|
| 1 | Supply of following Decentralized materials at the works site as perRESSPO norms |
| 2 | 11 KV X-arms holding clamps with bolts & nuts for PCC Pole |
| 3 | 33 KV X-arms holding clamps with bolts & nuts for ST Pole |
| 4 | M.S clamp for T-off channel with bolts & nuts for ST/PCC Pole |
| 5 | Stone pad, 300x300x75 mm |
| 6 | F-bracket with bolts & nuts for PCC Pole |
| 7 | E-bracket with bolts & nuts |
| 8 | 33 KV E-bracket with bolts & nuts |
| 9 | PG clamps |
| 10 | Danger Board with clamps & bolts for ST/PCC Pole |
| 11 | Barbed wire GI |
| 12 | All. Lug |
| 13 | LT shaickle Insulator |
| 14 | Bolts & nuts for shaickle Insulator |
| 15 | LT Clamp with bolts & nuts |
| 16 | Stay Clamp |
| 17 | Stay Insulator |
| 18 | Guarding angle |
| 19 | Guarding angle Clamp |
| 20 | HDPE Pipe 140 mm |
| 21 | Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge. |
| 22 | ST Poles 13 mtr long |
| 23 | ST Poles 11 mtr long |
| 24 | PCC Poles 8.5 mtr long |
| 25 | All Line materials with ACSR Weasel Conductor |
| 26 | All Line materials with ACSR Dog Conductor |
| 27 | 33 KV XLPE Cable size 3x300 mm2 |
| 28 | Cable jointing kit |
| 29 | 33 KV Bus Isolator |
| 30 | Structure for above |
| 31 | 100 KVA T/F |
| 32 | 63 KVA T/F |
| 33 | 25 KVA T/F |
| 34 | Erection |
| 35 | Erection of single support ST/PCC Pole for construction of 11 KV lineincluding digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms. |
| 36 | Erection of single support 13 Mtr ST Pole for construction of 33 KV lineincluding digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms. |
| 37 | Laying of U/G / O/H 33 KV XLPE cable size 3x300 mm2 as per RESSPOnorms. |
| 38 | Laying of U/G 140 mm HDPE Pipe as per RESSPO norms. |
| 39 | Filling of O/D 33 KV cable jointing kit size 3x300 mm2 as per RESSPO norms. |
| 40 | Erection of 33 KV bus Isolator |
| 41 | Erection of Structure for above |
| 42 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by theconstractor on his own his own cost). |
| 43 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on hisown his own cost). |
| 44 | Earthing of Poles as per RESSPO norms. |
| 45 | Stringing & sagging of 3 phase 11 KV / LT line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering as perRESSPO norms. |
| 46 | Stringing & sagging of 3 phase 33 KV line upto proper sag including laying of ACSR Dog Conductor, binding with insulators & jumpering as perRESSPO norms. |
| 47 | Erection of Sectional Double PCC Pole Structure for Distrobution T/F with the help of one pole already ereceted including digging of pit, fitting of all accessories, earthing of Pole, back filling of earth, grouting of each pole & stay sets & other required works as per RESSPO norms (cement sand & brick ballast wil be supplied by the constractor on his own his own cost). |
| 48 | Erection of Sectional Double Pole Structure of ST pole including digging of pit, fitting of all accessories, earthing of Pole, back filling of earth, grouting of each pole & stay sets as per RESSPO norms (cement sand & brick ballast wil be supplied by the constractor on his own his own cost). |
| 49 | Erection of Sectional Double Pole Structure of 13 mtr ST pole including digging of pit, fitting of all accessories, earthing of Pole, back filling of earth, grouting of each pole & stay sets as per RESSPO norms (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 50 | Mounting of 100 KVA Transformer as per RESSPO norms |
| 51 | Mounting of 63 KVA Transformer as per RESSPO norms |
| 52 | Mounting of 25 KVA Transformer as per RESSPO norms |
| 53 | Cartage of received back 25 KVA Transformer from work site to ESC Mirzapur Including loading and unloading charge |
| 54 | Cartage of received back 16 KVA Transformer from work site to ESC Mirzapur Including loading and unloading charge |
| 55 | Cartage of received back 10 KVA Transformer from work site to ESC Mirzapur Including loading and unloading charge Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing rag bolts after checking alignment with trench & conneting incomming & outgoing cable in the CT chamber Please Enable Macros to View BoQ information |