TDR 55576241
Tendering Authority Uttar Pradesh Power Corporation Limited
Tender No GEM/2026/B/7556052
Tender ID GEM/2026/B/7556052
Tender Brief Bids Are invited for Custom Bid For Services - Increasing Capacity Of Distribution Transformers And Installation Of New Distribution Transformers On Semi-Turnkey Basis In Business Plan 2026- 27 Under The Area Of Edd, Kheragarh, Agra - (Part-A) Supply
City Agra
State Uttar Pradesh
Document Fees Refer document
EMD INR 52000.0 /-
Tender Value INR 51.67 Lakhs /-
Tender Type Reverse Auction
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Custom Bid For Services - Increasing Capacity Of Distribution Transformers And Installation Of New Distribution Transformers On Semi-Turnkey Basis In Business Plan 2026- 27 Under The Area Of Edd, Kheragarh, Agra - (Part-A) Supply & Erection Providing & Fixing Of Dropper Channel , Providing & Fixing Of Stone Pad , Providing & Fixing Of Cl S For Lt T-Off With Bolts & Nuts , Providing & Fixing Of Holding Cl S For Top Channel Tpmo & Fuse Set , Providing & Fixing Of Ms Base Angle , Providing & Fixing Of Ms Top Channel , Providing & Fixing Of Ms T-Off Channel , Providing & Fixing Of Danger Board , Providing & Fixing Of Barbed Wire , Providing & Fixing Of Suspension Cl , Providing & Fixing Of I Hook , Providing & Fixing Of J Hook , Providing & Fixing Of Dead End Cl , Providing & Fixing Of F-Cl For Pcc Pole , Providing & Fixing Of 11 Kv V Type Cross Arm Holding Cl , Providing & Fixing Of Copper L-Piece 62X225x12 Sqmm , Providing & Fixing Of Lt Incoming Panel With Metering Equipment & Fixing Arrangement , Providing & Fixing Of Copper L-Piece 50X225x10 Sqmm , Providing & Fixing Of Cl For Top Channel , Providing & Fixing Of Cl For Distribution Box , Providing & Fixing Of Alu. Lug Long Barrel Off Size , Providing & Fixing Of Cl For T-Off Channel , Providing & Fixing Of Piercing Connector , (Part-B) Carriage & Erection Carriage Of Pcc Pole 8.5 Mtr. Long. From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of 25 Kva T/F Fromelectricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of 63 Kva T/F Fromelectricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of 100 Kva T/F From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of 250 Kva T/F From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Cartiage Of Lt Xlpe Cable 1X400 Sqmm (420 Mtr), Lt Xlpe Cable 3.5X400 Sqmm (130 Mtr), Lt Xlpe Cable 1X240 Sqmm (40 Mtr), Lt Pvc Al. Cable 4X16 Sqmm (840) From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50Kms.) , Carriage Of Following Material From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50 Kms.) J) Line Material Viz. Lt Abc 3X95 Sqmm (12787 Mtr), Lt Abc 3X50 Sqmm (5490 Mtr), Weasal Conductor (4190 Mtr), Distribution Box (189), Stay Set Complete (191), Earthing Of Pole (206), 11 Kv Disc Insulator (408 Nos.), 11 Kv Disc Fitting (408 Nos.), 11 Kv Fuse Set (82 Nos), 11 Kv Pin Insulator With Pin (425 Nos), 11 Kv Tpmo (15 Nos), 11 Kv V Type Cross Arm (6), And Other Line Material, If Required. , Erection And Grouting Of Single Pole 8.5 Mtr. Long Pcc Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Double Pole 8.5 Mtr. Long Pcc Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Mounting & Installation Of 25 Kva T/F On Existing Dp In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Mounting & Installation Of 63 Kva T/F On Existing Dp In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Mounting & Installation Of 100 Kva T/F On Existing Dp In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Installation For 250 Kva T/F On Plinth In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Laying Of Lt Xlpe Cable 1X400 Sqmm (420 Mtr), Lt Xlpe Cable 3.5X400 Sqmm (130 Mtr), Lt Xlpe Cable 1X240 Sqmm (40 Mtr), Lt Pvc Cable 4X16 Sqmm (840), Lt Abc 3X95 Sqmm (12787 Mtr), Lt Abc 3X50 Sqmm (5490 Mtr), Overhead With Making Loop (At A Distance Of Approx. 4 Mtr.) As Per Respo Norms And Direction By Superivising Engineer. , Laying Sagging Stringing And Binding And Jumpering Of Acsr Weasal Conductor In Ht/Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. , Construction Of Plinth For 250 Kva Transformer Of Size 5X5x4 Above The Ground Lable And 1 Feet Below The Ground. At The Bottom There Shall Be Cc Pad Of Brick Ballast Of Size 5X5x3 Thick In Ratio 1:3:6 [Cement, Sand And Brick Ballast]. The First Class Brick Wall Work Shall Be 9 Thick In Ratio 1:4 [Cement And Sand]. The Hollow Portion Among The Wall Shall Be Filled Up With The Brick Ballast. On The Top Of The Wall Of Plint There Shall Be Rcc Work In Ratio 1:3:6 [Cement, Sand And Grit Stone] By Using 12 Mm Dai Ms Bar At Distance Of 