Indian Tenders

Tender Notice

TDR 55480160
Tendering Authority Military Engineer Services
Tender No 8368/E8
Tender ID 2026_MES_765118_1
Tender Brief Corrigendum : Tender For Repair/Maint Of External Ht Electrification Networks, Ht Cable, Ht Equipments And Connected Item At North Zone Area Under Ge (N) Binnaguri
City Jalpaiguri
State West Bengal
Document Fees INR 500 /-
EMD INR 60000.0 /-
Tender Value INR 30 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Repair/Maint Of External Ht Electrification Networks, Ht Cable, Ht Equipments And Connected Item At North Zone Area Under Ge (N) Binnaguri

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 10-06-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 15-06-2026
2 03-06-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 10-06-2026

Key Dates

Publish Date 10-06-2026
Last Date of Bid Submission 15-06-2026
Tender Opening Date 17-06-2026

Contact Information

Company Name Military Engineer Services
Contact Person CWE BINNAGURI
Address HQ CWE BINNAGURI, BINNAGURI CANTT, JALPAIGURI, WEST BENGAL, PIN-735232

BOQ Items

Name of Work:- REPAIR/MAINT OF EXTERNAL HT ELECTRIFICATION NETWORKS, HT CABLE, HT EQUIPMENTS AND CONNECTED ITEM AT NORTH ZONE AREA UNDER GE (N) BINNAGURI
Sl. No. Item Description
1Disconnecting all in coming and outgoing cables capacity of 400 to 500 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed. (Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.)
2Disconnecting all in coming and outgoing cables capacity of 200 to 315 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.)
3Disconnecting all in coming and outgoing cables capacity of 100 to 150 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) Please Enable Macros to View BoQ information
4Disconnecting all in coming and outgoing cables capacity of 100 to 150 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) Please Enable Macros to View BoQ information

Other Detail

Information Source https://defproc.gov.in/nicgep/app
Download FileName File Description File Size
Download 8368TENDERDOCUMENTS.pdf Tender Documents 0 KB
Download 9a4c229a-80d3-4add-b34c-af172a23a03d.html Tender Documents 0 KB
Download BOQ_856945.xls Tender Documents 0 KB
Download Tendernotice_1 (1).pdf Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.