to be checked
4241019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, (c) Calibrate the PT pump based on performance of engine (reports to be rendered)1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, (c) Calibrate the PT pump based on performance of engine (reports to be rendered)
4251019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, (d) Calibrate the injectors based on performance of engine (reports to be rendered)1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, (d) Calibrate the injectors based on performance of engine (reports to be rendered)
4261019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, e) Inspect charge air cooler side and chemical cleaning to be carried out. Job includes Cleaning of the internal passages i.e. air and fresh water/coolant side To be pressure tested up to 2 Kg/cm21019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, e) Inspect charge air cooler side and chemical cleaning to be carried out. Job includes Cleaning of the internal passages i.e. air and fresh water/coolant side To be pressure tested up to 2 Kg/cm2
4271019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM,f) Cleaning of injector screen, fuel pump magnetic screen filter and magnetic screen filter to be carried out1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM,f) Cleaning of injector screen, fuel pump magnetic screen filter and magnetic screen filter to be carried out
4281019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, g) Cleaning of turbocharger compressor wheel and diffuser to be carried out1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, g) Cleaning of turbocharger compressor wheel and diffuser to be carried out
4291019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, h) Chemical cleaning of heat exchangers to be carried out . Heat Exchangers to be prove for satisfactory performance.1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, h) Chemical cleaning of heat exchangers to be carried out . Heat Exchangers to be prove for satisfactory performance.
4301019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, j) Cleaning and inspection of vibration damper for leak to be carried out1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, j) Cleaning and inspection of vibration damper for leak to be carried out
4311019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM,k) Firm to supply engine oil ( Servo Premium/Pride 15W40)1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM,k) Firm to supply engine oil ( Servo Premium/Pride 15W40)
4321019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, m) Firm to supply and fitment of fuel fitters (primary and secondary) to be carried out1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, m) Firm to supply and fitment of fuel fitters (primary and secondary) to be carried out
4331019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, n) Firm to supply fitment of air filter to be carried out1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, n) Firm to supply fitment of air filter to be carried out
4341019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM,p) Firm to supply new lub oil coolers and fitment of Lube oil coolers to be carried out1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM,p) Firm to supply new lub oil coolers and fitment of Lube oil coolers to be carried out
4351019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, q) Firm to supply and fitment of thermostat to be carried out1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, q) Firm to supply and fitment of thermostat to be carried out
4361019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM,r) Firm to undertake tappet clearance for all unit of main engine and adjust. Firm to supply & fitment of the tappet cover gaskets to be carried out .1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM,r) Firm to undertake tappet clearance for all unit of main engine and adjust. Firm to supply & fitment of the tappet cover gaskets to be carried out .
4371019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, s) Drain the engine coolant, flush the cooling system, and fill fresh coolant1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, s) Drain the engine coolant, flush the cooling system, and fill fresh coolant
4381019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, t) Overhauling of priming pump to be carried out. Job includes renewal of three jaw couplings, bearings, seals and gaskets and prove for satisfactory performance . Firm to supply additional 02 sets of couplings as per sample1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, t) Overhauling of priming pump to be carried out. Job includes renewal of three jaw couplings, bearings, seals and gaskets and prove for satisfactory performance . Firm to supply additional 02 sets of couplings as per sample
4391019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, u) Overhauling of fresh water pump to be carried out Job includes renewal of bearings, seals and gaskets. Pump to be proved for satisfactory performance1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, u) Overhauling of fresh water pump to be carried out Job includes renewal of bearings, seals and gaskets. Pump to be proved for satisfactory performance
4401019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, v) Firm to supply & Renewal of sea water pump (3049157)including gear (3008841), gear ring (3008840), Lock washer (S605) & Cap screw (127512)1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, v) Firm to supply & Renewal of sea water pump (3049157)including gear (3008841), gear ring (3008840), Lock washer (S605) & Cap screw (127512)
4411019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, w) Overhauling of sea water pump to be carried out. Job includes renewal of bearings, seals and gaskets. Pump to be proved for satisfactory performance1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, w) Overhauling of sea water pump to be carried out. Job includes renewal of bearings, seals and gaskets. Pump to be proved for satisfactory performance
4421019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, x) Firm to supply & Renewal of Fresh water pump(AR3050447) for both main engines.1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, x) Firm to supply & Renewal of Fresh water pump(AR3050447) for both main engines.
