Indian Tenders

Tender Notice

TDR 55583943
Tendering Authority Uttar Pradesh Power Corporation Limited
Tender No GEM/2026/B/7554793
Tender ID GEM/2026/B/7554793
Tender Brief Bids Are invited for Boqeudd
City Mainpuri
State Uttar Pradesh
Document Fees Refer document
EMD INR 76000.0 /-
Tender Value INR 76 Lakhs /-
Tender Type Reverse Auction
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Boqeudd Supply Of 11 Kv V Type Cross Arm Cl With Bolts And Nuts - 11 Kv V Type Cross Arm Cl With Bolts And Nuts , Supply Of Three Phase Distribution Box Cl With Nut And Bolts - Three Phase Distribution Box Cl With Nut And Bolts , Supply Of Connecting Cable For Distribution Box 1X35 Sq.Mm. - Connecting Cable For Distribution Box 1X35 Sq.Mm. , Supply Of L.T. Fuse Set Protection Box With All Accessories - L.T. Fuse Set Protection Box With All Accessories , Supply Of Tinned Copper Fuse Wire Different Size - Tinned Copper Fuse Wire Different Size , Supply Of Hdpe Pipe 140 Mm. - Hdpe Pipe 140 Mm. , Supply Of Stone Pad 300X300x75 - Stone Pad 300X300x75 , Supply Of Ms Angle 75X75x6x2028mm With Cl And Bolt And Nut Tf Base - Ms Angle 75X75x6x2028mm With Cl And Bolt And Nut Tf Base , Supply Of T Off Chhanel And T Off Cl With Nut And Bolts - T Off Chhanel And T Off Cl With Nut And Bolts , Supply Of Top Chhanel 125X65x240 - Top Chhanel 125X65x240 , Supply Of Dropper Channel 100X50x2028 Mm. - Dropper Channel 100X50x2028 Mm. , Supply Of Chemical Earthing With G.I. Patti Cl Nut And Bolts As Per Norms , Supply Of L.T. Tail Less Unit With All Respective Material Angel, Patti And Other Material - L.T. Tail Less Unit With All Respective Material Angel, Patti And Other Material , Supply Of Copper L Pieace 62X225x12mm. - Copper L Pieace 62X225x12mm. , Supply Of 4 Core Lt Mcb With Box For 250 Kva Tf - 4 Core Lt Mcb With Box For 250 Kva Tf , Supply Of 11 Kv F Cl With Nut And Bolts - 11 Kv F Cl With Nut And Bolts , Supply Of Al. Pg Cl Weasel To Weasel Conductor - Al. Pg Cl Weasel To Weasel Conductor , Supply Of Al. Pg Cl Rabbit To Rabbit Conductor - Al. Pg Cl Rabbit To Rabbit Conductor , Supply Of Suspension Cl - Suspension Cl , Supply Of Dead End Cl - Dead End Cl , Supply Of Eye I Hook - Eye I Hook , Supply Of Eye Bolts For Guarding - Eye Bolts For Guarding , Supply Of J Hook - J Hook , Supply Of Lt Cl For Pcc Or Stp With Bolts And Nuts - Lt Cl For Pcc Or Stp With Bolts And Nuts , Supply Of Pearcing Connector - Pearcing Connector , Supply Of Alluminium Lug 120 Sq.Mm. - Alluminium Lug 120 Sq.Mm. , Supply Of Alluminium Lug 240 Sq.Mm. - Alluminium Lug 240 Sq.Mm. , Supply Of Guarding Angel - Guarding Angel , Supply Of Guarding Angel Cl - Guarding Angel Cl , Carriage Of 8.5 M Pcc Pole From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 8.5 M Pcc Pole , Carriage Of 9 M Stp Pole Sp55 Galvanised From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 9 M Stp Pole Sp 55 Galvanised , Carriage Of 11 M Stp Pole Sp 55 Galvanised From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 M Stp Pole Sp 55 Galvanised , Carriage Of 13 M Stp Pole Sp 55 Galvanised From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 13 M Stp Pole Sp 55 Galvanised , Carriage Of V Type Cross Arm For 11 Kv From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department V Type Cross Arm For 11 Kv , Carriage Of 11 Kv Pin Insulator With Pin From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 Kv Pin Insulator With Pin , Carriage Of Disc Insulator With Fitting