Indian Tenders

Tender Notice

TDR 55583935
Tendering Authority Uttar Pradesh Power Corporation Limited
Tender No GEM/2026/B/7553303
Tender ID GEM/2026/B/7553303
Tender Brief Bids Are invited for Boqbhogaon
City Mainpuri
State Uttar Pradesh
Document Fees Refer document
EMD INR 70000.0 /-
Tender Value INR 70 Lakhs /-
Tender Type Reverse Auction
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Boqbhogaon Supply Of 11 Kv V Type Cross Arm Cl With Bolts And Nuts - Cl For 11 Kv V Type Cross Arm With Bolts And Nuts , Supply Of Three Phase Distribution Box Cl With Nut And Bolts - Three Phase Distribution Box Cl With Nut And Bolts , Supply Of Connecting Cable For Db 1X35 Sq.Mm. - Connecting Cable For Distribution Box 1X35 Sq.Mm. , Supply Of L.T. Fuse Set Protection Box With All Accessories - L.T. Fuse Set Protection Box With All Accessories , Supply Of Tinned Copper Fuse Wire Different Size - Tinned Copper Fuse Wire Different Size , Supply Of Hdpe Pipe 140 Mm. - Hdpe Pipe 140 Mm. , Supply Of Stone Pad 300X300x75 - Stone Pad 300X300x75 , Supply Of Holding Cl For Doulble Pole Unit With Nut And Bolts - Holding Cl For Doulble Pole Unit With Nut And Bolts , Supply Of Ms Angle 75X75x6x2028mm With Cl And Bolt And Nut - Ms Angle 75X75x6x2028mm With Cl And Bolt And Nut T Or F Base , Supply Of T Off Chhanel T Off Cl With Nut And Bolts - T Off Chhanel And T Off Cl With Nut And Bolts , Supply Of Top Chhanel 125X65x240 - Top Chhanel 125X65x240 , Supply Of Dropper Channel 100X50x2028 Mm - Dropper Channel 100X50x2028 Mm. , Supply Of Danger Board With Cl And Nut And Bolt - Danger Board With Cl And Nut And Bolt , Supply Of G.I. Patti Cl Nut And Bolts As Per Norms , Supply Of L.T. Tail Less Unit With All Respective Material - L.T. Tail Less Unit With All Respective Material Angel, Patti And Other Material , Supply Of Copper L Pieace 62X225x12mm. - Copper L Pieace 62X225x12mm. , Supply Of 11 Kv F Cl With Nut And Bolts - 11 Kv F Cl With Nut And Bolts , Supply Of Suspension Cl - Suspension Cl , Supply Of Dead End Cl - Dead End Cl , Supply Of Eye I Hook - Eye I Hook , Supply Of Eye Bolts For Guarding - Eye Bolts For Guarding , Supply Of J Hook - J Hook , Supply Of Lt Cl For Pcc Or Stp With Bolts And Nuts - Lt Cl For Pcc Or Stp With Bolts And Nuts , Supply Of Pearcing Connector - Pearcing Connector , Supply Of Alluminium Lug 120 Sq.Mm. - Alluminium Lug 120 Sq.Mm. , Supply Of Alluminium Lug 240 Sq.Mm. - Alluminium Lug 240 Sq.Mm. , Supply Of Alluminium Lug 400 Sq.Mm. - Alluminium Lug 400 Sq.Mm. , Supply Of Nut Bolts And Washers Off Size - Nut Bolts And Washers Off Size , Supply Of Guarding Angel - Guarding Angel , Supply Of Guarding Angel Cl - Guarding Angel Cl , Supply Of M.S. Angel Iron 65X65x6 Mm. 2700 Mm Long Bracing - M.S. Angel Iron 65X65x6 Mm. 2700 Mm Long Bracing With 4 Nos Cl With Nut And Bolts , Carriage Of 13 M Stp Pole Sp55 Galvanised From Esc Mnp - 13 M Stp Pole Sp55 Galvanised , Carriage Of 8.5 M Pcc Pole From Esc Mnp - 8.5 M Pcc Pole , Carriage Of V Type Cross Arm For 11 Kv From Esc Mnp - V Type Cross Arm For 11 Kv , Carriage Of 11 Kv Pin Insulator With Pin From Esc Mnp - 11 Kv Pin Insulator With Pin , Carriage Of Disc Insulator