4431019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, y) Overhauling of Air starter motor to be carried out. Job includes renewal of pinion ,bearings and seals. Prove air starter for satisfactory performance1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, y) Overhauling of Air starter motor to be carried out. Job includes renewal of pinion ,bearings and seals. Prove air starter for satisfactory performance
4441019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, z) Firm to supply and renew air solenoid valve for main engine air starter1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, z) Firm to supply and renew air solenoid valve for main engine air starter
4451019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, aa) Firm to supply main engine air starter motor (3026797).1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, aa) Firm to supply main engine air starter motor (3026797).
4461019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, ab) Firm to supply Renewal of Expansion tank and Cap Filler.1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, ab) Firm to supply Renewal of Expansion tank and Cap Filler.
4471019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, ac) Firm to inspect/Check for loose/broken support bracket bolts, clearance between support flanges for thermal expansion and misalignment between trunking sections. Exhaust system pipes to be provided with support or load hanger at various places.1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, ac) Firm to inspect/Check for loose/broken support bracket bolts, clearance between support flanges for thermal expansion and misalignment between trunking sections. Exhaust system pipes to be provided with support or load hanger at various places.
4481019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, ac) Firm to supply main engine air starter motor Pinions(SS815R-1331),Bolts(SS800R-394),Washers(SS800-725),Springs(SS800L-419).1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, ac) Firm to supply main engine air starter motor Pinions(SS815R-1331),Bolts(SS800R-394),Washers(SS800-725),Springs(SS800L-419).
4491019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, ad) Post completion of all routines, run the engine and check all engine related parameters and Undertake load trials. Prove for satisfactory performance.1019MAIN ENGINE, Make: Cummins, Model: KTA 38-M, Rating / Capacity: 1200BHP@1800 RPM, ad) Post completion of all routines, run the engine and check all engine related parameters and Undertake load trials. Prove for satisfactory performance.
4501020EQPT : DIESEL GENERATOR, Make: CUMMINS, Model- NT495MG DG FWD(Port) Running hrs since Installation : 15011 hrs (till Dec 23) Last routine carried out - 12000hrly / NR-20 DG AFT (Stbd) Running hrs since Installation : 16532 hrs (till Dec 23) , Last routine carried out - 12000 hrly / NR-20 Routines/ Job to be undertaken by OEM/OEM authorised rep only. Firm to supply/use spares/consumables indicated/approved by OEM/OEM authorised rep1020EQPT : DIESEL GENERATOR, Make: CUMMINS, Model- NT495MG DG FWD(Port) Running hrs since Installation : 15011 hrs (till Dec 23) Last routine carried out - 12000hrly / NR-20 DG AFT (Stbd) Running hrs since Installation : 16532 hrs (till Dec 23) , Last routine carried out - 12000 hrly / NR-20 Routines/ Job to be undertaken by OEM/OEM authorised rep only. Firm to supply/use spares/consumables indicated/approved by OEM/OEM authorised rep
4511020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (a) Carry out visual inspection of mounts. Check condition of shock vibration mountings (max. permissible deflection in rubber metal bonds is 20% in height).1020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (a) Carry out visual inspection of mounts. Check condition of shock vibration mountings (max. permissible deflection in rubber metal bonds is 20% in height).
4521020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (b) Firm to supply and renew the mounts as their condition is deteriorated.1020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (b) Firm to supply and renew the mounts as their condition is deteriorated.
4531020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (c) Firm to supply head gaskets and replace DG cylinder head gasket with new.1020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (c) Firm to supply head gaskets and replace DG cylinder head gasket with new.