Tandc 45 Kn From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department Disc Insulator With Fitting Tandc 45 Kn , Carriage Of 11 Kv Fuse Set From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 Kv Fuse Set , Carriage Of 11 Kv Tpmo With Polymer Insulator From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 Kv Tpmo With Polymer Insulator , Carriage Of Complete Stay 9Gi Stay Rod 20X1800 Mm, Etc Material From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department Complete Stay 9Gi Stay Rod 20X1800 Mm, Stay Wire 7 Or 8 Swg, 10 Kg, Stay Cl , Bolt, Nut And Washer , Carriage Of Distribution Transformer 100 Kva From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department Distribution Transformer 100 Kva , Carriage Of Distribution Transformer 250 Kva From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department Distribution Transformer 250 Kva , Carriage Of Acsr Rabbit Conductor From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department Acsr Rabbit Conductor , Carriage Of Acsr Weasel Conductor Or Insulated Conductor As Provided By Department From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department Acsr Weasel Conductor Or Insulated Conductor As Provided By Department , Carriage Of M S Earthing Rod 20 X2540 Mm From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department M S Earthing Rod 20 X2540 Mm , Carriage Of Lt Al. Xlpe Cable Size 1X240 Sq.Mm. From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department Lt Al. Xlpe Cable Size 1X240 Sq.Mm. , Carriage Of Lt Xlpe Cable 1X120 Sq.Mm. From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department Lt Xlpe Cable 1X120 Sq.Mm. , Carriage Of 11 Kv Xlpe Cable 3X185 Sq.Mm. From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 Kv Xlpe Cable 3X185 Sq.Mm. , Carriage Of Lt Ab Cable 3X120 1X95 1X16 Sq.Mm. From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department Lt Ab Cable 3X120 1X95 1X16 Sq.Mm. , Carriage Of 33 Kv Xlpe Cable 3X300 Sq.Mm. From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 33 Kv Xlpe Cable 3X300 Sq.Mm. , Carriage Of 11 Kv Xlpe Cable 3X300 Sq.Mm. From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 Kv Xlpe Cable 3X300 Sq.Mm. , Carriage Of 11 Kv Indoor Or Outdoor Jointing Kit Size 3X300 Sq.Mm. From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 Kv Indoor Or Outdoor Jointing Kit Size 3X300 Sq.Mm. , Carriage Of 11 Kv Indoor Or Outdoor Jointing Kit Size 3X185 Sq.Mm. From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 Kv Indoor Or Outdoor Jointing Kit Size 3X185 Sq.Mm. , Carriage Of 33 Kv Indoor Or Outdoor Jointing Kit Size 3X300 Sq.Mm. From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 33 Kv Indoor Or Outdoor Jointing Kit Size 3X300 Sq.Mm. , Carriage Of 11 Kv Straight Through Size 3X185 Sq.Mm. From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 Kv Straight Through Size 3X185 Sq.Mm. , Carriage Of 11 Kv Vcb For Og Ctr 200By100by5a 350 Mva 1250 . From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 Kv Vcb For Og Ctr 200By100by5a 350 Mva 1250 . , Carriage Of 11 Kv Vcb Ic Ctr 600By300by5a 350 Mva 1250 . From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department 11 Kv Vcb Ic Ctr 600By300by5a 350 Mva 1250 . , Carriage Of G.I. Wire 6Or8 Swg For Guarding From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department G.I. Wire 6 Or 8 Swg For Guarding , Carriage Of Three Phase Distribution Box From Esc Mnp - Carriage Following