Name of Work:- REPAIR/MAINT OF EXTERNAL HT ELECTRIFICATION NETWORKS, HT CABLE, HT EQUIPMENTS AND CONNECTED ITEM AT NORTH ZONE AREA UNDER GE (N) BINNAGURI | Sl. No. | Item Description | |
| 1 | Disconnecting all in coming and outgoing cables capacity of 400 to 500 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed. (Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) | | 2 | Disconnecting all in coming and outgoing cables capacity of 200 to 315 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) | | 3 | Disconnecting all in coming and outgoing cables capacity of 100 to 150 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) Please Enable Macros to View BoQ information | | 4 | Disconnecting all in coming and outgoing cables capacity of 100 to 150 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) Please Enable Macros to View BoQ information |
|