With Fitting T And C 45 Kn 114 Nos And 70Kn 27 Nos From Esc Mnp - Disc Insulator With Fitting T And C 45 Kn 114 Nos And 70Kn 27 Nos , Carriage Of 11 Kv Fuse Set From Esc Mnp - 11 Kv Fuse Set , Carriage Of 11 Kv Tpmo With Polymer Insulator From Esc Mnp - 11 Kv Tpmo With Polymer Insulator , Carriage Of Complete Stay 9Gi Stay Rod 20X1800 Mm Etc Material From Esc Mnp - Complete Stay 9Gi Stay Rod 20X1800 Mm Stay Wire 7 And 8 Swg 10 Kg Stay Cl Bolt Nut And Washer , Carriage Of Distribution Transformer 25 Kva From Esc Mnp - Distribution Transformer 25 Kva , Carriage Of Distribution Transformer 63 Kva From Esc Mnp - Distribution Transformer 63 Kva , Carriage Of Distribution Transformer 100 Kva From Esc Mnp - Distribution Transformer 100 Kva , Carriage Of Distribution Transformer 250 Kva From Esc Mnp - Distribution Transformer 250 Kva , Carriage Of Acsr Weasel Conductor From Esc Mnp - Acsr Weasel Conductor Or Insulated Conductor As Provided By Department , Carriage Of M S Earthing Rod 20 X2540 Mm From Esc Mnp - M S Earthing Rod 20 X2540 Mm , Carriage Of Lt Al. Xlpe Cable Size 1X240 Sq.Mm. From Esc Mnp - Lt Al. Xlpe Cable Size 1X240 Sq.Mm. , Carriage Of Lt Xlpe Cable 1X120 Sq.Mm. For Dtr From Esc Mnp - Lt Xlpe Cable 1X120 Sq.Mm. For Dtr , Carriage Of Lt Xlpe Cable 1X400 Sq.Mm. For Dtr From Esc Mnp - Lt Xlpe Cable 1X400 Sq.Mm. For Dtr , Carriage Of Lt Xlpe Cable Size 3.5X70 Or 35 Sq.Mm. From Esc Mnp - Lt Xlpe Cable Size 3.5X70 Or 35 Sq.Mm. , Carriage Of Lt Ab Cable 3X120 1X95 1X16 Sq.Mm. From Esc Mnp - Lt Ab Cable 3X120 1X95 1X16 Sq.Mm. , Carriage Of Lt Ab Cable 3X50 1X35 1X16 Sq.Mm. From Esc Mnp - Lt Ab Cable 3X50 1X35 1X16 Sq.Mm. , Carriage Of Lt Ab Cable 3X95 1X70 1X16 Sq.Mm. From Esc Mnp - Lt Ab Cable 3X95 1X70 1X16 Sq.Mm. , Carriage Of 33 Kv Xlpe Cable 3X300 Sq.Mm. From Esc Mnp - 33 Kv Xlpe Cable 3X300 Sq.Mm. , Carriage Of 33 Kv Indoor Or Outdoor Jointing Kit Size 3X300 Sq.Mm. From Esc Mnp - 33 Kv Indoor Or Outdoor Jointing Kit Size 3X300 Sq.Mm. , Carriage Of 33 Kv Straight Through Size 3X300 Sq.Mm. From Esc Mnp - 33 Kv Straight Through Size 3X300 Sq.Mm. , Carriage Of G.I. Wire 6 Or 8 Swg For Guarding From Esc Mnp - G.I. Wire 6 Or 8 Swg For Guarding , Carriage Of Three Phase Distribution Box From Esc Mnp - Three Phase Distribution Box , Erection Of Fixing Of Lt Fuse Set Protection Box With All Respective Accessories As Per Norms - Fixing Of L.T. Fuse Set Protection Box With All Respective Accessories As Per Norms , Execution Of Chemical Earthing With G.I. Patti Cl Nut And Bolts As Per Norms , Erection Of L.T. Tail Less Unit With All Respective Material As Grouted Angel With Fabrication Work Etc. - L.T. Tail Less Unit With All Respective Material As Grouted Angel With Fabrication Work Etc. , Laying Of Acsr Weasel Conductor - Laying, Stringing, Sagging, Binding And Jumpering Etc Of Following Conductor On The Erected Supports, As Per Respo Norms. Acsr Weasel Conductor Or Insulated Conductor As Provided By Department , Laying Of Lt Ab Cable 3X120 1X95 1X16 Sq.Mm. - Laying, Stringing, Sagging, With All Respective Material Cl With Nut & Bolts Or Suspension Cl Or Eye Or J Hook Or Pearcing Connector Etc Of Following Conductor