| 1 | Following works are to be carried out at 132 KV S/S Ramnagar , Barabanki for the construction of new 33 KV COMBINED HOSPITAL SIRAULI GAUSHPUR BAY\\" along with associated works including all cost of men, misc, consumables, T&P, Crane etc. to complete the Job satisfactorily |
| 2 | PART- A : - WORK |
| 3 | Carriage Work |
| 4 | Proper shifting, Sorting,counting, weighting ,stacking and loading of Galvanized sub station structure on private vehicle at EFU Naini or at any Substation Under ETC-1 Lko or its equivalent distance any other substation as per requirement |
| 5 | Safe carriage of sub station structure from EFU Naini or from any Substation Under ETC-1 Lko or its equivalent distance any other substation as per requirement |
| 6 | Un loading of structure at 132KV S/S Ramnagar Barabanki & its proper shifting, counting and stacking as per instruction of supervisioning Engineer. |
| 7 | Safe carriage of the following equipments/materials including loading and unloading on trucks duely arranged by the Contractor from Stores of any different sub-stations under ETC -I Lucknow or equivalent distance any other substations as per requirement to 132 KV S/S Ramnagar Barabanki |
| 8 | Carriage of 33 KV Tripple Feeder C&R Panel |
| 9 | Carriage of 33 KV CT/PT/Isolator |
| 10 | Carriage of 33 KV VCB |
| 11 | Carriage of various size Control Cable (2.9KM) |
| 12 | Complete Erection of Lattice type main and auxiliary structures with other associated works to complete the job as per required as per technical specification of UPPTCL APR-02 No,EKR-02No.,BBR-1No.,YMM-2 No., ALP-6 No., ABL-3 No. etc |
| 13 | Erection of following Equipments as per instruction manual and technical specifications including shifting of materials from Central Stores/ Site Store to Erection Site including all associated works. |
| 14 | 33 KV VCB with structure |
| 15 | 33 KV CT |
| 16 | 33 KV CT Junction Box. |
| 17 | 33 KV PТ |
| 18 | 33 KV PT Junction Box. |
| 19 | 33 KV BI without earth blade |
| 20 | 33 KV LI with earth blade |
| 21 | 33 KV Post Insulator |
| 22 | Earthing of structure and equipment Digging, Laying, Streightening, Bending, Cutting, Welding, Cleaning, Painting with 01 coat of Red Oxide Paint and then 02 Coat of Standard make Bus Green Colour paint after proper cleaning of rusting and dust as per proper technical specification, Filling work for Earthing of various sizes MS flat including digging pit of depth 700mm and refilling of it along with connecting this earthing to the existing Earthmat as per proper technical specification and standard norms of UPPTCL to complete the job satisfactorily including providing of the MS Flat as per UPPTCL technical norms by the contractor including other accessories. |
| 23 | 75mm*10mm MS Flat |
| 24 | 50mm*6mm MS Flat |
| 25 | 25mm*6mm MS Flat |
| 26 | Laying of following 1.1KV unarmoured copper control cable (in conduit pipes for Metering Cables) in the trenches along with conduiting in cable trenches and with using required size of Perforated Tray (Provided by Contractor, free of cost), wherever required in open area, with other relevent jobs to complete the work in proper way as per UPPTCL Norms: - |
| 27 | Laying of 2CX2.5 sq. mm size Control Cable |
| 28 | Laying of 4CX2.5 sq. mm size Control Cable |
| 29 | Laying of 6CX2.5 sq. mm size Control Cable |
| 30 | Bay wise interconnection (jumpering) of equipments with specified conductors with 33KV Main and Transfer Bus including all equipments: |
| 31 | 33KV COMBINED HOSPITAL SIRAULI GAUSHPUR BAY Bay jumpering from 33KV Main and Transper Bus to various Equipment Isolators, Equipments to Equipment jumpering i.e. Isolator to CT / CB, CB to CT, CT to Isolator. |
| 32 | Pilfer proof Metering |