4541020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (d) Undertake alignment checks between the generator and engine and restore radial/axial initial alignment to 25% of the maximum limit1020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (d) Undertake alignment checks between the generator and engine and restore radial/axial initial alignment to 25% of the maximum limit
4551020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (e) Sump oil to be drained, Sump to be cleaned and fresh lub oil to be charged into sump.( Servo 15 W 40)1020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (e) Sump oil to be drained, Sump to be cleaned and fresh lub oil to be charged into sump.( Servo 15 W 40)
4561020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (e1) Firm to replace all lub oil filters with new. Filters to be supplied by Firm1020 EQPT: DIESEL GENERATOR (PORT & STBD)MAKE: CUMMINS, MODEL: NT495MG (e1) Firm to replace all lub oil filters with new. Filters to be supplied by Firm
4571020 DIESEL GENERATOR,MAKE-Cummins India LTD(f) Firm to replace all fuel oil filters with new. Filters to be supplied by Firm1020 DIESEL GENERATOR,MAKE-Cummins India LTD(f) Firm to replace all fuel oil filters with new. Filters to be supplied by Firm
4581020 DIESEL GENERATOR,MAKE-Cummins India LTD(g) Overhauling of Turbocharger to be carried out. Job includes renewal of seals and bearings of Turbocharger. Post Overhauling Turbocharger to be proved for satisfactory performance.1020 DIESEL GENERATOR,MAKE-Cummins India LTD(g) Overhauling of Turbocharger to be carried out. Job includes renewal of seals and bearings of Turbocharger. Post Overhauling Turbocharger to be proved for satisfactory performance.
4591020 DIESEL GENERATOR,MAKE-Cummins India LTD(h) Firm to supply new heat exchanger Patt no. AR32468821020 DIESEL GENERATOR,MAKE-Cummins India LTD(h) Firm to supply new heat exchanger Patt no. AR3246882
4601020 DIESEL GENERATOR,MAKE-Cummins India LTD(j) Remove Fuel injection pump. Clean,inspect,calibrate & repair with new spare parts.(New spares required for overhauling to be supplied by firm)1020 DIESEL GENERATOR,MAKE-Cummins India LTD(j) Remove Fuel injection pump. Clean,inspect,calibrate & repair with new spare parts.(New spares required for overhauling to be supplied by firm)
4611020 DIESEL GENERATOR,MAKE-Cummins India LTD(k) Firm to replace fuel injection line for DG Manifold fuel(4021110)1020 DIESEL GENERATOR,MAKE-Cummins India LTD(k) Firm to replace fuel injection line for DG Manifold fuel(4021110)
4621020 DIESEL GENERATOR,MAKE-Cummins India LTD(m) Firm to Supply fuel injection line for DG Manifold fuel(4021110)1020 DIESEL GENERATOR,MAKE-Cummins India LTD(m) Firm to Supply fuel injection line for DG Manifold fuel(4021110)
4631020 DIESEL GENERATOR,MAKE-Cummins India LTD(n) Firm to replace fuel Drain line for DG Manifold fuel drain (3875502)1020 DIESEL GENERATOR,MAKE-Cummins India LTD(n) Firm to replace fuel Drain line for DG Manifold fuel drain (3875502)
4641020 DIESEL GENERATOR,MAKE-Cummins India LTD(p) Firm to Supply fuel Drain line for DG Manifold fuel drain (3875502)1020 DIESEL GENERATOR,MAKE-Cummins India LTD(p) Firm to Supply fuel Drain line for DG Manifold fuel drain (3875502)
4651020 DIESEL GENERATOR,MAKE-Cummins India LTD(q) Remove Injectors, Clean, inspect and Firm to undertake Calibration/Serviceability checks to be carried out. All O-rings to be renewed. .Report of Firm to undertake Calibration/Serviceability checks to be rendered.(Spares for Testing/Firm to undertake Calibration/Serviceability checks of injectors to be considered in BoQ of material)1020 DIESEL GENERATOR,MAKE-Cummins India LTD(q) Remove Injectors, Clean, inspect and Firm to undertake Calibration/Serviceability checks to be carried out. All O-rings to be renewed. .Report of Firm to undertake Calibration/Serviceability checks to be rendered.(Spares for Testing/Firm to undertake Calibration/Serviceability checks of injectors to be considered in BoQ of material)
4661020 DIESEL GENERATOR,MAKE-Cummins India LTD(r) Replace zinc plugs of Heat Exchangers. Firm to quote for material cost of Zn plugs.1020 DIESEL GENERATOR,MAKE-Cummins India LTD(r) Replace zinc plugs of Heat Exchangers. Firm to quote for material cost of Zn plugs.