Or Cable On The Erected Supports, As Per Respo Norms. Lt Ab Cable 3X120 1X95 1X16 Sq.Mm. , Laying Of Lt Ab Cable 3X50 1X35 1X16 Sq.Mm. - Laying, Stringing, Sagging, With All Respective Material Cl With Nut & Bolts Or Suspension Cl Or Eye Or J Hook Or Pearcing Connector Etc Of Following Conductor Or Cable On The Erected Supports, As Per Respo Norms. Lt Ab Cable 3X50 1X35 1X16 Sq.Mm , Laying Of Lt Ab Cable 3X95 1X70 1X16 Sq.Mm. - Laying, Stringing, Sagging, With All Respective Material Cl With Nut & Bolts Or Suspension Cl Or Eye Or J Hook Or Pearcing Connector Etc Of Following Conductor Or Cable On The Erected Supports, As Per Respo Norms. Lt Ab Cable 3X95 1X70 1X16 Sq.Mm. , Mounting Of Three Phase Distribution Box - Mounting Of Three Phase Distribution Box With Cl Nut & Bolts And Make Proper Connection With Connecting Cable. , Erection Of Double Pole Structure 8.5 Mtr Pcc Pole - Erection Of Double Pole Structure 8.5 Mtr Pcc Pole By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. 34 Nos Pole At Different Location Under Concern Division. , Erection Of Single Pole Structure 8.5 Mtrs Pcc Pole - Erection Of Single Pole Structure 8.5 Mtrs Pcc Pole By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. At Different Location Under Concern Division. , Erection Of Tri Pole Structure 33 Kv 13 Mtr St Pole - Erection Of Tri Pole Structure 33 Kv 13 Mtr St Pole By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. 3 Nos Pole At Different Location Under Concern Division. , Grouting Of Pcc Or Stp Pole - Grouting Of Pcc Or Stp Pole Long As Per Respo Norms With Material Cement, Sand, Blast Stone With The Ratio 0.268 Cu.M. Each Will Be Provided By Conractor , Grouting Of Stay - Grouting Of Stay As Per Respo Norms Cement, Sand, Blast Stone Material Will Be Provided By Conractor , Earthing Of Pole - Earthing Of Pole By M S Earthing Rod 20 X2540 Mm With 6 Swg Earthing Wire Etc And Make Proper Connection. , Guarding Of 11 Kv Line - Guarding Of 11 Kv Line With Gaurding Angel, Cl Eye Bolts And Gaurding G.I. Wire 6 Or 8 Swg 30 Span , Fencing Of 250 Kva Distribution Transformers - Fencing Of Distribution Transformers With Enamel In Proper Alignment As Per Respo Manual And As Per Direction Of Executive Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Plinth For 250 Kva Transformer , Installation Of 11By0.4 Kv Tf 25 Kva - Installation Of The Following New Transformers At Various 11By0.4 Kv Substation, Under The Jurisdiction Of Concern Distribution Division, Mainpuri, In Proper Alignment And Direction And Making Proper Htbylt Connection As Per Instruction Of Executive Engineer After Carriage The Same From Centre Stores,Mainpuri Including The Work Of Safe Loading And Unloading At The Respective Ends And Also Including The Cost Of Arrangement Of Laborer, Tandp, Carrier Etc Required For Proper Completion Of Work.11By0.4 Kv Tf 25 Kva With L.T. Xlpe Cable Suitable Size With All Respective Material As Per Norms. , Installation Of 11By0.4 Kv Tf 63 Kva - Installation Of The Following New Transformers At Various 11By0.4 Kv Substation, Under The Jurisdiction Of Concern Distribution Division, Mainpuri, In Proper Alignment And Direction And