Indian Tenders

Tender Notice

TDR 55443937
Tendering Authority All India Institute Of Medical Sciences
Tender No GEM/2026/B/7515114
Tender ID GEM/2026/B/7515114
Tender Brief Bids Are invited for Sitc Of Mgps
City Nagpur
State Maharashtra
Document Fees Refer document
EMD INR 68255.0 /-
Tender Value Refer document
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Bids Are invited for Sitc Of Mgps Sitc Of Medical Grade Copper Pipe Twenty Two Mm , Sitc Of Medical Grade Copper Pipe Fifteen Mm , Sitc Of Medical Grade Copper Pipe Twelve Mm , Sitc Of Outlet Point Oxygen , Sitc Of Outlet Point Vacuum , Sitc Of Outlet Point Medical Air , Sitc Of Outlet Point Nitrous Oxide , Sitc Of Gas Outlet Point Agss , Medical Area Gas Alarm For Three Gas Services , Medical Area Gas Valve Box For Three Gas Services , Sitc Line Isolation Valve Twenty Two Mm Ball Valve , Sitc Stainless Steel Probe Total Quantity : 572

Key Dates

Publish Date 11-05-2026
Last Date of Bid Submission 01-06-2026
Tender Opening Date 01-06-2026

Contact Information

Company Name All India Institute Of Medical Sciences
Address 441108,All India Institute of Medical Sciences, Nagpur, Plot No. 2, Sector - 20, MIHAN, Nagpur, Pin: 441108

BOQ Items

Sl. No. Item TitleItem Description
1Cariage of following material from centre stores, Asfabad to site of work through the Kachcha and Pakka road including the work of its loading and unloading at the respective ends in the area of EDD, Sirsaganj including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work . [Distence 00.00 Km. to 20.00 Km.]Cariage of following material from centre stores, Asfabad to site of work through the Kachcha and Pakka road including the work of its loading and unloading at the respective ends in the area of EDD, Sirsaganj including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work . [Distence 00.00 Km. to 20.00 Km.]
28.5 mtr. Long PCC Poles8.5 mtr. Long PCC Poles
311 KV X - arms, Pin Insulators, clamps Conductor and 11 KV & 33KV Jointing Kits, terminating Kits other required line material, if any.11 KV X - arms, Pin Insulators, clamps Conductor and 11 KV & 33KV Jointing Kits, terminating Kits other required line material, if any.
4Replacement of damaged 8.5 mtr. Long PCC pole by digging of pit and dismantling of all accessories from the existing / damaged pole and erection of single new pole including fitting all accessories including the cost of labourer, T&P etc. required for proper completion of work.Replacement of damaged 8.5 mtr. Long PCC pole by digging of pit and dismantling of all accessories from the existing / damaged pole and erection of single new pole including fitting all accessories including the cost of labourer, T&P etc. required for proper completion of work.
5Replacement of damaged Double pole of 8.5 mtr. Long PCC pole ( first opening of all accessories & then removing damaged poles), re - erecting D/P including fixing of Disc Insulators with fitting and other 11 KV accessories as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.The double pole shall be grouted in ratio 1:4:8 ( Cement, sand, brick ballast/ stone pad as per actual requirement at site.Replacement of damaged Double pole of 8.5 mtr. Long PCC pole ( first opening of all accessories & then removing damaged poles), re - erecting D/P including fixing of Disc Insulators with fitting and other 11 KV accessories as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.The double pole shall be grouted in ratio 1:4:8 ( Cement, sand, brick ballast/ stone pad as per actual requirement at site.
6Straightening of tilted following poles in the existing lines as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.Straightening of tilted following poles in the existing lines as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
78.5 mtr. Long PCC Poles8.5 mtr. Long PCC Poles
89/11 mtr ST Poles9/11 mtr ST Poles
9Replacement of following damaged accessories in 11 KV/ LT lineReplacement of following damaged accessories in 11 KV/ LT line
1011 KV X arm with clamp11 KV X arm with clamp
1111 KV Pin Insulators with pin11 KV Pin Insulators with pin
12U clamp with nut and boltU clamp with nut and bolt
13Stay Clamp with nut and boltStay Clamp with nut and bolt
14LT Pin clampLT Pin clamp
15Rebinding & Tightining of loose stay set at defferent places of defferent feeders as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.Rebinding & Tightining of loose stay set at defferent places of defferent feeders as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.
16Reconnecting of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.Reconnecting of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.
17RE - sagging and stringing of existing following conductor in 11 HT/LT line as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of workRE - sagging and stringing of existing following conductor in 11 HT/LT line as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
18ACSR Weasel conductorACSR Weasel conductor
19ACSR Dog conductorACSR Dog conductor
20AB conductorAB conductor
21RE - sagging and stringing of existing following conductor in 33 line as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of workRE - sagging and stringing of existing following conductor in 33 line as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
22ACSR Dog conductorACSR Dog conductor
23Guarding of 11 KV line by laying, stringing sagging and binding of 02 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X - guards ( Tiles) of GI wire at distance of 3 mtr. Including the cost of arrangement of labour, T&P etc. required for proper completion of work.Guarding of 11 KV line by laying, stringing sagging and binding of 02 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X - guards ( Tiles) of GI wire at distance of 3 mtr. Including the cost of arrangement of labour, T&P etc. required for proper completion of work.
24Re- sagging of Guarding of 11 KV line as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.Re- sagging of Guarding of 11 KV line as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.
25choping of tree branches at defferent places of defferent feeders as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.choping of tree branches at defferent places of defferent feeders as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.
26Straightening of tilted cross arms as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.Straightening of tilted cross arms as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.
27Digging & Laying of 33 KV and 11 KV XLPE Cables and Installation of 33 KV & 11 KV terminating Kits, Jointing KitsDigging & Laying of 33 KV and 11 KV XLPE Cables and Installation of 33 KV & 11 KV terminating Kits, Jointing Kits

Other Detail

Information Source https://gem.gov.in/
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.