Tendering Authority Uttar Pradesh Power Transmission Corporation Limited
Tender No 11/ECTC,PRG/2026-27
Tender ID 2026_UPCTL_1147376_1
Tender Brief Corrigendum : Tender For Construction For Civil Work Of One No. 33 Kv Karkhiyawan Bay At 220 Kv S/S Gajokhar (Varanasi)
City Varanasi
State Uttar Pradesh
Document Fees INR 2360 /-
EMD INR 21000.0 /-
Tender Value INR 8.81 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Construction For Civil Work Of One No. 33 Kv Karkhiyawan Bay At 220 Kv S/S Gajokhar (Varanasi)

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 17-06-2026 3Corriz10to11 Date 22-06-2026
2 08-06-2026 2CorrizETN10to11 Date 16-06-2026
3 29-05-2026 01Corriz10to11 Date 08-06-2026
4 29-05-2026 01Corriz10to11 Date 08-06-2026

Key Dates

Publish Date 17-06-2026
Last Date of Bid Submission 22-06-2026
Tender Opening Date 23-06-2026

Contact Information

Company Name Uttar Pradesh Power Transmission Corporation Limited
Contact Person SE Civil
Address 57 George town PRG

BOQ Items

Name of Work:- CONSTRUCTION FOR CIVIL WORK OF ONE NO. 33 KV karkhiyawan BAY AT 220 KV S/S Gajokhar (VARANASI)
Sl. No. Item Description
1Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.(DSR 2.31)
2Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - chargeNominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)(DSR -15.2.2))
3Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.(DSR -15.3)
4Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.(DSR 2.8.1)
5Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.(DSR 2.27)
6Providing and laying 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(DSR 4.1.10))
7Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5,Cement mortar 1:4 (1 cement : 4 coarse sand) in foundation and plinth etc .(DSR 6.1.1)
8Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.(DSR 11.2)
9Providing and laying 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(DSR 4.1.2))
10Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns(DSR -4.3.1)
11Steel reinforcement TMT Bars of Fe-500 grade bars for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.(DSR 5.22.6)
12Providing and laying 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level (DSR 5.1.2)
13Reinforced cement concrete work1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement.(DSR 5.2.2)
14Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work(NSI. 9.12)
15Fixing and grouting 28 mm and above dia bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) .(NSI. 9.13)
16Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (NSI. 9.14)
17Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (NSI. 9.15)
18Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(DSR 10.2)
19Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . (NSI. 9.30)
20Fixing of template in position level and alignment for grouting of Anchor bolt in main gantry (labour rate only). (NSI. 9.31)
21Same in item 9.31 above but for auxiliary structure. (labour rate only). (NSI. 9.32)
22Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). (NSI. 9.33)
23Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete.(NSI. 11.18)
242.5 cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC (NSI. 12.26)
256 mm cement plaster 1:3 (1 cement : 3 fine sand) of mix :( DSR-13.16.1)
2612 mm cement plaster1:4 (1 cement: 4 coarse sand) of mix :(DSR 13.4.1)
27Neat cement punning.(DSR 13.18)
28Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture:(DSR 13.62.1
29Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position (NSI No. 13.28)
30Placing of trench cover of all size in proper position including transportation from different places within the S/S area including all labour, T&P etc. required for proper completion of the work as per direction of Engineer - in - charge. (NSI No. 20.11)
31Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.(DSR-15.60)
32Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m all kinds of soil.(DSR 2.28.1) Please Enable Macros to View BoQ information Special Condition :-
33Tenderers are required to quote their offer as “above / at par / below” in the estimated cost.
34The rates are to be filled up in figures and words both.
35Departmental rates are exclusive of GST.GST will be borne by department as per applicable rules. Labour Cess, Royalty and all other Taxes are liable to be paid by Firm/Contractor.
36In case of any discrepancy between the language of the items of bill of quantity and that of PWD the later shall prevail.