Making Proper Htbylt Connection As Per Instruction Of Executive Engineer After Carriage The Same From Centre Stores,Mainpuri Including The Work Of Safe Loading And Unloading At The Respective Ends And Also Including The Cost Of Arrangement Of Laborer, Tandp, Carrier Etc Required For Proper Completion Of Work.11By0.4 Kv Tf 63 Kva With L.T. Xlpe Cable Suitable Size With All Respective Material As Per Norms. , Installation Of 11By0.4 Kv Tf 100 Kva - Installation Of The Following New Transformers At Various 11By0.4 Kv Substation, Under The Jurisdiction Of Concern Distribution Division, Mainpuri, In Proper Alignment And Direction And Making Proper Htbylt Connection As Per Instruction Of Executive Engineer After Carriage The Same From Centre Stores,Mainpuri Including The Work Of Safe Loading And Unloading At The Respective Ends And Also Including The Cost Of Arrangement Of Laborer, Tandp, Carrier Etc Required For Proper Completion Of Work.11By0.4 Kv Tf 100 Kva With L.T. Xlpe Cable Suitable Size With All Respective Material As Per Norms. , Installation Of 11By0.4 Kv Tf 250 Kva - Installation Of The Following New Transformers At Various 11By0.4 Kv Substation, Under The Jurisdiction Of Concern Distribution Division, Mainpuri, In Proper Alignment And Direction And Making Proper Htbylt Connection As Per Instruction Of Executive Engineer After Carriage The Same From Centre Stores,Mainpuri Including The Work Of Safe Loading And Unloading At The Respective Ends And Also Including The Cost Of Arrangement Of Laborer, Tandp, Carrier Etc Required For Proper Completion Of Work.11By0.4 Kv Tf 250 Kva With L.T. Xlpe Cable Suitable Size With All Respective Material As Per Norms. , Laying Of 33 Kv Xlpe Cable 3X300 Sq.Mm. - Laying Of Following Cable By Hdd Method With Hdpe Pipe (140 Mm.) Including Digging And Restoring Along With Brick And Sand Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. 33 Kv Xlpe Cable 3X300 Sq.Mm. , Installation Of 33 Kv Indoor Or Outdoor Jointing Kit Size 3X300 Sq.Mm. As Per Norms. , Dismentlling, Received Back And Safe Carriage Of Jarjar G.I. Wire And Weasel Conducter Including With Rolling From Pit Site To Esc, Mainpuri - Dismentlling Of Jarjar G.I. Wire And Weasel Conducter Including With Rolling Received Back And Safe Carriage From Pit Site To Esc, Mainpuri , Received Back Of Distribution Transformer After Increasing Capacity From Pit Site To Esc, Mainpuri - Received Back Of Distribution Transformer After Increasing Capacity From Pit Site To Esc, Mainpuri ( 17 Nos 100 Kva) Total Quantity : 21191

Key Dates

Publish Date 20-05-2026
Last Date of Bid Submission 10-06-2026
Tender Opening Date 10-06-2026

Contact Information

Company Name Uttar Pradesh Power Corporation Limited
Address 205001,Electricity Distribution Circle, Power House, Mainpuri

BOQ Items

Sl. No. Item TitleItem Description
1Supply of 11 KV V type cross arm Clamp with bolts and nutsClamp For 11 KV V type cross arm with bolts and nuts
2Supply of Three Phase Distribution Box Clamp with Nut and BoltsThree Phase Distribution Box Clamp with Nut and Bolts
3Supply of Connecting Cable for DB 1x35 Sq.mm.Connecting Cable for Distribution Box 1x35 Sq.mm.