Material From Centre Stores, Mainpuri To Site Of Work Distance 00-20 Kms Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends As Per Respo Manual And As Per Direction Of Concern Executive Engineer Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work In The Area Of Concern Division Under Edc Mainpuri, Material Shall Be Provieded By Department Three Phase Distribution Box , Erection Of Fixing Of L.T. Fuse Set Protection Box With All Respective Accessories As Per Norms - Fixing Of L.T. Fuse Set Protection Box With All Respective Accessories As Per Norms , Execution Of Chemical Earthing With G.I. Patti Cl Nut And Bolts As Per Norms , Erection Of L.T. Tail Less Unit With All Respective Material As Grouted Angel With Fabrication Work Etc. - L.T. Tail Less Unit With All Respective Material As Grouted Angel With Fabrication Work Etc. , Laying Of Acsr Rabbit Conductor - Laying, Stringing, Sagging, Binding And Jumpering Etc Of Following Conductor On The Erected Supports, As Per Respo Norms. Acsr Rabbit Conductor , Laying Of Acsr Weasel Conductor Or Insulated Conductor As Provided By Department - Laying, Stringing, Sagging, Binding And Jumpering Etc Of Following Conductor On The Erected Supports, As Per Respo Norms. Acsr Weasel Conductor Or Insulated Conductor As Provided By Department , Laying Of Lt Ab Cable 3X120 1X95 1X16 Sq.Mm. - Laying, Stringing, Sagging, With All Respective Material Cl With Nut And Bolts Suspension Cl Eye J Hook Pearcing Connector Etc Of Following Conductor Cable On The Erected Supports, As Per Respo Norms. Lt Ab Cable 3X120 1X95 1X16 Sq.Mm. , Mounting Of Three Phase Distribution Box - Mounting Of Three Phase Distribution Box With Cl Nut & Bolts And Make Proper Connection With Connecting Cable. , Erection Of Double Pole Structure - Erection Of Double Pole Structure 11 Mtr Stp Pole By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. 22 Nos Pole At Different Location Under Concern Division. , Erection Of Single Pole Structure - Erection Of Single Pole Structure 8.5 Mtrs Pcc Pole, 9 Mtr St, 11 Mtr St Pole, 13 Mtr St By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. At Different Location Under Concern Division. , Grouting Of Pcc Or Stp Pole - Grouting Of Pcc Or Stp Pole Long As Per Respo Norms With Material Cement, Sand, Blast Stone With The Ratio 0.268 Cu.M. Each Will Be Provided By Conractor , Grouting Of Stay - Grouting Of Stay As Per Respo Norms Cement, Sand, Blast Stone Material Will Be Provided By Conractor , Earthing Of Pole - Earthing Of Pole By M S Earthing Rod 20 X2540 Mm With 6 Swg Earthing Wire Etc And Make Proper Connection. , Guarding Of 11 Kv Line With Gaurding Angel Etc - Guarding Of 11 Kv Line With Gaurding Angel, Cl Eye Bolts And Gaurding G.I. Wire 6 Or 8 Swg 60 Span , Fencing Of Distribution Transformers - Fencing Of Distribution Transformers With Enamel In Proper Alignment As Per Respo Manual And As Per Direction Of Executive Engineer Including The Cost Of Arrangement Of Labour, T And P, Carrier Etc. Required For Proper Completion Of Work. , Make Plinth For 250 Kva Transformer Proper Size As Per Resspo Norms , Installation Of 11By0.4 Kv Tf 100 Kva - Installation Of The Following New Transformers At Various 11By0.4 Kv Substation, Under The Jurisdiction Of Concern Distribution Division, Mainpuri, In Proper Alignment And Direction And Making Proper Htbylt Connection As Per Instruction Of Executive Engineer After Carriage The Same From Centre Stores,Mainpuri