| 1 | CARRIAGE OF 8.5 MTR PCC POLE FROM ESC HASARI TO DIFFERENT CONSUMER WORK SIDE. | CARRIAGE OF 8.5 MTR PCC POLE FROM ESC HASARI TO DIFFERENT CONSUMER WORK SIDE. |
| 2 | CARRIAGE OF LT LINE MATERIAL AB CABLE, STAY ROD, EARTHING ROD, G I WIRE, STAY WIRE AND OTHER LT LINE MATERIAL. | CARRIAGE OF LT LINE MATERIAL AB CABLE, STAY ROD, EARTHING ROD, G I WIRE, STAY WIRE AND OTHER LT LINE MATERIAL. |
| 3 | CARRIAGE OF 11 MTR STP POLE FROM ESC HASARI TO DIFFERENT CONSUMER WORK SIDE. | CARRIAGE OF 11 MTR STP POLE FROM ESC HASARI TO DIFFERENT CONSUMER WORK SIDE. |
| 4 | ERRECTION OF 8.5 MTR PCC POLE POLE WITH FIXING OF ALL ACCESSORIES INCLUDING IT'S GROUTING | ERRECTION OF 8.5 MTR PCC POLE POLE WITH FIXING OF ALL ACCESSORIES INCLUDING IT'S GROUTING |
| 5 | ERRECTION OF11 MTR STP POLE WITH FIXING OF ALL ACCESSORIES INCLUDING IT'S GROUTING | ERRECTION OF11 MTR STP POLE WITH FIXING OF ALL ACCESSORIES INCLUDING IT'S GROUTING |
| 6 | FIXING OF EARTHING ROD COMPLITE. | FIXING OF EARTHING ROD COMPLITE. |
| 7 | ERRECTION AND GROUTING OF STEY SET COMPLITE AS PER RESPO'. | ERRECTION AND GROUTING OF STEY SET COMPLITE AS PER RESPO'. |
| 8 | PIT DIGGING OF HARD ROCKY/ DAMMAR/ RCC SURFACE ETC. | PIT DIGGING OF HARD ROCKY/ DAMMAR/ RCC SURFACE ETC. |
| 9 | PAINTING OF 11 MTR LONG STP WITH RED OXIDE/ SILVER OXIDE PAINT. | PAINTING OF 11 MTR LONG STP WITH RED OXIDE/ SILVER OXIDE PAINT. |
| 10 | LAYING OF 1 Ph AB CABLE OF SIZE 25X16 SQMM ON POLE . | LAYING OF 1 Ph AB CABLE OF SIZE 25X16 SQMM ON POLE . |
| 11 | LAYING OF 3 Ph AB CABLE OF SIZE 3X50/95/120 SQMM ON POLE . | LAYING OF 3 Ph AB CABLE OF SIZE 3X50/95/120 SQMM ON POLE . |
| 12 | INSTALLATION OF LT DISTRIBUTION BOX 1Ph/ 3PH.ON POLE. | INSTALLATION OF LT DISTRIBUTION BOX 1Ph/ 3PH.ON POLE. |
| 13 | TREE CHOPING/CUTTING BRANCHES | TREE CHOPING/CUTTING BRANCHES |
| 14 | DISMENTAL 1Ph AB CABLE FOR REPLACMENT 3Ph AB CABLE | DISMENTAL 1Ph AB CABLE FOR REPLACMENT 3Ph AB CABLE |
| 15 | CARRIAGE OF OLD 1Ph AB CABLE & DISMENTAL CABLE FROM SITE TO STORE | CARRIAGE OF OLD 1Ph AB CABLE & DISMENTAL CABLE FROM SITE TO STORE |
| 16 | FIXING OF ALL ACCESSORIES WITH INCLUDING I-HOOK DEAD ENDCLAMP , CLAMPS ,NUT BOLT | FIXING OF ALL ACCESSORIES WITH INCLUDING I-HOOK DEAD ENDCLAMP , CLAMPS ,NUT BOLT |
| 17 | TRANSFORMER INCREASMENT 25 TO 63 KVA & 63 TO 100 KVA DISMENTAL & INSTALATION WIH BOTH SIDE CARRIAGE | TRANSFORMER INCREASMENT 25 TO 63 KVA & 63 TO 100 KVA DISMENTAL & INSTALATION WIH BOTH SIDE CARRIAGE |
| 18 | TRANSFORMER INCREASMENT 10/16 TO 25 KVA DISMENTAL & INSTALATION WIH BOTH SIDE CARRIAGE WITH FIXING OF DOUBLE POLE WITH ALL MATERIAL | TRANSFORMER INCREASMENT 10/16 TO 25 KVA DISMENTAL & INSTALATION WIH BOTH SIDE CARRIAGE WITH FIXING OF DOUBLE POLE WITH ALL MATERIAL |
| 19 | TRANSFORMER INCREASMENT 100 TO 250 KVA DISMENTAL & INSTALATION WIH BOTH SIDE CARRIAGE WITH FIXING OF ALL MATERIAL | TRANSFORMER INCREASMENT 100 TO 250 KVA DISMENTAL & INSTALATION WIH BOTH SIDE CARRIAGE WITH FIXING OF ALL MATERIAL |
| 20 | CONSTRUCTION OF TRANFORMER PLINTH OF SIZE-5X5X4 FEET AS PER DIRECTION OF THE ENGINEER. WITH THE HELP OF BRIC,RIVER SAND & STONE BLAST INCLUDES THE COST OF LABOUR ,T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. | CONSTRUCTION OF TRANFORMER PLINTH OF SIZE-5X5X4 FEET AS PER DIRECTION OF THE ENGINEER. WITH THE HELP OF BRIC,RIVER SAND & STONE BLAST INCLUDES THE COST OF LABOUR ,T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. |
| 21 | CHEMICAL EARTHING OF 250 KVA DISTRIBUTION TRANSFORMER BY EARTHING ELECRODE BY DIGGING /DRILLING OF PIT APPROX. 10 FEET DEPTH AND INSERTING G.I. ELECRODE OF 50 MM DIA B GRADE, COMPLETE TO THE REQUIRMENT OF I.S.SPECIFICATION . ITS INCLUDE THE COST OF ALL MATERIAL, LABOUR, T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. | CHEMICAL EARTHING OF 250 KVA DISTRIBUTION TRANSFORMER BY EARTHING ELECRODE BY DIGGING /DRILLING OF PIT APPROX. 10 FEET DEPTH AND INSERTING G.I. ELECRODE OF 50 MM DIA B GRADE, COMPLETE TO THE REQUIRMENT OF I.S.SPECIFICATION . ITS INCLUDE THE COST OF ALL MATERIAL, LABOUR, T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. |
| 22 | CONSTRUCTION OF FENCING FOR 250 KVA TRANFORMER AS PER DIRECTION OF THE ENGINEER. WITH THE HELP OF WIRE MESS ,ANGLE ETC. THE COST OF LABOUR ,T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. | CONSTRUCTION OF FENCING FOR 250 KVA TRANFORMER AS PER DIRECTION OF THE ENGINEER. WITH THE HELP OF WIRE MESS ,ANGLE ETC. THE COST OF LABOUR ,T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. |