4Supply of L.T. Fuse Set Protection Box with all AccessoriesL.T. Fuse Set Protection Box with all Accessories
5Supply of Tinned Copper Fuse Wire Different SizeTinned Copper Fuse Wire Different Size
6Supply of HDPE PIPE 140 MM.HDPE PIPE 140 MM.
7Supply of Stone Pad 300x300x75Stone Pad 300x300x75
8Supply of Holding Clamp for Doulble Pole Unit with Nut and BoltsHolding Clamp for Doulble Pole Unit with Nut and Bolts
9Supply of MS Angle 75x75x6x2028mm with clamp and Bolt and nutMS Angle 75x75x6x2028mm with clamp and Bolt and nut T or F base
10Supply of T Off Chhanel T off Clamp with Nut and BoltsT Off Chhanel and T off Clamp with Nut and Bolts
11Supply of Top Chhanel 125x65x240Top Chhanel 125x65x240
12Supply of Dropper Channel 100x50x2028 mmDropper Channel 100x50x2028 mm.
13Supply of Danger Board With Clamp and Nut and BoltDanger Board With Clamp and Nut and Bolt
14Supply of G.I. Patti Clamp Nut and Bolts as per NormsChemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms
15Supply of L.T. Tail Less unit with all respective materialL.T. Tail Less unit with all respective material Angel, Patti and other Material
16Supply of Copper L Pieace 62x225x12mm.Copper L Pieace 62x225x12mm.
17Supply of 11 KV F Clamp with Nut and Bolts11 KV F Clamp with Nut and Bolts
18Supply of Suspension ClampSuspension Clamp
19Supply of Dead End ClampDead End Clamp
20Supply of Eye i HookEye i Hook
21Supply of Eye bolts for GuardingEye bolts for Guarding
22Supply of J hookJ hook
23Supply of LT Clamp For PCC or STP with Bolts and NutsLT Clamp For PCC or STP with Bolts and Nuts
24Supply of Pearcing ConnectorPearcing Connector
25Supply of Alluminium LUG 120 Sq.mm.Alluminium LUG 120 Sq.mm.
26Supply of Alluminium LUG 240 Sq.mm.Alluminium LUG 240 Sq.mm.
27Supply of Alluminium LUG 400 Sq.mm.Alluminium LUG 400 Sq.mm.