4671020 DIESEL GENERATOR,MAKE-Cummins India LTD(s) Overhauling of fresh water pump to be carried out. Pump to be proved for satisfactory performance.1020 DIESEL GENERATOR,MAKE-Cummins India LTD(s) Overhauling of fresh water pump to be carried out. Pump to be proved for satisfactory performance.
4681020 DIESEL GENERATOR,MAKE-Cummins India LTD(t) Firm to supply New Fresh water pump1020 DIESEL GENERATOR,MAKE-Cummins India LTD(t) Firm to supply New Fresh water pump
4691020 DIESEL GENERATOR,MAKE-Cummins India LTD(u) DG cooling Sea water pump suction & discharge pipe line to be renewed. Mat Cu Ni1020 DIESEL GENERATOR,MAKE-Cummins India LTD(u) DG cooling Sea water pump suction & discharge pipe line to be renewed. Mat Cu Ni
4701020 DIESEL GENERATOR,MAKE-Cummins India LTD(v) DG Sea water pump to be renewed Patt no 3225879. Pump inlet and outlet flange connections to be renewed.1020 DIESEL GENERATOR,MAKE-Cummins India LTD(v) DG Sea water pump to be renewed Patt no 3225879. Pump inlet and outlet flange connections to be renewed.
4711020 DIESEL GENERATOR,MAKE-Cummins India LTD(w) Replace all flexible hoses/wire breaded hoses of cooling system, lub oil and fuel systems.(All hoses to be considered within the cost of material)1020 DIESEL GENERATOR,MAKE-Cummins India LTD(w) Replace all flexible hoses/wire breaded hoses of cooling system, lub oil and fuel systems.(All hoses to be considered within the cost of material)
4721020 DIESEL GENERATOR,MAKE-Cummins India LTD(x) Check / Tighten all foundation bolts.1020 DIESEL GENERATOR,MAKE-Cummins India LTD(x) Check / Tighten all foundation bolts.
4731020 DIESEL GENERATOR,MAKE-Cummins India LTD(y) Carry out Tappet settings.1020 DIESEL GENERATOR,MAKE-Cummins India LTD(y) Carry out Tappet settings.
4741020 DIESEL GENERATOR,MAKE-Cummins India LTD(z) Firm to supply and replace turbocharger (Conversion Kit Turbo Part no. KIT3238552) with new.1020 DIESEL GENERATOR,MAKE-Cummins India LTD(z) Firm to supply and replace turbocharger (Conversion Kit Turbo Part no. KIT3238552) with new.
4751020 DIESEL GENERATOR,MAKE-Cummins India LTD (aa) Remove & chemical Cleaning of lub oil cooler to be carried out. pressure testing to be done .Renew gasket & 'o' rings. Repairs of end covers to be undertaken1020 DIESEL GENERATOR,MAKE-Cummins India LTD (aa) Remove & chemical Cleaning of lub oil cooler to be carried out. pressure testing to be done .Renew gasket & 'o' rings. Repairs of end covers to be undertaken
4761020 DIESEL GENERATOR,MAKE-Cummins India LTD (ab) Firm to Drain Coolant of both DG's. Carry out descaling of engine cooling water circuit by circulating the descaling agent. Flush Through using restore plus. Renew coolant. Coolant to be supplied by firm1020 DIESEL GENERATOR,MAKE-Cummins India LTD (ab) Firm to Drain Coolant of both DG's. Carry out descaling of engine cooling water circuit by circulating the descaling agent. Flush Through using restore plus. Renew coolant. Coolant to be supplied by firm
4771020 DIESEL GENERATOR,MAKE-Cummins India LTD (ac) Sea water pump foundation to be renewed. Firm to fabricate pump foundation (Material SS). Dip tray to be manufactured underneath the pump and arrangement for water drainage to be facilitate.1020 DIESEL GENERATOR,MAKE-Cummins India LTD (ac) Sea water pump foundation to be renewed. Firm to fabricate pump foundation (Material SS). Dip tray to be manufactured underneath the pump and arrangement for water drainage to be facilitate.
4781020 DIESEL GENERATOR,MAKE-Cummins India LTD (ad) Dip tray to be manufactured underneath the pump and arrangement for water drainage to be facilitate.1020 DIESEL GENERATOR,MAKE-Cummins India LTD (ad) Dip tray to be manufactured underneath the pump and arrangement for water drainage to be facilitate.
