TDR 55439939
Tendering Authority Bharat Sanchar Nigam Limited
Tender No RJCO-23/11(11)/4/2026-TX AND MM
Tender ID 2026_BSNL_276620_1
Tender Brief Tender For Ofc Rehabilitation & Patch Work In Alwar& Bharatpur Oa Of Alwar Ba 2024-25
City Jaipur
State Rajasthan
Document Fees INR 1180 /-
EMD INR 124236.0 /-
Tender Value INR 62.11 Lakhs /-
Tender Type Tender
Bidding Type Open Tender
Competition Type Indian

Tender Details

Tender for Ofc Rehabilitation & Patch Work In Alwar& Bharatpur Oa Of Alwar Ba 2024-25

Key Dates

Publish Date 11-05-2026
Last Date of Bid Submission 01-06-2026
Tender Opening Date 03-06-2026

Contact Information

Company Name Bharat Sanchar Nigam Limited
Contact Person CGMT, BSNL, Rajasthan, Jaipur
Address O/o CGMT, BSNL, Sardar Patel Marg, C-Scheme, Jaipur (Rajasthan)-302008

BOQ Items

Name of Work:- OFC rehabilitation & patch work in Alwar& Bharatpur OA of Alwar BA 2024-25
Sl. No. Item Description
1Excavating trenches upto a depth of 1.65 M and back filling the excavated trenches after laying the HDPE/PLB pipe with or without protection as per tender specification
2i) in Kuchcha soil
3ii) in pucca soil
4iii) in Rocky soil(Soft)
5iv) in Rockky soil(Hard)
6Excavation by manual tunneling or boring and reinstatement as per construction specification of the tender to a depth of 1.65M or more in Bituminised/ Concrete/ Set stone for single PLB Pipe(including Laying charges)
7Laying of PLB HDPE duct by HDD method at a depth of 2M or more
8i) Single PLB pipe
9ii) Two to three pipe
10iii) Four to Seven pipe
11BSNL will supply HDPE/PLB Pipes & other accessories
12Laying of PLB HDPE pipe/GI Pipe/RCC Pipe/DWC Pipe
13i) Laying of single HDPE/PLB pipes/Coils,Coupled with Coupler
14ii) Laying of two HDPE/PLB pipes/Coils,Coupled with Coupler
15iii) Laying of three/four HDPE/PLB pipes/Coils,Coupled with Coupler
16BSNL will supply HDPE/PLB Pipes & other accessories
17Laying and fixing of 80 mm/65 mm/40 mm G.I. Pipes in trenches with PLB/ HDPE pipes/coils inside and drawing PP rope.
18Laying/ clamping/ fixing of 65 mm/40 mm G.I. Pipes on Bridges and Culverts horizontally/ Vertically and leading in BSNL Customer premises with laying HDPE/ PLB pipes/coils inside. All material will be supplied by contractor except G.I. pipes.
19Road/ Rail crossing through horizontal boring method / HDD mehtod and inserting 80/65/40 dia GI pipes and pushing HDPE/ PLB pipes/ Coil inside. i) Depth shall be 2M and above without GI protection. ii) Depth is less than 2M with GI protection as applicable.
20BSNL will supply G.I.Troughs/GI pipes in lengths approx 6M clamps and PLB HDPE pipes/Coils
21Laying of full round RCC(ISI Mark)/DWC pipe(as per existing TEC GR No:- GR/DWC-34/01 Sep 2007 with latest amendment)in trenches over PLB HDPE Pipes/coils,on culverts/bridges/nulla and for cases where cable is laid at less depth(wherever required)
22i) Full Round RCC pipe
23ii) Full Round DWC pipe
24Laying of half-split RCC(ISI Mark)/DWC pipe(as per existing TEC GR No:- GR/DWC-34/01 Sep 2007 with latest amendment)in trenches over PLB HDPE Pipes/coils,onculverts/bridges/nulla and for cases where cable is laid at less depth(wherever required)
25i) Half Split RCC pipe
26ii) Half Split DWC pipe
27BSNL will supply RCC Full Round/RCC Half split pipe(ISI Mark) or DWC full round pipe /DWC half split pipe(As per TEC GRNo:- GR/DWC-34/01 Sep 2007 with latest amendment and coupler). Materials required for sealing the coupling of RCC/DWC pipes will be arranged by the contractor.
28Providing cement concrete 1:2:4 at wheel guard of bridge/culvert over the toe or in the trench for protection.
29Providing cement concrete 1:2:4 over the PLB HDPE PIPE with wire mesh in the trenches for protection,where the depth is less than 120cm(cement concrete as per specification).
30PLB HDPE ducts, GI pipes, will be supplied by the BSNL. All other materials required for the work shall be arranged by the contractor. Rates include cost of material and standard curring, shuttering etc. and transportation from store.
31Cable laying by pulling/Blowing
32Laying of OFC by pulling/blowing method in new duct including opening of manhole, sealing of PLB HDPE Pipes by Rubber Bushes in Manholes, providing HDPE/PLB/ RCC split pipes in manhole/ back filling of manholes.
33Laying of OFC by pulling/blowing method in existing duct /Leading -In in BSNL/customer premises, including cleaning of chocked pipe as per construction specifications.
34OFC/PLB/ HDPE pipe shall be provided by the BSNL. All other materials required for the work shall be arranged by the contractor.
35Splicing of OF cable
36Splicing of Fibres in existing/new joint chambers for making straight/Branch joints on new routes or at FPOI and end to end testing of all fibres after splicing.Including fixing of Joint Closure.
37i) up to 12 F OF cable
38ii) 24 F OF cable
39iii) 48 F OF cable
40iv) 96 F OF cable
41v) 288 F OF cable
42vi) A ribbon of OF cable
43Splicing of all Fibres in the fiber Termination box and testing all the fibres for continuity. This will also include installation/mounting of the FTB as specified.