Including The Work Of Safe Loading And Unloading At The Respective Ends And Also Including The Cost Of Arrangement Of Laborer, Tandp, Carrier Etc Required For Proper Completion Of Work. 11By0.4 Kv Tf 100 Kva With L.T. Xlpe Cable Suitable Size With All Respective Material As Per Norms. , Installation Of 11By0.4 Kv Tf 250 Kva - Installation Of The Following New Transformers At Various 11By0.4 Kv Substation, Under The Jurisdiction Of Concern Distribution Division, Mainpuri, In Proper Alignment And Direction And Making Proper Htbylt Connection As Per Instruction Of Executive Engineer After Carriage The Same From Centre Stores,Mainpuri Including The Work Of Safe Loading And Unloading At The Respective Ends And Also Including The Cost Of Arrangement Of Laborer, Tandp, Carrier Etc Required For Proper Completion Of Work. 11By0.4 Kv Tf 250 Kva With L.T. Xlpe Cable Suitable Size With All Respective Material As Per Norms. , Laying Of 11 Kv Xlpe Cable 3X185 Sq.Mm. - Laying Of Following Cable Including Digging And Restoring Along With Brick And Sand Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work. At Different Location Under Concern Division.11 Kv Xlpe Cable 3X185 Sq.Mm. , Laying Of 11 Kv Xlpe Cable 3X300 Sq.Mm. - Laying Of Following Cable Including Digging And Restoring Along With Brick And Sand Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work. At Different Location Under Concern Division. 11 Kv Xlpe Cable 3X300 Sq.Mm. , Laying Of 33 Kv Xlpe Cable 3X300 Sq.Mm. - Laying Of Following Cable By Hdd Method With Hdpe Pipe 140 Mm. Including Digging And Restoring Along With Brick And Sand Including The Cost Of Arrangement Of Labour, Tandp, Carrier Etc. Required For Proper Completion Of Work. 33 Kv Xlpe Cable 3X300 Sq.Mm. , Installation Of 33 Kv Indoor Or Outdoor Jointing Kit Size 3X300 Sq.Mm. As Per Norms. , Installation Of 11 Kv Indoor Or Outdoor Jointing Kit Size 3X185 Sq.Mm. As Per Norms. , Installation Of 11 Kv Indoor Or Outdoor Jointing Kit Size 3X300 Sq.Mm. As Per Norms. , Installation Of 11 Kv Straight Through Size 3X185 Sq.Mm. As Per Norms. , Installation Of 11 Kv Vcb Og Ctr 200By100by5a 350 Mva 1250 . - Installation Of 11 Kv Vcb Og Ctr 200By100by5a 350 Mva 1250 . And Make Proper Connection As Per Norms. , Installation Of 11 Kv Vcb Ic Ctr 600By300by5a 350 Mva 1250 . - Installation Of 11 Kv Vcb Ic Ctr 600By300by5a 350 Mva 1250 . And Make Proper Connection As Per Norms. , Dismentlling Of Old And Damaged Cable Of Different Size - Dismentlling Of Old And Damaged Cable Of Different Size Including With Rolling Received Back And Safe Carriage From Pit Site To Esc, Mainpuri , Received Back Of Distribution Transformer After Increasing Capacity - Received Back Of Distribution Transformer After Increasing Capacity From Pit Site To Esc, Mainpuri 30 Nos 100 Kva Total Quantity : 25732

Key Dates

Publish Date 20-05-2026
Last Date of Bid Submission 10-06-2026
Tender Opening Date 10-06-2026

Contact Information

Company Name Uttar Pradesh Power Corporation Limited
Address 205001,Electricity Distribution Circle, Power House, Mainpuri

BOQ Items

Sl. No. Item TitleItem Description
1Supply of 11 KV V type cross arm Clamp with bolts and nuts11 KV V type cross arm Clamp with bolts and nuts
2Supply of Three Phase Distribution Box Clamp with Nut and BoltsThree Phase Distribution Box Clamp with Nut and Bolts
3Supply of Connecting Cable for Distribution Box 1x35 Sq.mm.Connecting Cable for Distribution Box 1x35 Sq.mm.