4791020 DIESEL GENERATOR,MAKE-Cummins India LTD (ae) All rubber duretts,clamps,jubilee clips to be renewed. These consumables to be supplied by firm. Dia 40-60 mm,1020 DIESEL GENERATOR,MAKE-Cummins India LTD (ae) All rubber duretts,clamps,jubilee clips to be renewed. These consumables to be supplied by firm. Dia 40-60 mm,
4801020 DIESEL GENERATOR,MAKE-Cummins India LTD (af) Air intake filter to be renewed1020 DIESEL GENERATOR,MAKE-Cummins India LTD (af) Air intake filter to be renewed
4811020 DIESEL GENERATOR,MAKE-Cummins India LTD (ag) Remove & chemical Cleaning of fresh water cooler to be carried out. pressure testing to be done .Renew gasket & 'o' rings. Repairs of end covers to be undertaken1020 DIESEL GENERATOR,MAKE-Cummins India LTD (ag) Remove & chemical Cleaning of fresh water cooler to be carried out. pressure testing to be done .Renew gasket & 'o' rings. Repairs of end covers to be undertaken
4821020 DIESEL GENERATOR,MAKE-Cummins India LTD (ah) Firm to clean fresh water expansion tank internally and externally. Tank to be chemically cleaned internally. Pressure testing to be carried out. Necessary repair to be undertaken. Tank to be painted. Pressure cap to be replaced with new.1020 DIESEL GENERATOR,MAKE-Cummins India LTD (ah) Firm to clean fresh water expansion tank internally and externally. Tank to be chemically cleaned internally. Pressure testing to be carried out. Necessary repair to be undertaken. Tank to be painted. Pressure cap to be replaced with new.
4831020 DIESEL GENERATOR,MAKE-Cummins India LTD (ak) Firm to supply and renew expansion tank1020 DIESEL GENERATOR,MAKE-Cummins India LTD (ak) Firm to supply and renew expansion tank
4841020EQPT : DIESEL GENERATOR, Make: CUMMINSam) Firm to supply and Replacement of rocker cover gaskets to be carried out1020EQPT : DIESEL GENERATOR, Make: CUMMINSam) Firm to supply and Replacement of rocker cover gaskets to be carried out
4851020EQPT : DIESEL GENERATOR, Make: CUMMINSan) Dismantle and carry out chemical cleaning of exhaust compensator and silencer. Carry out Insite pressure testing of the double jacket of exhaust trunking , identify leaks and rectify. Carry out exhaust trunking alignment and securing.1020EQPT : DIESEL GENERATOR, Make: CUMMINSan) Dismantle and carry out chemical cleaning of exhaust compensator and silencer. Carry out Insite pressure testing of the double jacket of exhaust trunking , identify leaks and rectify. Carry out exhaust trunking alignment and securing.
4861020EQPT : DIESEL GENERATOR, Make: CUMMINSap) Tightening of all foundation bolts of engine and alternator mountings.1020EQPT : DIESEL GENERATOR, Make: CUMMINSap) Tightening of all foundation bolts of engine and alternator mountings.
4871020EQPT : DIESEL GENERATOR, Make: CUMMINSaq) DG lub oil priming pump (Manually operated, Semi rotary pump) to be overhauled and prove for satisfactory operation.1020EQPT : DIESEL GENERATOR, Make: CUMMINSaq) DG lub oil priming pump (Manually operated, Semi rotary pump) to be overhauled and prove for satisfactory operation.
4881020EQPT : DIESEL GENERATOR, Make: CUMMINSar) Firm to supply new DG lub oil pump (Manually operated, Semi rotary pump) to be replaced with new and prove for satisfactory operation..1020EQPT : DIESEL GENERATOR, Make: CUMMINSar) Firm to supply new DG lub oil pump (Manually operated, Semi rotary pump) to be replaced with new and prove for satisfactory operation..