9. There Shall Be Plastering All Over The Plinth 12 Mm Thick In Ratio 1:4 [Cement And Sand] Above The Ground Level. Proper Watering And Curing Of The Plinth Shall Be Carried Out As Per Direction Of Supervising Engineer. , Fencing Of 250 Kva T/Fs As Per Following Specification -Fabrication Of 50X50x6 Mm Size Ms Angle Frame Of Size 3000X2400mm With 450 Mm Long Angle For Grouting The Frame And Fixing Of 2X1.5, 10 Swg Welded Wire Mesh With Ms Strip Of 24X5mm Size All Round The Frame And Drilling 9 Mm Holes Insides Of Frames At As Distance Of 300Mm For Jointing Of Frame With The Help Of Boslts And Nuts Including Cost Of Material. The Width Of Panal May Vary As Per Site Conditions, Grouting And Fixing Of Angle Iron Frames In Ratio 1:2:4 (Cement, Coarse Sand And Stone Ballast ) In The Pocket Of 150X150x150mm All Round The Plinth And Bolting Of Frames With 25X8 Mm Size Bolts And Nuts, Making Main Gate In Front Of The Plinth Of Size 3000X2400 Mm By Making Two Leaves Of Size 3000X1200mm Size And Grouting The Same In Ratio And Method Mentioned At Item (B) Above Fixing With Hinges With Dandlas For Locking System & Painting Of Entire Wire Mesh Angle Iron Etc. With Bus Green Super Enamelled Pain In Two Coats On The Primer Two Coats Of Red Oxide. , Earthing Of 250 Kva Distribution Transformer By Maintenance Free Earthing Electrods (Chemical) By Digging Pits 6 Dia 3Mtr. Deep Including Inserting Pipe In Pipe Technology Concept Involve Two Mild Steel Pipes One Inserted Inside The Other Of Size ;- 1. Inner Pip Dia Meter 50 Mm. 2. Outer Pipe Dia Meter 100 Mm. Length Of The Both Pipe Shall Be 3000 Mm. The M.S.Pipe Shall Be Isi Mark Of Class B As Per Is 1239. Thickness Of The Pipe Shall Be 12 Swg. The Empty Space In The Pipe Shall Be Filled With The Specially Developed Crystalline Material Conductiv Mixture Such As Copper And Aluminimum Powder.Conductive Carbon And Bonding Material Etc. Mixed In Diffrent Proportions. Conductive Mixture Contents Shall Be 70 % Carbon Powder & 30% Metal Powder Preferably Pure Copper Or Aluminum Material Along With The Required Quantity Of Bonding Materials. Granule Size Of The Carbon & Metal Powder Shall Be 100 Mesh. The Mixture If Forced (Pressurized) Inside The Earth Electrode In Empty Space Of Inner Pipe & In Empty Space Between The Inner & Outer Pipe Of The Earth Electrode, In Paste Form And After Soldification Of The Same The Bottom End Cap As Well As Top End Cap Is Provided. The Mixture Shall Be Pressed By Machine In The Pipe. Precaution Shall Be Taken Has To Have No Air Gap Inside The Pipe While Pressing. The Back Fill Compound (Earth Enhancment Material ) Shall Be Superior Conductive Material That Improves Earthing Effectiveness Especially In Areas Of Poor Conductivity Such As Rocky Ground, Sandy Soil & Areas Of Moisture Varation. It May Contain Conductive Cement (20%) Graphite Carbon Powder(50%), Hydrous Aluminum Siliacate (10%), Sodium Montmorillonite (20%) Etc. It Shall Be Placed Around Earth Electrode In The Earth Pit To Improve The Conductive Of Earth Electrode & Ground Contact Area. Mild Steel Electro Galavanized Flat 50X6 Mm Shall Welded To Earth Electrode Pips & Connected With Trasnformer Neutral And Body As Below With The Hlep Of Steel Nut & Bolt Or Through Welding As Per Requirment Of Site, To Gi Pipe And Filling Of Chemical Mixutre Around The Gi Pipe Upto 3 Mtr. Including Making Of Chamber & Connecting The Top Of The Inserted Pipe With Transformer Body & Neutral Through M.S.Flat 50X6mm With The Help Of Nut & Bolt Or Through Welding And Making A Main Hole Of Size 2×2 And Covering The Same By A Stone Pad For The Purpose Of Poring Water For Moisture. , Fixing Of Distribution Box With Cl On Errected Pole For Giving Supply To Consumer By Connecting Consumer Cables. , Installation Of Stay Set Complete As Direction By Supervising Engineer. , Concreting Of Pole As Direction By Supervising Engineer. All Required Mateial Provide By The Contractor At His Own Cost. , Fixing Of Earthing Pole As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Installation Of 11 Kv Tpmo As Direction By Supervising Engineer. , Installation Of 11 Kv Fuse Set As Direction By Supervising Engineer. , Fixing Of11 Kv V Type Cross Arm As Direction By Supervising Engineer. , Fixing Of 11 Kv Disc Insulator As Direction By Supervising Engineer. , Fixing Of 11 Kv Disc Fitting As Direction By Supervising Engineer. , Fixing Of 11 Kv Pin Insulator With Pin As Direction By Supervising Engineer. , Dismentling & Removal Of 10/16 Kva T/F And Recived Back To Ele. Store Center Taj Agra , Dismentling & Removal Of 100 Kva T/F And Recived Back To Ele. Store Center Taj Agra