4Supply of L.T. Fuse Set Protection Box with all AccessoriesL.T. Fuse Set Protection Box with all Accessories
5Supply of Tinned Copper Fuse Wire Different SizeTinned Copper Fuse Wire Different Size
6Supply of HDPE PIPE 140 MM.HDPE PIPE 140 MM.
7Supply of Stone Pad 300x300x75Stone Pad 300x300x75
8Supply of MS Angle 75x75x6x2028mm with clamp and Bolt and nut TF baseMS Angle 75x75x6x2028mm with clamp and Bolt and nut TF base
9Supply of T Off Chhanel and T OFF Clamp with Nut and BoltsT Off Chhanel and T OFF Clamp with Nut and Bolts
10Supply of Top Chhanel 125x65x240Top Chhanel 125x65x240
11Supply of Dropper Channel 100x50x2028 mm.Dropper Channel 100x50x2028 mm.
12Supply of Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per NormsChemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms
13Supply of L.T. Tail Less unit with all respective material Angel, Patti and other MaterialL.T. Tail Less unit with all respective material Angel, Patti and other Material
14Supply of Copper L Pieace 62x225x12mm.Copper L Pieace 62x225x12mm.
15Supply of 4 core LT MCB with box for 250 KVA TF4 core LT MCB with box for 250 KVA TF
16Supply of 11 KV F Clamp with Nut and Bolts11 KV F Clamp with Nut and Bolts
17Supply of AL. PG Clamp Weasel to Weasel ConductorAL. PG Clamp Weasel to Weasel Conductor
18Supply of AL. PG Clamp Rabbit to Rabbit ConductorAL. PG Clamp Rabbit to Rabbit Conductor
19Supply of Suspension ClampSuspension Clamp
20Supply of Dead End ClampDead End Clamp
21Supply of Eye i HookEye i Hook
22Supply of Eye bolts for GuardingEye bolts for Guarding
23Supply of J hookJ hook
24Supply of LT Clamp For PCC or STP with Bolts and NutsLT Clamp For PCC or STP with Bolts and Nuts
25Supply of Pearcing ConnectorPearcing Connector
26Supply of Alluminium LUG 120 Sq.mm.Alluminium LUG 120 Sq.mm.
27Supply of Alluminium LUG 240 Sq.mm.Alluminium LUG 240 Sq.mm.
28Supply of Guarding AngelGuarding Angel
29Supply of Guarding Angel ClampGuarding Angel Clamp
30Carriage of 8.5 M PCC Pole From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 8.5 M PCC Pole
31Carriage of 9 M STP Pole SP55 Galvanised From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 9 M STP Pole SP 55 Galvanised
32Carriage of 11 M STP Pole SP 55 Galvanised From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 M STP Pole SP 55 Galvanised
33Carriage of 13 M STP Pole SP 55 Galvanised From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 13 M STP Pole SP 55 Galvanised
34Carriage of V Type Cross Arm for 11 KV From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department V Type Cross Arm for 11 KV
35Carriage of 11 KV Pin Insulator with Pin From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 KV Pin Insulator with Pin
36Carriage of Disc Insulator with Fitting TandC 45 KN From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department Disc Insulator with Fitting TandC 45 KN
37Carriage of 11 KV Fuse Set From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 KV Fuse Set
38Carriage of 11 KV TPMO with Polymer Insulator From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 KV TPMO with Polymer Insulator
39Carriage of Complete Stay 9GI Stay Rod 20x1800 mm, etc material From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department Complete Stay 9GI Stay Rod 20x1800 mm, stay wire 7 or 8 SWG, 10 KG, Stay Clamp, Bolt, nut and washer
40Carriage of Distribution Transformer 100 KVA From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department Distribution Transformer 100 KVA
41Carriage of Distribution Transformer 250 KVA From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department Distribution Transformer 250 KVA
42Carriage of ACSR RABBIT Conductor From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department ACSR RABBIT Conductor
43Carriage of ACSR weasel Conductor or Insulated Conductor as provided by Department From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department ACSR weasel Conductor or Insulated Conductor as provided by Department
44Carriage of M S Earthing Rod 20 x2540 mm From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department M S Earthing Rod 20 x2540 mm
45Carriage of LT AL. XLPE CABLE SIZE 1x240 Sq.mm. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department LT AL. XLPE CABLE SIZE 1x240 Sq.mm.