4891020EQPT : DIESEL GENERATOR, Make: CUMMINSas) Firm to supply and fitment of new Exhaust line pressure Gauges with sensors1020EQPT : DIESEL GENERATOR, Make: CUMMINSas) Firm to supply and fitment of new Exhaust line pressure Gauges with sensors
4901020EQPT : DIESEL GENERATOR, Make: CUMMINSat)Firm to supply and Renew Fresh water and Sea water pump belts1020EQPT : DIESEL GENERATOR, Make: CUMMINSat)Firm to supply and Renew Fresh water and Sea water pump belts
4911020EQPT : DIESEL GENERATOR, Make: CUMMINSau) Firm to supply lub oil level dipsticks (Part no. 119704)1020EQPT : DIESEL GENERATOR, Make: CUMMINSau) Firm to supply lub oil level dipsticks (Part no. 119704)
4921020EQPT : DIESEL GENERATOR, Make: CUMMINSav) Post completion of routines, start the engine and check all parameters . Undertake load trials . Prove for satisfactory performance.1020EQPT : DIESEL GENERATOR, Make: CUMMINSav) Post completion of routines, start the engine and check all parameters . Undertake load trials . Prove for satisfactory performance.
4931021 EQPT: HAND PUMPS (E/R Bilge,FO,LO,FW,Forward Bilge) ( All pumps are Hard to Operate) MAKE: M/S Bhargav1021 EQPT: HAND PUMPS (E/R Bilge,FO,LO,FW,Forward Bilge) ( All pumps are Hard to Operate) MAKE: M/S Bhargav
4941021 EQPT: HAND PUMPS(a) Dismantle and Clean pumps internally, Firm to supply new spares and fitment of wear down parts1021 EQPT: HAND PUMPS(a) Dismantle and Clean pumps internally, Firm to supply new spares and fitment of wear down parts
4951021 EQPT: HAND PUMPS(b) Fitment of Pump Suction cocks to be carried out, size 25 mm1021 EQPT: HAND PUMPS(b) Fitment of Pump Suction cocks to be carried out, size 25 mm
4961021 EQPT: HAND PUMPS(c) Firm to supply new spares and fitment of Wooden handles of pumps to be carried out. ( as per existing sample)1021 EQPT: HAND PUMPS(c) Firm to supply new spares and fitment of Wooden handles of pumps to be carried out. ( as per existing sample)
4971021 EQPT: HAND PUMPS(d) Pump to be boxed back and proved for satisfactory performance.1021 EQPT: HAND PUMPS(d) Pump to be boxed back and proved for satisfactory performance.
4981022 EQPT: SYSTEM VALVES. Following system valves to be removed, chemically cleaned, Overhauling to be carried out. All valves to be painted as per colour code. Post overhauling pressure testing to be done1022 EQPT: SYSTEM VALVES. Following system valves to be removed, chemically cleaned, Overhauling to be carried out. All valves to be painted as per colour code. Post overhauling pressure testing to be done
4991022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(a) 200mm Gate valve1022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(a) 200mm Gate valve
5001022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(b) 80mm SDNR valve1022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(b) 80mm SDNR valve
5011022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(c) 65mm SDNR valve1022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(c) 65mm SDNR valve
5021022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(d) 40mm SDNR valve1022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(d) 40mm SDNR valve
5031022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(e) 80 mm angle valve1022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(e) 80 mm angle valve
5041022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(f) 65mm angle valve1022 EQPT: SYSTEM VALVESSea water system:- Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(f) 65mm angle valve
5051022 EQPT: SYSTEM VALVESBilge System: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(g) 80mm SDNR valve1022 EQPT: SYSTEM VALVESBilge System: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(g) 80mm SDNR valve
5061022 EQPT: SYSTEM VALVESBilge System : Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(h) 60mm SDNR valve1022 EQPT: SYSTEM VALVESBilge System : Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(h) 60mm SDNR valve
5071022 EQPT: SYSTEM VALVESBilge System: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(j) 50mm SDNR valve1022 EQPT: SYSTEM VALVESBilge System: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(j) 50mm SDNR valve
