Indian Tenders

TDR 55459356
Tendering Authority Kerala State Electricity Board
Tender No 01/TSDKSD/2026-27/Dated 11.05.2026
Tender ID 2026_KSEB_850174_1
Tender Brief Corrigendum : Tender For 110Kv Substation, Mulleria - Extension Of 33Kv Bay & Associated Works For Power Evacuation From The 15 Mw / 60 Mwh Battery Energy Storage System (Bess) Project Under Deposit Work In Favour Of M/S. Opera Energy Pvt Ltd. Under Transmission C
City Kasaragod
State Kerala
Document Fees INR 5900.0 /-
EMD INR 50000.0 /-
Tender Value 37.39 Lakh
Tender Type Tender
Bidding Type Open Tender
Tender Category Works
Competition Type Indian
Exemption No
Tender Details

Tender for 110Kv Substation, Mulleria - Extension Of 33Kv Bay & Associated Works For Power Evacuation From The 15 Mw / 60 Mwh Battery Energy Storage System (Bess) Project Under Deposit Work In Favour Of M/S. Opera Energy Pvt Ltd. Under Transmission Circle, Kannur ( Electrical Works Sl No.1 To 45, Civil Works Sl No.46 To 67, Switchyard Light Works 68 To 84, Cable Trench Works 85 To 98, Earthmat & Earthing Connections Works 99 To 121)

Corrigendum Details
Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate Documents
1 27-05-2026 Corrigendum Submission date extension Date 06-06-2026
Key Dates
Publish Date 27-05-2026
Last Date of Bid Submission 06-06-2026
Tender Opening Date 09-06-2026
Contact Information
Company Name Kerala State Electricity Board
Contact Person Assistnat Executive Engineer
Address Transmission Subdivision,Kasaragod,Vidyanagar-671123
Pincode 671543
Other Detail
BOQ Items
Name of Work:- 110kV Substation, Mulleria - Extension of 33kV Bay & associated works for power evacuation from the 15 MW / 60 MWh Battery Energy Storage System (BESS) project under Deposit Work in favour of M/s. Opera Energy Pvt Ltd. Under Transmission Circle, Kannur ( Electrical works Sl No.1 to 45, Civil Works Sl No.46 to 67, Switchyard light works 68 to 84, Cable trench works 85 to 98, Earthmat & Earthing connections works 99 to 121)
Sl. No. Item Description
1Loading one set 33 kV Circuit breaker with its interrupting poles, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices to department lorry and fastening for transportation
2Unloading one set 33kV Circuit breaker with its interrupting poles, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices from department lorry to substation site and stacking properly for safe storage - 33kV CT/PT/NCT
3Loading one 33kV CT / CVT / PT / CC from the place of its storage to department lorry using required lifting device without causing any damage to equipment and its parts.
4Unloading one 110/66/33 kV CT/PT/CVT/CC from department lorry to substation site using suitable lifting device and dragging to safe place without causing any damage to CT as per the direction of the department officers.
5Loading one set 110/66/33 kV Bus Isolator with its insulator stacks, supporting channels, connecting pipes, isolating rods, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices to department lorry and fastening for transportation.
6Unloading one set 110/66/33 kV bus isolator with its insulator stacks, supporting channels, connecting pipes, isolating rods, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices from department lorry to substation compound and stacking properly for safe storage.
7Loading one set 33KV Line Isolator with its insulator stacks, supporting channels, connecting pipes, isolating rods, earth switches, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices to department lorry and fastening for transportation.
8Unloading one set 33KV Line isolator with its insulator stacks, supporting channels, connecting pipes, isolating rods, earthing rods, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices from department lorry to substation compound and stacking properly for safe storage.
9Loading one 33KV LA from the place of its storage to department lorry, if required, after dragging up to 50M using suitable lifting device carefully without causing any damage to equipments and fastening in the lorry make it ready for transportation as per the direction of the department officers.
10Unloading one 33KV LA from department lorry to substation site using suitable lifting device and dragging to safe place without causing any damage to CT as per the direction of the department officers.
11Loading MS / GI materials hard ware fittings of line work and clamps for equipments and bus from the place of its storage to department lorry and make it ready for transportation as per the direction of departmental officers.
12Unloading MS / GI materials, hard ware fittings of line work and clamps for equipments and bus from department lorry to substation site and stacking for proper storage as per the direction of departmental officers.
13Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges with lead of 50 m by head load and initial lift of 1.5m at each end etc. - By lorry over 9km and upto 10km for Insulators and accessories, power conductor accessories and earth conductor accessories etc
14Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges with lead of 50 m by head load and initial lift of 1.5m at each end etc. - By lorry above 10km for Insulators and accessories, power conductor accessories and earth conductor accessories etc
15Transporting by head load, the materials issued departmentally to the site from the place of storage and distribution to erection site. (Distance to be specified ) - 50m average
16Conveying to the erection site and erecting carefully 1 No. 33KV CT/PT/110KV NCT & RVT/NCT(52/36kV) on the already erected structure after opening of crates at the place of storage leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc.
17Erection of 1 No. 33KV LA/Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers.
18Unpacking carefully and leading one set of 3 pole 33KV Circuit Breaker from the place of storage, including support structure , mechanism box compressor, pipe lines etc. to site , cleaning and erecting on foundation using suitable lifting tools, after disassembling necessary parts if required, to lines and levels and assembling all the parts , connecting mechanism etc. in complete shape and making ready for commissioning as per the direction of departmental officers.
19Erection of one set 33KV Bus Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers.
20Erection of one set 33KV line Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers.
21Unpacking the transformer / feeder C&R panels, 110V battery charger, OLTC cubicle LT panel at the place of storage transporting to the place of erection and erecting after providing foundation bolt keeping to lines and levels as per the direction of departmental officers.
22Uncoiling, paving out, stringing and fixing of bus bar using ACSR Kundah / Wolf single conductor for one phase of 11/33KV bus of span up to 30M by cutting the conductor to sufficient length, crimping using compressor / bolting the two ends, washing, cleaning and drying the insulator discs, fixing the conductors to the yard structure with sufficient tension using string of insulators and hardware complete. at both ends, fixing of arcing horns including transportation of materials from the stockyard to the site under the supervision and direction of department staff at site. (All materials will be supplied departmentally at free of cost).
23Providing interconnection between equipments using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers.
24Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase)
25Erection of yard structures and assembling of columns and beams using bolt and nut including punching of holes.
26Fabrication of structures for erecting equipments. The GI & MS angles will be supplied departmentally
27Drilling holes in Yard structure
28Cutting of steel angle in yard structure erection
29Welding charge for welding on iron parts using arc welding as per standards
30Fixing departmentally supplied marshalling kiosk in the existing PT/CT structure by making suitable fixing arrangements including cutting , welding, drilling holes etc as required.
31Uncoiling 20/19 core 2.5sqmm, 12 core 4 sqmm control cable (Armoured or un armoured) from cable drums cutting to required length and laying through trench/pipe/cable tray grouping the same neatly using cable tie and carefully including for providing loop wherever necessary and providing cable marker at both ends of cable as per direction of departmental staff at site.
32Uncoiling 12/7/6 core 2.5 sq mm control cable (armoured and un armoured) from cable drums and cutting to required length and laying through trench/pipe/cable tray grouping the same neatly using cable tie and carefully including for providing loops wherever necessary and cable marker, at both ends of cable as per direction of departmental staff at site.
33Uncoiling 4/2 core 2.5sqmm control cable (armored or unarmored) from cable drums and cutting to required length and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site.
34Uncoiling 5/4/3/2 core 4sqmm control cable(armoured or un armoured) from cable drums and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site.
35Termination of cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc. - 20/19 core 2.5sqmm cable/12 core 4 sqmm cable (using gland of size 28-32mm)
36Termination of cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc. - 12/7/6 core 2.5 sqmm cable (using gland of size 25mm)
37Termination of cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc. - 4/2 core 2.5 sq mm cable/4/2 core 4 sq mm cable (using gland of size 16-22mm)
38Doing termination of all sizes of PVC insulated copper control cable 2.5 mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site.
39Doing termination of all sizes of PVC insulated copper control cable 4.0 mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., using cable tie and cable tie neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site.
40Stringing and fixing earth wire of size 7/9, 7/10 or 7/3.15 between top of the columns and to terminal tower at 33/66/110/220KV substations with compressed / bolted ends at proper tension including uncoiling and cutting of conductor , jumpering, giving earth bond connections by drawing the end of the conductor through the columns, jointing where ever necessary providing back stays at the time of stringing etc. as per the direction of the departmental officers.
41Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing 11kV DP including conveyance of materials.