46Carriage of LT XLPE CABLE 1X120 Sq.mm. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department LT XLPE CABLE 1X120 Sq.mm.
47Carriage of 11 KV XLPE Cable 3x185 Sq.mm. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 KV XLPE Cable 3x185 Sq.mm.
48Carriage of LT AB Cable 3x120 1x95 1x16 Sq.mm. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department LT AB Cable 3x120 1x95 1x16 Sq.mm.
49Carriage of 33 KV XLPE Cable 3x300 Sq.mm. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 33 KV XLPE Cable 3x300 Sq.mm.
50Carriage of 11 KV XLPE Cable 3x300 Sq.mm. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 KV XLPE Cable 3x300 Sq.mm.
51Carriage of 11 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm.
52Carriage of 11 KV Indoor or Outdoor Jointing Kit Size 3x185 Sq.mm. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 KV Indoor or Outdoor Jointing Kit Size 3x185 Sq.mm.
53Carriage of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm.
54Carriage of 11 KV STRAIGHT THROUGH Size 3x185 Sq.mm. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 KV STRAIGHT THROUGH Size 3x185 Sq.mm.
55Carriage of 11 KV VCB for OG CTR 200by100by5A 350 MVA 1250 Amp. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 KV VCB for OG CTR 200by100by5A 350 MVA 1250 Amp.
56Carriage of 11 KV VCB IC CTR 600by300by5A 350 MVA 1250 Amp. From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department 11 KV VCB IC CTR 600by300by5A 350 MVA 1250 Amp.
57Carriage of G.I. Wire 6or8 SWG for Guarding From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department G.I. Wire 6 or 8 SWG for Guarding
58Carriage of Three Phase Distribution Box From ESC MNPCarriage following material from Centre Stores, Mainpuri to site of work Distance 00-20 Kms through the Kacha and Pakka road including the work of its loading and unloading at the respective ends as per RESPO manual and as per direction of Concern Executive Engineer including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work in the area of Concern Division under EDC MAINPURI, Material shall be provieded by Department Three Phase Distribution Box
59Erection of Fixing of L.T. Fuse Set Protection Box with all respective Accessories As per NormsFixing of L.T. Fuse Set Protection Box with all respective Accessories As per Norms
60Execution of Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per NormsChemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms
61Erection of L.T. Tail Less unit with all respective material as Grouted Angel with Fabrication work etc.L.T. Tail Less unit with all respective material as Grouted Angel with Fabrication work etc.
62Laying of ACSR RABBIT ConductorLaying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per RESPO norms. ACSR RABBIT Conductor
63Laying of ACSR weasel Conductor or Insulated Conductor as provided by DepartmentLaying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per RESPO norms. ACSR weasel Conductor or Insulated Conductor as provided by Department
64Laying of LT AB Cable 3x120 1x95 1x16 Sq.mm.Laying, stringing, sagging, with All Respective Material Clamp with Nut and Bolts Suspension Clamp Eye J Hook Pearcing Connector etc of following conductor Cable on the erected supports, as per RESPO norms. LT AB Cable 3x120 1x95 1x16 Sq.mm.
65Mounting of Three Phase Distribution BoxMounting of Three Phase Distribution Box with Clamp nut & Bolts and Make Proper Connection with Connecting Cable.
66Erection of Double pole structureErection of Double pole structure 11 Mtr STP Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 22 Nos Pole At Different Location Under Concern Division.
67Erection of single pole structureErection of single pole structure 8.5 Mtrs PCC Pole, 9 Mtr ST, 11 Mtr ST Pole, 13 Mtr ST by digging of pits fitting of all relevant accessories as per RESPO norms. At Different Location Under Concern Division.