28Supply of Nut bolts and washers Off SizeNut bolts and washers Off Size
29Supply of Guarding AngelGuarding Angel
30Supply of Guarding Angel ClampGuarding Angel Clamp
31Supply of M.S. Angel Iron 65x65x6 mm. 2700 mm Long BracingM.S. Angel Iron 65x65x6 mm. 2700 mm Long Bracing with 4 Nos Clamp with Nut and Bolts
32Carriage of 13 M STP Pole SP55 Galvanised from ESC MNP13 M STP Pole SP55 Galvanised
33Carriage of 8.5 M PCC Pole from ESC MNP8.5 M PCC Pole
34Carriage of V Type Cross Arm for 11 KV from ESC MNPV Type Cross Arm for 11 KV
35Carriage of 11 KV Pin Insulator with Pin from ESC MNP11 KV Pin Insulator with Pin
36Carriage of Disc Insulator with Fitting T and C 45 KN 114 NOS AND 70KN 27 NOS from ESC MNPDisc Insulator with Fitting T and C 45 KN 114 NOS AND 70KN 27 NOS
37Carriage of 11 KV Fuse Set from ESC MNP11 KV Fuse Set
38Carriage of 11 KV TPMO with Polymer Insulator from ESC MNP11 KV TPMO with Polymer Insulator
39Carriage of Complete Stay 9GI Stay Rod 20x1800 mm etc material from ESC MNPComplete Stay 9GI Stay Rod 20x1800 mm stay wire 7 and 8 SWG 10 KG Stay Clamp Bolt nut and washer
40Carriage of Distribution Transformer 25 KVA from ESC MNPDistribution Transformer 25 KVA
41Carriage of Distribution Transformer 63 KVA from ESC MNPDistribution Transformer 63 KVA
42Carriage of Distribution Transformer 100 KVA from ESC MNPDistribution Transformer 100 KVA
43Carriage of Distribution Transformer 250 KVA from ESC MNPDistribution Transformer 250 KVA
44Carriage of ACSR weasel Conductor from ESC MNPACSR weasel Conductor or Insulated Conductor as provided by Department
45Carriage of M S Earthing Rod 20 x2540 mm from ESC MNPM S Earthing Rod 20 x2540 mm
46Carriage of LT AL. XLPE CABLE SIZE 1x240 Sq.mm. from ESC MNPLT AL. XLPE CABLE SIZE 1x240 Sq.mm.
47Carriage of LT XLPE CABLE 1X120 Sq.mm. FOR DTR from ESC MNPLT XLPE CABLE 1X120 Sq.mm. FOR DTR
48Carriage of LT XLPE CABLE 1X400 Sq.mm. FOR DTR from ESC MNPLT XLPE CABLE 1X400 Sq.mm. FOR DTR
49Carriage of LT XLPE Cable Size 3.5x70 or 35 Sq.mm. from ESC MNPLT XLPE Cable Size 3.5x70 or 35 Sq.mm.
50Carriage of LT AB Cable 3x120 1x95 1x16 Sq.mm. from ESC MNPLT AB Cable 3x120 1x95 1x16 Sq.mm.
51Carriage of LT AB Cable 3x50 1x35 1x16 Sq.mm. from ESC MNPLT AB Cable 3x50 1x35 1x16 Sq.mm.
52Carriage of LT AB Cable 3x95 1x70 1x16 Sq.mm. from ESC MNPLT AB Cable 3x95 1x70 1x16 Sq.mm.
53Carriage of 33 KV XLPE Cable 3x300 Sq.mm. from ESC MNP33 KV XLPE Cable 3x300 Sq.mm.
54Carriage of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. from ESC MNP33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm.
55Carriage of 33 KV Straight Through Size 3x300 Sq.mm. from ESC MNP33 KV Straight Through Size 3x300 Sq.mm.
56Carriage of G.I. Wire 6 or 8 SWG for Guarding from ESC MNPG.I. Wire 6 or 8 SWG for Guarding
57Carriage of Three Phase Distribution Box from ESC MNPThree Phase Distribution Box
58Erection of Fixing of LT Fuse Set Protection Box with all respective Accessories As per NormsFixing of L.T. Fuse Set Protection Box with all respective Accessories As per Norms
59Execution of Chemical Earthing with G.I. Patti Clamp Nut and Bolts as per NormsChemical Earthing with G.I. Patti Clamp Nut and Bolts as per Norms
60Erection of L.T. Tail Less unit with all respective material as Grouted Angel with Fabrication work etc.L.T. Tail Less unit with all respective material as Grouted Angel with Fabrication work etc.
61Laying of ACSR weasel ConductorLaying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per RESPO norms. ACSR weasel Conductor or Insulated Conductor as provided by Department
62Laying of LT AB Cable 3x120 1x95 1x16 Sq.mm.Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x120 1x95 1x16 Sq.mm.