Key Dates

Publish Date 20-05-2026
Last Date of Bid Submission 04-06-2026
Tender Opening Date 04-06-2026

Contact Information

Company Name Uttar Pradesh Power Corporation Limited
Address 282005,EDC-I , B-690 Kamla Nagar, Agra

BOQ Items

Sl. No. Item TitleItem Description
1(Part-A) Supply & Erection Providing & Fixing of Dropper Channel(Part-A) Supply & Erection Providing & Fixing of Dropper Channel
2Providing & Fixing of Stone padProviding & Fixing of Stone pad
3Providing & Fixing of Clamps for LT T-off with bolts & nutsProviding & Fixing of Clamps for LT T-off with bolts & nuts
4Providing & Fixing of Holding Clamps for Top Channel TPMO & Fuse SetProviding & Fixing of Holding Clamps for Top Channel TPMO & Fuse Set
5Providing & Fixing of MS Base AngleProviding & Fixing of MS Base Angle
6Providing & Fixing of MS Top ChannelProviding & Fixing of MS Top Channel
7Providing & Fixing of MS T-off ChannelProviding & Fixing of MS T-off Channel
8Providing & Fixing of Danger BoardProviding & Fixing of Danger Board
9Providing & Fixing of Barbed wireProviding & Fixing of Barbed wire
10Providing & Fixing of Suspension ClampProviding & Fixing of Suspension Clamp
11Providing & Fixing of I HookProviding & Fixing of I Hook
12Providing & Fixing of J HookProviding & Fixing of J Hook
13Providing & Fixing of Dead End ClampProviding & Fixing of Dead End Clamp
14Providing & Fixing of F-Clamp for PCC PoleProviding & Fixing of F-Clamp for PCC Pole
15Providing & Fixing of 11 kv V Type Cross Arm Holding ClampProviding & Fixing of 11 kv V Type Cross Arm Holding Clamp
16Providing & Fixing of Copper L-Piece 62x225x12 SQMMProviding & Fixing of Copper L-Piece 62x225x12 SQMM
17Providing & Fixing of LT Incoming Panel with Metering equipment & fixing arrangementProviding & Fixing of LT Incoming Panel with Metering equipment & fixing arrangement
18Providing & Fixing of Copper L-Piece 50x225x10 SQMMProviding & Fixing of Copper L-Piece 50x225x10 SQMM
19Providing & Fixing of Clamp for Top ChannelProviding & Fixing of Clamp for Top Channel
20Providing & Fixing of Clamp for Distribution BoxProviding & Fixing of Clamp for Distribution Box
21Providing & Fixing of Alu. Lug long barrel off sizeProviding & Fixing of Alu. Lug long barrel off size
22Providing & Fixing of Clamp for T-off ChannelProviding & Fixing of Clamp for T-off Channel
23Providing & Fixing of Piercing ConnectorProviding & Fixing of Piercing Connector
24(Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)(Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
25Carriage of 25 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of 25 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
26Carriage of 63 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of 63 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
27Carriage of 100 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of 100 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
28Carriage of 250 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of 250 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
29Cartiage of LT XLPE CABLE 1x400 sqmm (420 mtr), LT XLPE CABLE 3.5x400 sqmm (130 mtr), LT XLPE CABLE 1x240 sqmm (40 mtr), LT PVC Al. Cable 4x16 sqmm (840) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)Cartiage of LT XLPE CABLE 1x400 sqmm (420 mtr), LT XLPE CABLE 3.5x400 sqmm (130 mtr), LT XLPE CABLE 1x240 sqmm (40 mtr), LT PVC Al. Cable 4x16 sqmm (840) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
30Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Line material viz. LT ABC 3X95 SQMM (12787 mtr), LT ABC 3X50 SQMM (5490 mtr), Weasal conductor (4190 mtr), Distribution Box (189), Stay Set Complete (191), Earthing of Pole (206), 11 kv Disc Insulator (408 nos.), 11 KV Disc Fitting (408 nos.), 11 kv Fuse Set (82 nos), 11 kv Pin insulator with pin (425 nos), 11 KV TPMO (15 nos), 11 kv V Type Cross Arm (6), and other line material, if required.Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Line material viz. LT ABC 3X95 SQMM (12787 mtr), LT ABC 3X50 SQMM (5490 mtr), Weasal conductor (4190 mtr), Distribution Box (189), Stay Set Complete (191), Earthing of Pole (206), 11 kv Disc Insulator (408 nos.), 11 KV Disc Fitting (408 nos.), 11 kv Fuse Set (82 nos), 11 kv Pin insulator with pin (425 nos), 11 KV TPMO (15 nos), 11 kv V Type Cross Arm (6), and other line material, if required.
31Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
32Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
33Mounting & Installation of 25 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.Mounting & Installation of 25 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.
34Mounting & Installation of 63 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.Mounting & Installation of 63 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.
35Mounting & Installation of 100 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.Mounting & Installation of 100 KVA T/F on existing DP in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.
36Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.
37Laying of LT XLPE CABLE 1x400 sqmm (420 mtr), LT XLPE CABLE 3.5x400 sqmm (130 mtr), LT XLPE CABLE 1x240 sqmm (40 mtr), LT PVC Cable 4x16 sqmm (840), LT ABC 3X95 SQMM (12787 mtr), LT ABC 3X50 SQMM (5490 mtr), overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE CABLE 1x400 sqmm (420 mtr), LT XLPE CABLE 3.5x400 sqmm (130 mtr), LT XLPE CABLE 1x240 sqmm (40 mtr), LT PVC Cable 4x16 sqmm (840), LT ABC 3X95 SQMM (12787 mtr), LT ABC 3X50 SQMM (5490 mtr), overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer.
38Laying sagging stringing and binding and jumpering of ACSR Weasal conductor in HT/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.Laying sagging stringing and binding and jumpering of ACSR Weasal conductor in HT/LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
39Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.
40Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.
41Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
42Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables.Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables.
43Installation of Stay Set Complete as direction by supervising Engineer.Installation of Stay Set Complete as direction by supervising Engineer.
44Concreting of Pole as direction by supervising Engineer. All required mateial provide by the contractor at his own cost.Concreting of Pole as direction by supervising Engineer. All required mateial provide by the contractor at his own cost.
45Fixing of Earthing Pole as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Fixing of Earthing Pole as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
46Installation of 11 kv TPMO as direction by supervising Engineer.Installation of 11 kv TPMO as direction by supervising Engineer.
47Installation of 11 kv Fuse Set as direction by supervising Engineer.Installation of 11 kv Fuse Set as direction by supervising Engineer.
48Fixing of11 kv V Type Cross Arm as direction by supervising Engineer.Fixing of11 kv V Type Cross Arm as direction by supervising Engineer.
49Fixing of 11 kv Disc Insulator as direction by supervising Engineer.Fixing of 11 kv Disc Insulator as direction by supervising Engineer.
50Fixing of 11 KV Disc Fitting as direction by supervising Engineer.Fixing of 11 KV Disc Fitting as direction by supervising Engineer.
51Fixing of 11 kv Pin insulator with pin as direction by supervising Engineer.Fixing of 11 kv Pin insulator with pin as direction by supervising Engineer.
52Dismentling & Removal of 10/16 KVA T/F and Recived back to Ele. Store Center Taj AgraDismentling & Removal of 10/16 KVA T/F and Recived back to Ele. Store Center Taj Agra
53Dismentling & Removal of 100 KVA T/F and Recived back to Ele. Store Center Taj AgraDismentling & Removal of 100 KVA T/F and Recived back to Ele. Store Center Taj Agra

Other Detail

Information Source https://gem.gov.in/
Download FileName File Description File Size
Download 1d0ea680-6bf1-494e-a4a4-ae02ed5faba8.pdf Tender Documents 0 KB
Download 1779113538.pdf Tender Documents 0 KB
Download 1779113541.pdf Tender Documents 0 KB
Download 1779113546.pdf Tender Documents 0 KB
Download 1779113557.pdf Tender Documents 0 KB
Download 1779113559.pdf Tender Documents 0 KB
Download 1779113563.pdf Tender Documents 0 KB
Download 1779113573.pdf Tender Documents 0 KB
Download 1779113601.pdf Tender Documents 0 KB
Download 1779113615.pdf Tender Documents 0 KB
Download 1779113620.pdf Tender Documents 0 KB
Download 1779113623.pdf Tender Documents 0 KB
Download 1779113628.pdf Tender Documents 0 KB
Download 1779114078.xlsx Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.