5081022 EQPT: SYSTEM VALVESFuel Line System: Overhauling of Valve to be carried out and pressure testing of valve to be carried out. All valves to be painted as per colour code(k) 40mm QSV Spring loaded valve1022 EQPT: SYSTEM VALVESFuel Line System: Overhauling of Valve to be carried out and pressure testing of valve to be carried out. All valves to be painted as per colour code(k) 40mm QSV Spring loaded valve
5091022 EQPT: SYSTEM VALVESFuel Line System: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(m) 25mm QSV valve1022 EQPT: SYSTEM VALVESFuel Line System: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(m) 25mm QSV valve
5101022 EQPT: SYSTEM VALVESFuel Line System: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(n) 40mm SDNR valve1022 EQPT: SYSTEM VALVESFuel Line System: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(n) 40mm SDNR valve
5111022 EQPT: SYSTEM VALVESFuel Line System: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(p) 20mm SDNR1022 EQPT: SYSTEM VALVESFuel Line System: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(p) 20mm SDNR
5121022 EQPT: SYSTEM VALVESFresh water valve: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(q) 32mm SDNR1022 EQPT: SYSTEM VALVESFresh water valve: Overhauling of Valve to be carried out. Chemical cleaning and pressure testing of valve to be carried out. All valves to be painted as per colour code(q) 32mm SDNR
5131022 EQPT: SYSTEM VALVESExhaust Drain Line: Firm to supply new valves and same to be fitted at position as indicated. Prove for satisfactory operation. (r) 20mm Ball valve1022 EQPT: SYSTEM VALVESExhaust Drain Line: Firm to supply new valves and same to be fitted at position as indicated. Prove for satisfactory operation. (r) 20mm Ball valve
5141022 EQPT: SYSTEM VALVESExhaust Drain Line: Firm to supply new valves and same to be fitted at position as indicated. Prove for satisfactory operation. (s) 10mm Ball valve1022 EQPT: SYSTEM VALVESExhaust Drain Line: Firm to supply new valves and same to be fitted at position as indicated. Prove for satisfactory operation. (s) 10mm Ball valve
5151022 EQPT: SYSTEM VALVESFire Line; Chemical cleaning and pressure testing of the following to be carried out. All valves to be painted as per colour code(t) 60mm Fire hydrant valves1022 EQPT: SYSTEM VALVESFire Line; Chemical cleaning and pressure testing of the following to be carried out. All valves to be painted as per colour code(t) 60mm Fire hydrant valves
5161022 EQPT: SYSTEM VALVESFire Line: Chemical cleaning and pressure testing of the following to be carried out. All valves to be painted as per colour code(u) 50mm SDNR valves1022 EQPT: SYSTEM VALVESFire Line: Chemical cleaning and pressure testing of the following to be carried out. All valves to be painted as per colour code(u) 50mm SDNR valves
5171022 EQPT: SYSTEM VALVESFiFi Line: Chemical cleaning and pressure testing of the following to be carried out. All valves to be painted as per colour code(v) 200mm SDNR Valve1022 EQPT: SYSTEM VALVESFiFi Line: Chemical cleaning and pressure testing of the following to be carried out. All valves to be painted as per colour code(v) 200mm SDNR Valve
5181022 EQPT: SYSTEM VALVESFiFi Line: Chemical cleaning and pressure testing of the following to be carried out. All valves to be painted as per colour code(w) 300mm Gate Valve1022 EQPT: SYSTEM VALVESFiFi Line: Chemical cleaning and pressure testing of the following to be carried out. All valves to be painted as per colour code(w) 300mm Gate Valve
5191022 EQPT: SYSTEM VALVESFiFi Line: Chemical cleaning and pressure testing of the following to be carried out. All valves to be painted as per colour code(x) 100mm SDNR valve1022 EQPT: SYSTEM VALVESFiFi Line: Chemical cleaning and pressure testing of the following to be carried out. All valves to be painted as per colour code(x) 100mm SDNR valve
5201022 EQPT: SYSTEM VALVESAir Line: Firm to supply new valves and same to be fitted at position as indicated. Prove for satisfactory operation. (y) 25mm Ball Valve1022 EQPT: SYSTEM VALVESAir Line: Firm to supply new valves and same to be fitted at position as indicated. Prove for satisfactory operation. (y) 25mm Ball Valve
5211022 EQPT: SYSTEM VALVESAir Line: Firm to supply new valves and same to be fitted at position as indicated. Prove for satisfactory operation. (z) 15mm Ball valve1022 EQPT: SYSTEM VALVESAir Line: Firm to supply new valves and same to be fitted at position as indicated. Prove for satisfactory operation. (z) 15mm Ball valve