68Grouting of PCC or STP POLEGrouting of PCC or STP POLE Long As per Respo Norms with Material Cement, Sand, Blast Stone with the ratio 0.268 Cu.m. each will be provided by conractor
69Grouting of StayGrouting of Stay As per Respo Norms Cement, Sand, Blast Stone material will be provided by conractor
70Earthing of poleEarthing of pole by M S Earthing Rod 20 x2540 mm with 6 SWG earthing wire etc and make Proper Connection.
71Guarding of 11 KV Line with Gaurding Angel etcGuarding of 11 KV Line with Gaurding Angel, Clamp Eye Bolts and Gaurding G.I. Wire 6 or 8 SWG 60 SPAN
72Fencing of Distribution TransformersFencing of Distribution Transformers with Enamel in proper alignment as per RESPO manual and as per direction of Executive engineer including the cost of arrangement of labour, T and P, carrier etc. required for proper completion of work.
73Make Plinth for 250 KVA Transformer Proper Size As per Resspo NormsMake Plinth for 250 KVA Transformer Proper Size As per Resspo Norms
74Installation of 11by0.4 KV TF 100 KVAInstallation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work. 11by0.4 KV TF 100 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
75Installation of 11by0.4 KV TF 250 KVAInstallation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work. 11by0.4 KV TF 250 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
76Laying of 11 KV XLPE Cable 3x185 Sq.mm.Laying of Following Cable including digging and restoring along with Brick and Sand including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work. At Different Location Under Concern Division.11 KV XLPE Cable 3x185 Sq.mm.
77Laying of 11 KV XLPE Cable 3x300 Sq.mm.Laying of Following Cable including digging and restoring along with Brick and Sand including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work. At Different Location Under Concern Division. 11 KV XLPE Cable 3x300 Sq.mm.
78Laying of 33 KV XLPE Cable 3x300 Sq.mm.Laying of Following Cable by HDD Method with HDPE Pipe 140 mm. including digging and restoring along with Brick and Sand including the cost of arrangement of labour, TandP, carrier etc. required for proper completion of work. 33 KV XLPE Cable 3x300 Sq.mm.
79Installation Of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.Installation Of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.
80Installation Of 11 KV Indoor or Outdoor Jointing Kit Size 3x185 Sq.mm. As per Norms.Installation Of 11 KV Indoor or Outdoor Jointing Kit Size 3x185 Sq.mm. As per Norms.
81Installation Of 11 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.Installation Of 11 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.
82Installation Of 11 KV Straight Through Size 3x185 Sq.mm. As per Norms.Installation Of 11 KV Straight Through Size 3x185 Sq.mm. As per Norms.
83Installation Of 11 KV VCB OG CTR 200by100by5A 350 MVA 1250 Amp.Installation Of 11 KV VCB OG CTR 200by100by5A 350 MVA 1250 Amp. and Make Proper Connection As per Norms.
84Installation Of 11 KV VCB IC CTR 600by300by5A 350 MVA 1250 Amp.Installation Of 11 KV VCB IC CTR 600by300by5A 350 MVA 1250 Amp. and Make Proper Connection As per Norms.
85Dismentlling of Old and Damaged Cable of Different SizeDismentlling of Old and Damaged Cable of Different Size including with rolling Received Back and Safe Carriage from Pit Site to ESC, Mainpuri
86Received Back of Distribution Transformer after Increasing CapacityReceived Back of Distribution Transformer after Increasing Capacity from pit site to ESC, Mainpuri 30 Nos 100 KVA

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download 49088b13-7008-4dbd-96a2-887553f9e9e2.pdf Tender Documents 0 KB
Download 9345733_Boq_1.xlsx Tender Documents 0 KB
Download pqcfinal_2026-05-18-16-09-53_7fb0087cb259345ab4e0969cd4c6f8b0.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.