| 33 | Supply & laying of 2.0\\" G.I. Pipe B-Class of Tata/Sail/Jindal/Bhushan Steel make, including cost of threading, welding and all works falling as per site requirement, passing of 2x4Cx2.5mm2 control cable through above pipe, including cost of glands & termination of above cable including cost of ferrules with all labour, T&P and associated work. Length- 270 Meter. Main- 2x4Core, 2.5mm2 cable. Check- 2x4Core, 2.5mm2 cable |
| 34 | Termination of control cable for 33KV COMBINED HOSPITAL SIRAULI GAUSHPUR BAY\\" including 1.1KV Unarmoured Copper Control Cable Termination work at both end with proper ferulling, with other relevent jobs to complete the work in proper way as per UPPTCL Norms: - |
| 35 | 33KV Bay Control Cable termination including cost of Cable Glands, applicable Copper Lugs, Ferruls and other associated works to complete the job satisfactorily |
| 36 | Optic Fibre Cable Integration with existing SCADA system and Configuration work for SAS Sub-Station including LAN Cable work for 33KV 01 No. Bay for successful completion of the job as per UPPTCL norms |
| 37 | Erection of 33KV Triple Feeder Simplex Type Control and Relay Panel as per Technical Specification for SAS based system including grouting of the Panel etc. |
| 38 | Erection of SAMAST Energy Meter and Data Communication work |
| 39 | Installation of 3P4W, 0.2s accuracy class Interface Energy Meters (one Main and check Meter) |
| 40 | Necessary interconnection from data transmission of already Installed SAMAST compliant meters to Lan switch upto DCU/Gateway and all other H/W, S/W per No. |
| 41 | Installation of communication cable (CAT-6 alongwith necessary hardware whereever required in between Energy meter to Lan switch to SDH equipments upto DCU/Gateway and all other H/W, S/W per No. |
| 42 | Erection of Apex Energy Meter Panel Set (with 2 Main + 2 Check) meter connections |
| 43 | Providing of Electrical Safety NOC for the Charging of \\"33KV COMBINED HOSPITAL SIRAULI GAUSHPUR BAY\\" including cost of required fee. |
| 44 | Provinding & Fixing of 250watt LED street Light Luminaries fittings of Philips/Cromton Greaves/Havells/ Bajaj make in piece dia. cast aluminium alloy housing with pot optics reflector and toughened clear glass cover with frame from lamp compartment including cable termination port. |
| 45 | PART- B : - SUPPLY |
| 46 | Supply of various Items required for erection of structures and equipments and stringing work along with earthing of the equipment and structures for 33KV COMBINED HOSPITAL SIRAULI GAUSHPUR BAY at 132KV s/s Ramnagar. |
| 47 | 33KV Breaker Clamp for Twin ACSR Panther conductor with nut, bolts and washer having Lateral holes for Any make of VCB of PM-6 Aluminum make as per technical specification. |
| 48 | 33KV Isolator Clamp for Twin ACSR Moose conductor with nut, bolts and washer having Lateral holes for Any make of Isolator of PM-6 Aluminum make as per technical specification. |
| 49 | 33KV Isolator Clamp for Twin ACSR Panther conductor with nut, bolts and washer having Lateral holes for Any make of Isolator of PM-6 Aluminum make as per technical specification. |
| 50 | 36 KV Bus Post Insulator with All accessories |
| 51 | 33KV BPI Clamp for Twin ACSR Panther conductor with nut, bolts and washer of PM-6 Aluminum make as per technical specification. |
| 52 | 33KV CT Clamp for Twin ACSR Panther conductor with nut, bolts and washer having 14mm size dia for stud of Any make of CT of PM-6 Aluminum make as per technical specification. |
| 53 | 33KV PT Clamp for Twin ACSR Panther conductor with nut, bolts and washer having 14mm size dia for stud of Any make of PT of PM-6 Aluminum make as per technical specification. Please Enable Macros to View BoQ information |