63Laying of LT AB Cable 3x50 1x35 1x16 Sq.mm.Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x50 1x35 1x16 Sq.mm
64Laying of LT AB Cable 3x95 1x70 1x16 Sq.mm.Laying, stringing, sagging, with All Respective Material Clamp with Nut & Bolts or Suspension Clamp or Eye or J Hook or Pearcing Connector etc of following conductor or Cable on the erected supports, as per RESPO norms. LT AB Cable 3x95 1x70 1x16 Sq.mm.
65Mounting of Three Phase Distribution BoxMounting of Three Phase Distribution Box with Clamp nut & Bolts and Make Proper Connection with Connecting Cable.
66Erection of Double pole structure 8.5 Mtr PCC PoleErection of Double pole structure 8.5 Mtr PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 34 Nos Pole At Different Location Under Concern Division.
67Erection of single pole structure 8.5 Mtrs PCC PoleErection of single pole structure 8.5 Mtrs PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. At Different Location Under Concern Division.
68Erection of TRI pole structure 33 KV 13 Mtr ST PoleErection of TRI pole structure 33 KV 13 Mtr ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 3 Nos Pole At Different Location Under Concern Division.
69Grouting of PCC or STP POLEGrouting of PCC or STP POLE Long As per Respo Norms with Material Cement, Sand, Blast Stone with the ratio 0.268 Cu.m. each will be provided by conractor
70Grouting of StayGrouting of Stay As per Respo Norms Cement, Sand, Blast Stone material will be provided by conractor
71Earthing of poleEarthing of pole by M S Earthing Rod 20 x2540 mm with 6 SWG earthing wire etc and make Proper Connection.
72Guarding of 11 KV LineGuarding of 11 KV Line with Gaurding Angel, Clamp Eye Bolts and Gaurding G.I. Wire 6 or 8 SWG 30 SPAN
73Fencing of 250 KVA Distribution TransformersFencing of Distribution Transformers with Enamel in proper alignment as per RESPO manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
74Plinth for 250 KVA TransformerPlinth for 250 KVA Transformer Proper Size As per Resspo Norms
75Installation of 11by0.4 KV TF 25 KVAInstallation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 25 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
76Installation of 11by0.4 KV TF 63 KVAInstallation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 63 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
77Installation of 11by0.4 KV TF 100 KVAInstallation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 100 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
78Installation of 11by0.4 KV TF 250 KVAInstallation of the Following new transformers at various 11by0.4 KV substation, under the jurisdiction of Concern Distribution Division, Mainpuri, in proper alignment and direction and making proper HTbyLT connection as per instruction of Executive Engineer after carriage the same from Centre Stores,Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, TandP, carrier etc required for proper completion of work.11by0.4 KV TF 250 KVA with L.T. XLPE Cable Suitable Size with all respective material as per Norms.
79Laying of 33 KV XLPE Cable 3x300 Sq.mm.Laying of Following Cable by HDD Method with HDPE Pipe (140 mm.) including digging and restoring along with Brick and Sand including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 33 KV XLPE Cable 3x300 Sq.mm.
80Installation Of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.Installation Of 33 KV Indoor or Outdoor Jointing Kit Size 3x300 Sq.mm. As per Norms.
81Dismentlling, Received Back and Safe Carriage of Jarjar G.I. Wire and Weasel Conducter including with rolling from Pit Site to ESC, MainpuriDismentlling of Jarjar G.I. Wire and Weasel Conducter including with rolling Received Back and Safe Carriage from Pit Site to ESC, Mainpuri
82Received Back of Distribution Transformer after Increasing Capacity from pit site to ESC, MainpuriReceived Back of Distribution Transformer after Increasing Capacity from pit site to ESC, Mainpuri ( 17 Nos 100 KVA)

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download 917694b3-41d8-4600-8c49-59ed8b38fd5a.pdf Tender Documents 0 KB
Download 9344058_Boq_1.xlsx Tender Documents 0 KB
Download pqcfinal_2026-05-18-13-03-52_8f9e0a472e96f9c00b3a708bacfb2f8b.pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.