44i) up to 12 F OF cable
45ii) 24 F OF cable
46iii) 48 F OF cable
47iv) 96 F OF cable
48v) 288 F OF cable
49vi) A ribbon of OF cable
50Splicing of Overhead OF cable upto 6 Fibre
51Note:- All tools, Splicing machine and instruments required for above work shall be arranged by the contractor.
52Jointing Chamber
53Digging of pit for Jointing chamber and construction of Bricks joints chamber, filling of brick chamber with clean sand (Bajri only), supply and placing of pre cast/ stone slabs on brick chamber and back filling of jointing pit as per specification and the construction practice as specified in the tender document.
54Digging of pit for Jointing chamber and construction of Pre febricated RCC chamber, filling of Pre febricated RCC chamber with clean sand (Bajri only), supply and placing of pre cast/ stone slabs on Pre febricated RCC chamber and back filling of jointing pit as per specification and the construction practice as specified in the tender document.
55Providing, Construction and Fixing of RCC Manholes at site as per construction specification given in the tender document, work includes excavation of pits for the manhole.
56All materials required for the work shall be arranged by the contractor
57Route/Joint Indicator
58Digging of pits 1M towards jungle side or Road Side or on the trench/ Manhole/ Joint Chamber for fixing of route/ Joint Indicator directly buried i.e.without concreting route/Joint Indicator, Painting and sign writing route/joint indicator. BSNL will supply Route/Joint Indicator, all the other material required for the work will be arranged by the contractor.
59Digging of pits 1M towards jungle side or Road Side or on the trench/ Manhole/ Joint Chamber for fixing of route/ Joint Indicator and concreting of route/Joint indicator, painting and sign writing of route/Joint indicator. BSNL will supply Route/Joint Indicator, all the other material required for the work will be arranged by the contractor.
60Supply of route indicator( Stone/RCC) , including Digging of pit 1 meter towards jungle side or road side or on the trench/manhole/joint chamber for fixing of route/joint indicator with concreting route/Joint Indicator, Painting and sign writing route/joint indicator.
61Supply of route indicator( Stone/RCC) , including Digging of pit 1 meter towards jungle side or road side or on the trench/manhole/joint chamber for fixing of route/joint indicator directly buried i.e.without concreting route/Joint Indicator, Painting and sign writing route/joint indicator.
62Restoration of Road surface
63Road restoration work with bituminous macadam for semi grouting 50mm thick and premix carpet surfacing 25mm thick over the grouted surface(total upto 75mm thick),including supply of asphalt etc.to evenly match the road,including consolidation and rolling as per standard specification of DSR 1997
64Road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225mm,including supply of concrete to evenly match the road
65All materials required for the work shall be arranged by the contractor
66Route Index Diagram
67Documentation containing digram as per E.I. including Lat/Long each joint/route indicator on good quality papers
68(i) 2 Hard copy and 1 soft copy
69(ii) 6 Hard copy and 1 soft copy
70Videography of the route on which cable is laid as per E.I.
71The contractor shall arrange all materials required for the work
72Laying OFC in building(Leading in Work)
73laying of OFC in corridor/risers/exchange premises with PLB pipe without G.I. Pipe (leading in work)
74Mounting of FDMS at OLT locations
75Physical mounting of FDMS on wall at OLT locations
76Recovery of store
77Recovery of empty OF Cable Drum(All Type OF CABLE)
78Hiring of JCB for Exposing of PLB Pipe
79Digging out of pits of Size 1MX 1M X 2 M for exposing the OFC and Refilling in Kaccha Soil
80Digging out of pits of Size 1MX 1M X 2 M for exposing the OFC and Refilling in Pucca Soil .
81Digging out of pits of Size 2MX 1M X 2 M for exposing the OFC and Refilling in Kaccha Soil
82Digging out of pits of Size 2MX 1M X 2 M for exposing the OFC and Refilling in Pucca Soil
83Opening of covers and Cleaning of the Manhole of the existing Duct and Refixing of the covers of Manhole.
84Raising of 200mm thick RCC walls of OFC Manhole up to existing Road Level up to avarage Hight of raising 0.30M with cement concerte 1:2:4 including fixing the steel iron angle 150mm*100mm*6mm on outer wall as frame on the RCC wall of size 1.80m*1.40m all complete as per construction specification
85O/H erection of 2F/4F/6F OFC on existing poles/alignment (including transportation of material from BSNL store to site and binding/clamping material. Please Enable Macros to View BoQ information

Other Detail

Information Source https://etenders.gov.in/eprocure/app
Download FileName File Description File Size
Download 08bb2383-f5bc-4eb8-becf-627b2372de14.html Tender Documents 0 KB
Download biddocalw2425.pdf Tender Documents 0 KB
Download BOQ_323094.xls Tender Documents 0 KB
Download Tendernotice_1 (1).pdf Tender Documents 0 KB