| 1 | Supply, Installation, Testing, Commissioning, Operation & Maintenance of Centralized Control & Monitoring System (CCMS) for Street Lighting on National Highways under RO, Jammu on Five (05) Year Contract Basis. NATIONAL HIGHWAY AUTHORITY OF INDIA, RO-Jammu Name of the Contractor Sr. Name of Item Unit Quantity Quoted Rate (₹) |
| 2 | Supply, Installation, Testing & Commissioning of Centralized Control & Monitoring System (CCMS) conforming to the Technical Specifications of the RFP under Section-IV (Technical Bid), including but not limited to: a) CCMS Feeder Panel (3-Phase) with enclosure, pole-mounted or ground/stand-mounted, and accessories etc. b) CCMS Controller / RTU / Gateway with GPRS/GSM communication c) 3-Phase DLMS compliant Energy Meter d) Protection devices (MCCB/MCB/ELCB/SPD, relays, contactors, etc.) e) Antenna, wiring, earthing, and all hardware accessoriesf) Web-based Central Control & Monitoring Software Total Cost (excluding GST) 0.0 Note - Operation & Maintenance (O&M) of CCMS, including software support, server/cloud hosting, SIM/data connectivity, batteries, consumables, spares, preventive & breakdown maintenance, fault rectification, and reporting, complete in all respects, shall be payable at the rate of 12.5 % of the accepted CCMS supply and installation cost per feeder panel per year, applicable after completion of the first year, for the remaining period of the five-year contract. S. No Project Name No. of LED Lights Total required CCMS ( Tentative) |
| 3 | Rehabilitation, Strengthening and Four Lining of Srinagar to Banihal Section from Km.187.000 to Km.189.350 (Banihal Bypass) and Km.220.700 to Km.286.110 of NH-1A in the state of Jammu & Kashmir on DBFOT Annuity basis. |
| 4 | 4 laning of Jammu Udhampur section of NH-44 |
| 5 | Chenani-Nashri Tunnel (NH-44) |
| 6 | Construction of Stand Alone Ring Road/Bypass around Jammu City from Raya Morh Km. -0+687 to Jagti Km. 57+568 in the UT of J&K |
| 7 | Rectification of 2 Number Black Spots- Package 1 Lakhanpur Golden Gate (17+711 to 18+892) & Logate Morh (26+900 to 28+720) on National Highway (NH) 44 in District Kathua in the Union Territory of Jammu & Kashmir on EPC Mode |
| 8 | Rectification of Black Spot-Package-2 (Km. 31+640 to 32+700) Palli Morh i.e. 1.06 Km Section District Kathua in Union Territory of J&K |
| 9 | Improvement and Routine Maintenance on selected stretches between Lakhanpur to Vijaypur on NH-44 including provision of renewal, incident management, installation of safety furniture and repair to floor protection of bridges |
| 10 | Rectification of 2 Number Black Spots-Package-4 Maheshwar (65+338) to 65+746 to 66+885) and Km. 70+984 to 71+310 Km (ChiChi Mata) i.e. 1+744 Km Section District Samba in the UT of J&K |
| 11 | Rectification of Black Spot-Package 5 (Km. 67+180 to 69+030) (Samba) i.e. Km. 1.58 Km Section in the UT of Jammu & Kashmir on EPC Mode |
| 12 | Rectification of Black Spot – Mansar Morh from Km 69+780 to 70+690 (Mansar Morh) i.e. 0.91 Km Section Samba in the Union Territory of Jammu & Kashmir on EPC Mode |
| 13 | Improvement and Routine mainetenance on selected stretches between Lakhanpur to Vijaypur of NH-44 including provision of pothole repair, incident management, installation of safety furniture and gabion wall work |
| 14 | Rectification of MORTH identified Blackspot ID JK-02-023 (SIDCO) at Km. 69+135 to Km. 69+980 on NH-44 by taking Long Term Measures in the UT of Jammu & Kashmir |
| 15 | Udhampur–Ramban Section NH-44 |
| 16 | Banihal Bypass (Km 187+000 to Km 189+350) |
| 17 | Ramban–Banihal (Tunnel Lighting) |
| 18 | Quazigund–Banihal Section Total 12401.0 576*** *** No. of CCMS Panels is tentative, which will be executed as per actual site requirement which depends on Power Consumption, No. of Transformer & No. of lights/attached Panel. |