| 1 | Supply of HDPE Pipe | 140 mm OD PN-4PE-80 Grade UV Stabilized HDPE Pipe in 6 Mtr |
| 2 | Supply of Stone Pad | Stone Pad 300x300x75 mm |
| 3 | Supply of Nut and Bolts | Nut Bolts off size |
| 4 | Supply of LT Clamp | LT Clamp for PCC Pole |
| 5 | Supply of LT Shackle isolator | LT Shackle isolator |
| 6 | Supply of Nut and Bolts | Nut and Bolts for LT Shackle isolator |
| 7 | Supply of I Hook | I Hook |
| 8 | Supply of Dead and Clamp | Dead and Clamp |
| 9 | Supply of Suspension Clamp | Suspension Clamp |
| 10 | Supply of PG Clamp | PG Clamp |
| 11 | Supply of Number Plate | Number Plate |
| 12 | Supply of GI Pipe | GI Pipe 6 inch Dia |
| 13 | Supply of PRC Connector | PRC Connector |
| 14 | Safe Carriage of PCC 8.5 M Pole | Safe carriage of PCC 8.5 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 15 | Safe Carriage of PCC 9 M Pole | Safe carriage of PCC 9 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 16 | Safe Carriage of ST Pole 11 M Pole | Safe carriage of ST Pole 11 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 17 | Safe Carriage of ST Pole 13 M Pole | Safe carriage of ST Pole 13 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 18 | Safe Carriage of 33 KV Jointing Kit O D | Safe carriage of 33 KV 3x300 sq. mm Jointing Kit O/D from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 19 | Safe Carriage of 33 KV XLPE Cable | Safe carriage of 33 KV XLPE Cable 3x300 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 20 | Safe Carriage of LT AB Cable | Safe carriage of LT AB Cable 3x120+1x95+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 21 | Safe Carriage of LT AB Cable | Safe carriage of LT AB Cable 3x50+1x35+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 22 | Safe Carriage of LT AB Cable | Safe carriage of LT AB Cable 3x95+1x70+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 23 | Safe Carriage of 3 Ph. Distribution Box | Safe carriage of 3 Ph. Distribution Box from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 24 | Safe Carriage of 33 KV Cross Arm V Type | Safe carriage of 33 KV Cross Arm V Type from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 25 | Safe Carriage of 33 KV F Clamp | Safe carriage of 33 KV F Clamp from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 26 | Safe Carriage of 33 KV Pin Insulator | Safe carriage of 33 KV Pin Insulator from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 27 | Safe Carriage of 33 KV Pin with Nut | Safe carriage of 33 KV Pin with Nut from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 28 | Safe Carriage of Earthing Complete | Safe carriage of Earthing Complete from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 29 | Erection of PCC Pole 8.5 M | Erection of 8.5 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 30 | Erection of PCC Pole 9 M | Erection of 9 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 31 | Erection of PCC Pole 11 M | Erection of 11 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 32 | Erection of PCC Pole 13 M | Erection of 13 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 33 | Dismentalling of LT AB Cable | Dismentalling of LT AB cable (3x50/3x120) sq. mm stacking of proper place. |
| 34 | Erection of LT AB Cable | Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of LT AB Cable 3x50+1x35+1x16 sq. mm |
| 35 | Erection of LT AB Cable | Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of LT AB Cable 3x120+1x95+1x16 sq. mm |
| 36 | Erection of 33 KV XLPE Cable | Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of 33 KV XLPE Cable 3x300 sq. mm |
| 37 | Erection of LT AB Cable | Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of LT AB Cable 3x95+1x70+1x16 sq mm |
| 38 | Erection of Cable Jointing Kit O D | Laying and Fixing of Cable Jointing Kit O/D 3x300 |
| 39 | Erection of Stone Pad | Laying and Fixing of Stone Pad |
| 40 | Erection of Number Plate | Laying and Fixing Number Plate |
| 41 | Erection of Earthing Complete | Laying and Fixing Earthing Complete |
| 42 | Erection of Distribution Box with Clamp | Fixing of Distribution Box with Clamp |
| 43 | Erection of GI Pipe | Laying and Fixing of GI Pipe |
| 44 | Erection of HDPE Pipe | FIXING OF HDPE PIPE 140 MM DIA PIPE FOR LAYING OF 33 KV, 3X300 SQMM XLPE CABLE WITH HDD (TRANCHLESS) MATHOD INCUDING CABLE LAYING |
| 45 | Carriage of Old Material | Carriage of cable & conductor old material from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking. |