37Tenders are advised to visit the site of work and make themselves acquainted with the site conditions. No claim whatsoever shall be entertained after submission of tender.
38Quantities are approximate and may vary up to any extent on either side as per requirement of the site conditions in the direction of Engineer-In-charge or may not be executed at all for which no extra claim shall be entertained.
39All above works shall be executed as per U.P.P.W.D/ U.P.P.T.C.L. specification or as directed by Engineer-In-charge.
40The work may be carried in energized s/s area having high voltage installation contractor must employee trained supervisor & labour to work in such electrical/ hazardous area. All risk to men & materials shall be contractor's resposibilitiy
41All risk to men, labour & materials shall be contractor’s responsibility.
42All materials shall be arranged by the contractor’s at his own cost.
43No handling charges of T&P and labour will be paid for extended period of contract, if any.
44Rates quoted by Tenderer will remain firm till completion of scope of work of contract.
45Contractor shall register his labour engaged in construction work in the office of Dy. Labour Commissioner ¼Hkou ,oa vU; lfUuekZ.k deZdkj ¼fu;kstu rFkk lsok ‘krZ fofu;eu½ v/khfu;e 1996.
46Testing of material if any, required expenditure shall be borne by the contractor. Nothing shall be paid extra by the department.
47Contractor has to made available 12 No cube at site and will frequently fill the cube at site. Accordingly cube test report will be submitted by contractor at his own cost. Final bill of work will be paid to contractor only after he will submit all satisfactory test result from authorized lab.
48The contractor should have all related T&P like as concrete mixture, Needle & Surface vibratory, Slump test equipment & survey equipment etc.
49Contractor has to put up all relevant drawing to SE (Civil) Prayagraj for approval at his own cost; nothing shall be paid extra for it.
50As per G.O No. 622/23-12-2012-2. Audit/08 TC dt. 08 June 2012, Contractor has to deposit extra Security/ Performance guarantee, if the tendered rates are found below to the department rates.
51As per section 171 of CGST Act, 2017 Any reduction in rate of tax on any supply of goods or service or the benefit of input tax credit shall be passed on the recipient by way of commensurate reduction in prices. Hence supplier/manufacturer to ensure to pass the benefit of reduced prices to UPPTCL, Further price quoted by supplier/Manufacturer is subject to scrutiny under above section”
52Security of work will be released after six month from the date of completion of the work if no defect has been found after six month.
53All the civil work carried out in potable water on contractor own cost. No Payment will made by department. However in case of departmental water supply 1.5% deduction will be made from contractor’s bill for water charges for the item which involve water consumption.
54The bill Processing / Payment will be done according to existing UPPTCL Rule of ERP Portal.
55If Tender has been cancelled after inviting due to any reason between tender call to final process, the tender cost will not refund to contractor, only EMD Will be refunded to Firm.
56The 60% amount of brick available from dismantaling shall be recovered @ Rs. 3744.00/thousand + GST to Firm/Contractor.
57The 30% amount of brick available from dismantaling shall be recovered as brick bats @ Rs. 1680.00/Cum + GST to Firm/Contractor.
58The amount of Steel available from dismantaling will be recovered @ Rs. 20.00/KG + GST to Firm/Contractor.
59Replaced CP Bib cock/piller cock/brass bib cock shall be recovered @ Rs. 25.00/each + GST to Firm/Contractor.
60Old door and windows, shutter with chaukhat shall be recovered @ Rs. 70.00/Sqm. + GST to Firm/Contractor. SIGNATURE OF TENDERER / AUTHORISED PERSON ALONGWITH SEAL OF THE FIRM Name ……………………………..………..... Full Postal Address:………………………. ………………………………………………….. Phone No……………….. Mob. No…………

Other Detail

Information Source https://etender.up.nic.in
Download FileName File Description File Size
Download 11Docsfor33KVKarkhiyawanB_1.pdf Tender Documents 0 KB
Download 34041c80-0a02-4faa-82a6-1d35a3da9d93.html Tender Documents 0 KB
Download BOQ_2146475.xls Tender Documents 0 KB
Download Tendernotice_1 (18).pdf Tender Documents 0 KB