| 1 | Dismantling of old and damage Brick work including stacking of materials.[SI.No.692] |
| 2 | Dismentling of old and damaged plaster |
| 3 | Dismantling of old and damage PCC work including stacking of materials.[SI.No.694] |
| 4 | Excavatin in foundation in ordinarry soiel.[SI.No.273] |
| 5 | Laying base concrete in 1:6:12 c/fs/bb mortar. [SI.No.273] |
| 6 | M-150 Brick work in 1:4 c/cs mortar in foundation including all complete. [SI.No.305] |
| 7 | M-150 Brick work in 1:4 c/cs mortar in sduper structure including all complete. [SI.No.309] |
| 8 | 12mm thick Plaster in 1:4 c/cs mortar. [SI.No.584a] |
| 9 | Earth work in Filling with Ordinary Soil includingcartage upto 8km [SI. No. 253+261+231a] |
| 10 | RCC work in 1:1.5:3 c/cs/sg for slab and wall all complete. [SI.No.284] |
| 11 | MS or Iron work such as reinforcement. |
| 12 | Marble Fountain as per slected outdoor fountain with motorpump, plumbing work , light transport ,instalation charge all work compleate with T&P etc. |
| 13 | Providing and fixing stainless steel work welding,rubbing,pollishing,grindimg,buffing and making curvature all work compleate with T&P etc.[SI N0 10.27] |
| 14 | Cement Concrete work in 1:1.5:3 c/cs/sg. Including all complete.[ SI. No. 1, new item 9a,Ch.no. 20] |
| 15 | Providing and laying 18 mm thick flamed finish granite flooring black,cherry ,ruby red all work compleate with T&P etc. [DSR No 11.56.1] |
| 16 | S/f of framing structure with fabrication,cnc cutting,work for precision design and aesthetics application of high quality powder coating for rust protection and durability.incorporation of nagar nigam logo and name acrylic laser cut letters with painting all comp of work |
| 17 | MS Heavy size as nut ,bolt plate and other part all work compleate with T&P etc. |
| 18 | S/F of Ornamentel stone strcture at top of gate at site all work compleate. |
| 19 | Add cost for varicating and other misclenious work all work compleate. |
| 20 | S/F of steel metal lettet writing work all work compleate. |
| 21 | Add cost for point light and other work all compleate. |
| 22 | Supply and Fixing of Wall 3D Wall Painting All complete With T&P etc. |
| 23 | S/F of marble stone sign board at site. |
| 24 | Cleaning of site during work, Dismantling ramps, Photo of site. Please Enable Macros to View BoQ information |