| 1 | ELECTRICALWORK |
| 2 | Earth work excavation for foundation in all classes of soils and sub-soils and to full depth as may be directed except in hard rock requiring blasting including initial leads and lifts and refilling the sides of foundation with excavated earth in 150 mm layers well watered, rammed and consolidated including depositing surplus earth within the godown or inside compound in places shown with initial lead of 10 mts and initial lift of 2 mts. Clearing, leveling the site, shoring, strutting, bailing of water wherever necessary etc., complete complying with standard specification and as directed. |
| 3 | CEMENT CONCRETE 1:5:10(one cement, five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including mixing by mechanical means de-watering side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed. |
| 4 | Supplying and filling in foundation and basement with clean M.SAND in layers of 150mm thick, well watered, rammed and consolidated including watering etc., complete complying with standard specifications and as directed. |
| 5 | Supplying and filling in foundation with Gravel in layers of not exceeding 150mm thick well watered, rammed and consolidated including watering etc., complete complying with standard specification and as directed. |
| 6 | Supplying and filling in basement with wetmix 250mm thick in layers of not exceeding 250mm thick, well watered, rammed and consolidated including machineries for hire and running charges leader 5 Cum capacity, hire charges for tipper, water sprinkler,` vibratory roller all labour charges etc., complete complying with standard specification and as directed by the departmental officers. |
| 7 | BRICK WORK in cement mortor 1:5(one cement, five sand) using best quality Country bricks of size 8” ¾”x4 ¼ x 2 ¾ “ for walls including cost of scaffolding curing, finishing etc., complete complying with standard specification and as directed by the departmental officers.In foundation and basement. |
| 8 | Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C.works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed. |
| 9 | Reinforcement Cement Concrete 1:2:4 ( one cement, two sand, four aggregate) using 20mm of hard broken granite stone for all RCC works using machine for mixing concrete excluding cost of centering, Strutting, shuttering, and fabrication of reinforcement and placing the grills in position etc., but including finishing and curing etc., complete complying with standard specifications and as directed.In Foundation and basement. |
| 10 | PLASTERING with cement mortor 1:5 (one cement and five sand) 12mm thick including cost of scaffolding, finishing, curing etc., complete complying with standard specification and as directed by the departmental officers. |
| 11 | Supplying and fixing UPVC (Un-Plasticized Polyviny Chloride windows of casement type (open) from the profile the size of outer frame 60mmx58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash an outer frame that enables opening of the window. The window should be fized to the wall the 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work. |
| 12 | White washing two coats with best shell lime in all floors including cost of shell lime, gum, kanjee and brushes etc., complete complying with standard specification and as directed.. |
| 13 | Painting the walls with two coats ready mixed exterior / interior emulsion paint of first class approved quality and colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed. |
| 14 | Pointing the existing fine polished cuddapah slab with cement mortar 1:3 (One cement three sand ) to full depth with black powder including laying correct alignment as directed by the departmental officers. |
| 15 | Supplying and fixing in position of best approved quality of rain water down fall pipe 110mm dia having a pressure of 4Kg/sq.cm including cost of PVC bents, PVC shoe, cast iron gratings of required diameter and special clamps, brass screws nails etc., and fixing of cast iron gratings at junction of parapet and the junction of roof slab including finishing neatly etc., complete complying with standard specification as directed by the departmental officers. |
| 16 | Supplying and fixing PVC ventilating shaft of 100mm dia (having working pressure 4 kg. / sq.cm) with 3 metre height including cost of PVC cylindrical cowl of best approved quality etc., complete as directed by the departmental officers. |
| 17 | Servicing the existing rolling shutter of size 1.8mx2.6m including spring Tension adjustment changing clips, changing patties, adjustment bearing cleaning and grease applying, locking slids adjustment kerosene washing and grease applying etc., complete as directed by the departmental officers. |
| 18 | Renewing the broken glass panes of 4.00mm thick plain glass with new glass panes of 4.00 mm thick plain glass of approved quality including fixing in position with TW beading all round the glass panes with nails etc., complete complying with standard specification and as directed by the departmental officers. |
| 19 | Supplying and fixing cutstone pillar of size 0.15x0.15x2.1m including cost of earth work excavation, RCC 1:2:4 including fixing the cut stone pillar in correct alignment, conveyance, curing etc., completed as directed by the departmental officers. |
| 20 | Supplying and fixing cutstone pillar (Strut post) of size 0.15x0.15x1.8m including cost of earth work excavation, RCC 1:2:4 including fixing the cut stone pillar in correct alignment, conveyance, curing etc., completed as directed by the departmental officers. |
| 21 | Supplying and fixing chain link fencing of size 50cmx50cm including tying with 10 Gauge G.I binding wire to the post as directed by the departmental officers. |
| 22 | Supplying and fixing GI barbed wire fencing using 10G, two ply and four pronged GI barbed wire tied between the two fencing posts using GI blinding wire at 0.20m c/c vertically and horizontaly and two nos of diagonal ties in each bay etc., complete complying with standard specification and as directed by the departmental officers. |
| 23 | Supplying and laying of Interlocking Paver Block Stone 80mm thick, over a base layer of crushed stone sand filling including cost of materials laying and Labour charges etc., complete as directed by the departmental officers (Paver block stone should be approved by the Executive Engineer before use on work). |
| 24 | Cutting and levelling the earth by using JCB including removing of slushy earth away from the site as directed by the departmental officers. Please Enable Macros to View BoQ information |