42Supply and providing Cable Tie (Steel / Aluminium) including dressing of LT Power and control cables of all sizes
43Supply and providing Cable Tag for indentification of LT power and control cables (Aluminium)
44Fabrication, Supply and Installation of AC Supply Distribution Box with AC MCB, Earth link including all wiring complete
45Fabrication, Supply and Installation of DC Supply Distribution Box with DC MCB, Earth link including all wiring complete
46Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. - All kinds of soil
47Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
48Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
49Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil
50Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed Ordinary rock
51Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
52Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
53Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete
54Centering and shuttering including strutting, etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
55Centering and shuttering including strutting, etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts
56Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more
57Conveying and fixing in position foundation bolts in foundations/Rails in transformer plinth to lines and levels as per the direction of departmental officers at site.
58Stub setting in position using templates supplied by the Board/Contractor in lines and levels etc. complete as per the direction of departmental officers at site for 110kV yard Structure Foundations for P type Columns (P1,P2,P3,P4). (Stub supplied departmentally)
59Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
6012 mm cement plaster of mix: 1:4 ( 1 cement : 4 fine sand)
61Supplying and stacking hard blue granite broken stone 6 mm at site
62Spreading of broken stone 6 mm size departmental broken stone available at site including transportation by head load
63Supplying and stacking hard blue granite broken stone 40 mm at site
64Spreading of broken stone 40 mm size departmental broken stone available at site including transportation by head load
65Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: 13.43.1 Water thinnable cement primer
66Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts , bolts and washers as required complete as per the direction of Engineer-in- charge. Made of G.I. wire of dia 4 mm
67Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work
68Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
69Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock
70Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: - 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 nominal size)
71Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
72Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more
73Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete
74Centering and shuttering including strutting, etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
75Supply installation testing and commissioning of Octogaonal Pole made of hot dip galvanised GI sheet 70 mm top diameter, 130 mm bottom diameter thickness 3mm base plate dimensions of 200x200x12 mm suitable for wind speed as per IS 875 Part III double arm bracket 0.5mt including connector foundation bolt 4 nos fixed in existing RCC foundation and junction box etc. complete 7 Meters
76Supply Conveyance, installation, testing and commissioning of 100W LED Flood light output greater than 105 lumen/W 4000-6000 K with IP 66 protection LED Chip make Cree/Lumilled/Nichea with power factor greater than 0.95 at full load, internal surge protection up to 8 KV,and Aluminium pressure die-cast Powder coated housing, acrylic cover complete with THD less than 10%, power factor greater than 0.98, RoHS compliant, duly wired up for use on 230 V AC supply. Driver compartment should be seperatly accessible for maintenance (LM 79&80 certificates from NABL accredited Third party lab to be produced mentioning chip manufacturer)
77Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, \\"C\\" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. Double Pole
78Uncoiling 5/4/3/2 core 4sqmm control cable(armoured or un armoured) from cable drums and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site.
79Fixing departmentally supplied marshalling kiosk in the existing PT/CT structure by making suitable fixing arrangements including cutting , welding, drilling holes etc as required (For using as street control box)
80Laying of departmentally supplied GI strip/Copper strip of suitable size including cleaning and neatly bending of strips ,cutting, removing of metal/earth in the yard and burying earth strip to the required depth re-doing the yard metalling as per the direction of the departmental officers.
81Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150 mm in length, 6 mm thick on both sides & end of the strip & other end of the strip with yard structure at 2 points 50 mm apart each welding points having 50 mm length and 6 mm thick on both sides and end of the strip including the charges for connecting the strip with structure using bolted joints as per the directions of department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content, DC arc welding electrodes (No. E7018), cost of anti corrosive paint etc. Complete
82Welding over lapping joints of 50x6mm GI strip with 50 mm long, 6mm thick welding on all three sides after doing 2 nos. bolted joints at the centre as specified after cleaning the surface. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content, DC arc welding electrodes (No. E7018), cost of anti corrosive paint etc. Complete.
83Supplying and laying of following size DWC HDPE pipe ISImarked along with all accessories like socket, bend, couplersetc.conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required - 63 mm dia (OD-63 mm & ID-51 mm nominal)
84Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 25 mm dia 10Kgf/ cm2- Internal work- Exposed on wall
85Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
86Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock
87Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
88Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
89Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
90Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
91Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more
92Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
931.2 mm cement plaster of mix: 1:4 ( 1 cement : 4 fine sand)
94Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: 13.43.1 Water thinnable cement primer
95OD- Structural steek work in single section using departmentally supplied angle/channels etc. Fixed with or without connecting plate, including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer all complete.
96Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work
97Manual carriage for the initial 50m lead including loading, unloading and placing pre-cast concrete cover slab over the cable trenches carefully without causing any damages to cover slabs and cable trenches as directed by the Dept officers
98Providing and fixing expansion hold fasteners on C.C./R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.Fastener with threaded dia 12 mm
99Collecting 40mm broken stone from yard after removing debris and stacking the same in standard heaps (observed data approved for similar works)
100Collecting and stacking Sand/6mm metal from the yard after removing the debris.(observed data approved for similar works)
101Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil
102Laying of earth mat of required size as specified using 40/32/25mm MS rod including levelling lowering and placing in trenches, complete as per the direction of departmental officers.
103Cutting 32mm MS rod in required length etc complete as per the direction of the departmental officers
104Bending 32mm MS rod for crossing cable trench/foundations/risers etc.
105Drilling holes and driving down MS ground electrode 3m from the bottom level of trench in all classes of soil including rock etc. complete as per the directions of department officers
106Drilling bore holes of sizes 150mm or nearest in all classes of soil including hire charges of plant and machinery, cost of oil, fuel, tool etc. and taking all necessary precautions for safety to the substation equipments etc. as per the direction of departmental officers at site.
107Welding of overlapping joints for mat,riser lap joints with 32/25mm MS rod placed in trenches, having 150mm in length 6mm in thick on both sides of the rod and both ends of overlapped MS rods with 6mm welding thickness after cleaning the surfaces neatly. Charges includes cost of low hydrogen DC electrode (No. E7018), hire charges of DC arc welding set and tools and plants required, current charges including labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of department officers.
108Welding the nodal points (cross joints ) in the trenches at two sides to a thickness of 6mm after cleaning the surface neatly. Charges includes cost of low hydrogen DC electrodes (No. E7018), hire charges of DC welding set and tools and plants required, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers.
109Welding the ground electrode with the main electrode , after cleaning the surface neatly. Charges includes cost of low hydrogen content DC electrodes (No. E7018), hire charges of DC arc welding set, tools and plants, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers.
110Laying of departmentally supplied GI strip/Copper strip of suitable size including cleaning and neatly bending of strips ,cutting, removing of metal/earth in the yard and burying earth strip to the required depth re-doing the yard metalling as per the direction of the departmental officers.
111Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip & other end of the strip with yard structure at 2 points 50mm apart each welding points having 50mm length and 6mm thick on both sides & end of the strip including the charges for connecting the strip with structure using bolted joints as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete.
112Welding overlapping joints of 50x6mm GI strip with 50mm long, 6mm thick welding on all three sides after doing 2 Nos. bolted joints at the centre as specified after cleaning the surface. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes( No.E7018) cost of anti corrosive paint etc. complete.
113Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip and connecting other end with nuts & bolts if required as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete.
114Welding one end of the GI strip 50x6mm with the structure with a welding length of 50mm & 6mm thickness on both sides & end of the strip and connecting other end with bolts & nuts if required including hire charges of DC arc welding set, current charges, cost of low hydrogen DC arc welding electrodes (No.E7018) cost of anti corrosive paint etc. complete.
115Drilling holes in yard structure
116Preparation of sub grade for yard metalling with hand roller/Loose soil earth compactor having automatic movement and stroke capacity of 10kn or 1 tonne, after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with hand roller/Loose soil earth compactor including making good the undulations etc. and disposal of surplus earth with lead upto 50 metres.
117Supply and laying porforated Plastic sheet of thickness 150 GSM of approved make and quality over levelled surface including cost of sheet, wastage overlaps, conveyance and labour charges etc complete.
118Supplying and stacking 06 mm nominal size stone aggregate at site (Single size)
119Supplying and stacking 40 mm nominal size stone aggregateat site. (Single size)
120Spreading Sand/6mm metal in Substation yard 10cm thick
121Spreading 40mm metal in Substation yard 15cm thick Please Enable Macros to View BoQ information
View Original Notice/Document
Download FileName File Description
Download 3abed689-4f3c-495e-8c66-9d5fa8324855.html Tender Documents
Download BOQ_1436892.xls Tender Documents
Download Tendernotice_1 (9).pdf Tender Documents
Download Tendernotice_2 (2).pdf Tender Documents
Download Tendernotice_3 (1).pdf Tender Documents
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Click tab to load Similar Tender Results...