5221022 EQPT: SYSTEM VALVES(aa) Firm to supply new spares and fitment of15mm Ball valve to be carried out1022 EQPT: SYSTEM VALVES(aa) Firm to supply new spares and fitment of15mm Ball valve to be carried out
5231022 EQPT: SYSTEM VALVES(ab) Firm to supply new spares and fitment of 25mm Ball valves to be carried out1022 EQPT: SYSTEM VALVES(ab) Firm to supply new spares and fitment of 25mm Ball valves to be carried out
5241022Eqpt/ system: AIR BOTTLES, Make- Elgi, Capacity-250Ltr, Max working pressure-30 bar, Test pressure-49.5 bar1022Eqpt/ system: AIR BOTTLES, Make- Elgi, Capacity-250Ltr, Max working pressure-30 bar, Test pressure-49.5 bar
5251022Eqpt/ system: AIR BOTTLES(a) Chemical cleaning and pressure testing of air bottles to be carried out. Thread Cleaning for inlet, outlet pipe nipple fittings to be carried out. Replacement of drain valve, inlet valve and outlet valve to be carried out. Firm to supply new valves for each bottle.1022Eqpt/ system: AIR BOTTLES(a) Chemical cleaning and pressure testing of air bottles to be carried out. Thread Cleaning for inlet, outlet pipe nipple fittings to be carried out. Replacement of drain valve, inlet valve and outlet valve to be carried out. Firm to supply new valves for each bottle.
5261022Eqpt/ system: AIR BOTTLES(b) Firm to undertake Calibration/Serviceability checks of safety valve to be carried out. Prove for satisfactory operation1022Eqpt/ system: AIR BOTTLES(b) Firm to undertake Calibration/Serviceability checks of safety valve to be carried out. Prove for satisfactory operation
5271022Eqpt/ system: AIR BOTTLES(c ) Firm to supply new gauges and fitment of pressure gauges (0 - 50 bar) to be carried out1022Eqpt/ system: AIR BOTTLES(c ) Firm to supply new gauges and fitment of pressure gauges (0 - 50 bar) to be carried out
528ELECTRICAL WORK PACKAGEAll electrical power components / spares like contactors, overload relays, etc are to be sourced from Navy approved vendors. IMPORTANT NOTE:- Following points are applicable for all relevant DL's and shipyards/Firms to consider and quote accordingly. (a) Firm to supply new spares and fitment of Items / Spares:- (i) Firm to supply new spares and fitment of items / spares wherever mentioned in the QDL to be undertaken by shipyard / firm as per the sample / drawing / details provided by SS / COA / RMT. (ii) Shipyard / Firm should undertake the routines / overhaul of the equipment including the mandatory spares required for undertaking the same, irrespective of the spares mentioned in the mandatory spares list provided by ND(V). (iii) Further, the cost should include the degutting of existing item, supply of new item, fitment and proving of the system post renewal.ELECTRICAL WORK PACKAGEAll electrical power components / spares like contactors, overload relays, etc are to be sourced from Navy approved vendors. IMPORTANT NOTE:- Following points are applicable for all relevant DL's and shipyards/Firms to consider and quote accordingly. (a) Firm to supply new spares and fitment of Items / Spares:- (i) Firm to supply new spares and fitment of items / spares wherever mentioned in the QDL to be undertaken by shipyard / firm as per the sample / drawing / details provided by SS / COA / RMT. (ii) Shipyard / Firm should undertake the routines / overhaul of the equipment including the mandatory spares required for undertaking the same, irrespective of the spares mentioned in the mandatory spares list provided by ND(V). (iii) Further, the cost should include the degutting of existing item, supply of new item, fitment and proving of the system post renewal.

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download 8ce7e003-6ea7-4daf-82a9-1b57b392c64c.pdf Tender Documents 0 KB
Download 1778908989.xlsx Tender Documents 0 KB
Download 1778909215.pdf Tender Documents 0 KB
Download 1778909220.pdf Tender Documents 0 KB
Download 1778909226.pdf Tender Documents 0 KB
Download 1778909231.pdf Tender Documents 0 KB
Download 1779275923.pdf Tender Documents 0 KB
Download 1779275990.pdf Tender Documents 0 KB
Download 1779276236.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.