|
| 1 | Supply of LT PCV Cable | LT PCV Cable 4x16 Sqmm Armoured Cable |
| 2 | Supply of LT PCV Cable | LT PVC Cable 3.5x70/35 Sq mm |
| 3 | Supply of LT PCV Cable | LT PVC Cable 3.5x150/70 Sq mm |
| 4 | Supply of MS Channel | MS Channel (Dropper) 100x50x2028 mm |
| 5 | Supply of Stone Pad | Stone Pad 300x300x75 mm |
| 6 | Supply of Holding clamp | Holding clamp for top channel TPMO & Fuse set with nut & Bolt |
| 7 | Supply of M.S. Angle | M.S. Angle 75x75x6x2028mm with clamp nut & Bolt T/F Base |
| 8 | Supply of M.S. Channel | M.S. Channel 125x65x1300 mm T-off |
| 9 | Supply of Clamp | Clamp for LT T-off with bolt & nuts |
| 10 | Supply of M.S. Top Channel | M.S. Top Channel 125x65x2240 mm |
| 11 | Supply of LT Fuse Set | LT Fuse Set |
| 12 | Supply of Danger Board | Danger Board |
| 13 | Supply of Barbed Wire | Barbed Wire G.I. |
| 14 | Supply of Number Plate | Number Plate |
| 15 | Supply of Copper L-Piece | Copper L-Piece 50x225x10 mm (LS) |
| 16 | Supply of Copper L-Piece | Copper L-Piece 62x225x12 mm (LS) |
| 17 | Supply of Al Leg Long Barrel | Al Leg Long Barrel of size (LS) |
| 18 | Supply of Henley Type Tailless Unit | Henley Type Tailless Unit for 250 KVA |
| 19 | Safe Carriage of 25 KVA TF | Safe Carriage of 11/0.4 KV TF 25 KVA & following materials from Electricity Store Center Soron/Etah / Aligarh to the site of work, including loading & unloading at both ends, Traspotation upto the work side. The rates shall be inclusive of all labour charges, T&P and all incidental expenses required for complete execution of the work. |
| 20 | Safe Carriage of 250 KVA TF | 11/0.4 KV TF 250 KVA |
| 21 | Safe Carriage of PCC Pole | PCC Pole 8.5 Metre |
| 22 | Safe Carriage of ACSR Weasel Conductor | ACSR Weasel Conductor |
| 23 | Safe Carriage of LT XLPE Cable | LT XLPE Cable AL 3.5x400 Sqmm |
| 24 | Safe Carriage of LT XLPE Cable | LT XLPE Cable AL 1x400 Sqmm |
| 25 | Safe Carriage of LT XLPE Cable | LT XLPE Cable AL 1x240 Sqmm |
| 26 | Safe Carriage of Disc Insulator | 11 KV Disc Insulator Type 4500 Kg. |
| 27 | Safe Carriage of Disc Fitting | 11 KV Disc Fitting |
| 28 | Safe Carriage of Pin Insulator | 11 KV Pin Insulator |
| 29 | Safe Carriage of Pin with nut | 11 KV Pin with nut |
| 30 | Safe Carriage of TPMO | 11 KV TPMO |
| 31 | Safe Carriage of Fuse Set | 11 KV FUSE Set |
| 32 | Safe Carriage of Stay Set | Stay Set Complete |
| 33 | Safe Carriage of Earthing rod of Pole | Earthing of Pole by MS Earthing rod of 20x2500 mm and 6 SWG earthing wire etc. |
| 34 | Erection of 25 KVA TF | Installation of new 25 kVA, 110.4 kV transformer complete in all respects |
| 35 | Erection of 250 KVA TF | Installation of new 250 kVA, 110.4 kV transformer complete in all respects |
| 36 | Erection of PCC Pole | Erection of double support with complete HT/LT fittings on 8.5 m PCC poles, including earthing, grouting, and muffing of poles as per RESPO norms |
| 37 | Erection of Pipe Earthing | Installation of pipe earthing body and neutral up to 60 feet depth or minimum water level, as per RESPO norms |
| 38 | Erection of Plinth | Construction and installation of plinth for 250 kVA transformer, complete in all respects |
| 39 | Erection of Fencing | Construction and installation of 6 feet high fencing for 250 kVA transformer including civil works for 4x4 m area complete in all respects |
| 40 | Erection of LT PCV Cable | Laying & Fixing of LT PCV Cable 4x16 Sqmm Armoured Cable |
| 41 | Erection of LT PCV Cable | Laying & Fixing of 3.5x70/35 Sq mm |
| 42 | Erection of LT PCV Cable | Laying & Fixing of LT PVC Cable 3.5x150/70 Sq mm |
| 43 | Erection of MS Channel | Erection & Installation of MS Channel (Dropper) 100x50x2028 mm |
| 44 | Erection of M.S. Angle | Erection & Installation of M.S. Angle 75x75x6x2028mm with clamp nut & Bolt T/F Base |
| 45 | Erection of M.S. Channel | Erection & Installation of M.S. Channel 125x65x1300 mm T-off |
| 46 | Erection of M.S. Top Channel | Erection & Installation of M.S. Top Channel 125x65x2240 mm |
| 47 | Erection of LT Fuse Set | Fixing of LT Fuse Set |
| 48 | Erection of Danger Board | Fixing of Danger Board |
| 49 | Erection of Barbed Wire | Laying & Fixing of Barbed Wire G.I. |
| 50 | Erection of Number Plate | Fixing of Number Plate |
| 51 | Erection of Copper L-Piece | Erection & Installation of Copper L-Piece 50x225x10 mm LS |
| 52 | Erection of Copper L-Piece | Erection & Installation of Copper L-Piece 62x225x12 mm LS |
| 53 | Erection of Al Leg Long Barrel | Erection & Installation of Al Leg Long Barrel of size LS |
| 54 | Erection of Henley Type Tailless Unit | Erection & Installation of Henley Type Tailless Unit for 250 KVA |
| 55 | Erection of ACSR Weasel Conductor | Laying sagging stringing, binding and jumpering ACSR Weasel conductor |
| 56 | Erection of LT XLPE Cable | Laying & Fixing of LT XLPE Cable AL 3.5x400 Sqmm |
| 57 | Erection of LT XLPE Cable | Laying & Fixing of LT XLPE Cable AL 1x400 Sqmm |
| 58 | Erection of LT XLPE Cable | Laying & Fixing of LT XLPE Cable AL 1x240 Sqmm |
| 59 | Erection of 11 KV TPMO | Erection & Installation of 11 KV TPMO |
| 60 | Erection of FUSE Set | Erection & Installation of 11 KV FUSE Set |
| 61 | Erection of Stay Set Complete | Erection & Installation of Stay Set Complete in all respect |
| 62 | Recieved back charges for Carraige of TF from site to store. | Transformer 10 KVA |
| 63 | Recieved back charges for Carraige of TF from site to store. | Transformer 16 KVA |
| 64 | Recieved back charges for Carraige of TF from site to store. | Transformer 100 KVA |
| 65 | Recieved back charges for Carraige of TF from site to store. | Transformer 160 KVA |