| 1 | Dismantling roof (corrugated, semi corrugated etc) sheets in roof coverings including ridges, complete all as specified and directed. |
| 2 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete, complete all as specified and directed. |
| 3 | S&F for Rolled mild steel sections conforming to Gde Fe-290(Gde-165-E) as in main and cross beams, hip and jack rafters; purlins where connected to common rafters and running rails & guides for sliding doors, fixed with angle cleats or other connecting plates, complete all as specified and directed. |
| 4 | S&F Plate girder or single stanchions, built up of one beam or channel section with flange plates, caps, bases, splices, angle brackets cleats and other connections Gde Fe- 290 (Gde-165-E), complete all as specified and directed. |
| 5 | M&L for preparation of new untreated steel surface of any description exc 10cm width or girth applying two coats of synthetic enamel paint over a coat of red oxide primer, complete all as specified and directed. |
| 6 | M&L multi-rib TM profile high tensile 550 MPA yield strength colour coated galvalume corrugated steel sheet having maximum pitch of 250mm, c/c and minimum 30mm crest depth in length as per site requirement.The feed material is to be manufacture out of 0.50mm (TCT). Total coated thickness with 18-20 microns top coat over 5 microns primer and 8-10mm alkyd backer, zinc aluminium alloy of AZ-150. The sheet shall have a hot dip metallic zinc aluminium alloy coating of zinc 43.5%, aluminium (55%)and silicon (1.5%) with ttoal mass coating of 150 gms/sqm on both sides. Covered width will be 1020mm and sheet length as per site requirement. The profile is having return leg for proper side lap. The sheet shall be fixed using self drilling/self capping screws with EDPM seal or fixed with 'L' or 'J' type or cranked hook bolts in roof, complete all as specified and directed. |
| 7 | M&L multi-rib TM profile high tensile 550 MPA yield strength colour coated galvalume plain steel sheet having maximum pitch of 250mm, c/c and minimum 30mm crest depth in length as per site requirement. The feed material is to be manufacture out of 0.50mm (TCT). Total coated thickness with 18-20 microns top coat over 5 microns primer and 8-10mm alkyd backer, zinc aluminium alloy of AZ-150. The sheet shall have a hot dip metallic zinc aluminium alloy coating of zinc 43.5%, aluminium (55%)and silicon (1.5%) with ttoal mass coating of 150 gms/sqm on both sides. Covered width will be 1020mm and sheet length as per site requirement. The profile is having return leg for proper side lap. The sheet shall be fixed using self drilling/self capping screws with EDPM seal or fixed with 'L' or 'J' type or cranked hook bolts in roof, complete all as specified and directed. |
| 8 | Demolition/taking down existing roof treatment including PCC padding by picking sweeping, cleaning and washing down with water to remove dust, durt etc and brushing neat cement slurry @ 3 KG/sqm, complete all as specified and directed. |
| 9 | M&L PCC padding 1:2:4 type B-0 (using 12.50 mm graded crushed stone aggregate) of uniform thickness 25 mm average top surface of pain cement concrete padding shall be furnished even and smooth without using extra cement, complete all as specified and directed. |
| 10 | M&L 15 mm thick screed bed ing CM 1:4, complete all as specified and directed. |
| 11 | M&L for applying Bituminious primer on roof surface conforming to IS-3384 bof 1986 @ 0.70 Kg/sqm and ap[plying APP based polymeric membrane minimum weighing 3 Kg/sqm and minimum 3 mm thick reinforced with non-woven polyster matt laid on primed surface by torch application complete all as specified with overlap of 100 mm overlap to be thermo fushed by flame, complete all as specified and directed. |
| 12 | M&L applying one coat of aluminium paint at the rate of 100 gms/sqm as per manufacturers instructions over bituminous layer, complete all as specified and directed. |
| 13 | M&L PCC 1:2:4 type B-0 (using 12.50 mm graded crushed stone aggregate) as in lintel up to 1.50 m clear span,cills, steps, seismic and other similar bands, plinth course, lacing cource, parapet, railing, coping, apex stone, bed plate, kerb slightly rounded, complete all as specified and directed. |
| 14 | Taking down cement plaster on brick/stone or concrete surface including racking out joints, hacking for key, scrubbing down with water to receive plaster, including removing debris/rubbish materials off the site out side MD land, complete all as specified and directed. |
| 15 | Material and labour for 15 mm thick with CM 1:4 plaster in layer on fair faces of brick wall or concrete surfaces, finished even and fair, including use of scaffolding, complete all as specified and directed. |
| 16 | Material and Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/liter and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shape (Company Depot Tinted) with silicon additives @ 1.43 liter/10Sq m over and including priming coat of exterior primer applied @ 0.90 liter /10Sqm over new surface authorized applicator only including use of scaffoldings, complete all as specified and directed. |
| 17 | Material and labour for 10 mm thick with CM 1:4 Plaster in single layer on other than fair faces of concrete surfaces in wall (internal surface) and finished even and smooth without using extra cement, complete all as specified and directed. |
| 18 | Material and Labour for preparation of newly plastered surface of wall and applying two coats of oil emulsion distemper over a coat alkali resistant primer coat through authorised applicators of paint manufacturers only of approved shade, complete all as specified and directed. |
| 19 | Demolition of brick work or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facing dressed stone work and precast concrete articles including removing debris out side MD land, complete all as specified and directed. |
| 20 | Material and Labour for Brick work with sub class 'B' brick straight or curved on plan exc 6 mtr mean raddius built in CM 1:6, complete all as specified and directed. |
| 21 | Taking up or down steel tubing and connection including cleaning for refixing or removal to store for 15 mm bore, complete all as specified and directed. |
| 22 | S&F tubes medium grade galvanized with all fittings and fixed complete to walls and ceilings or laid in floor for 15 mm bore, complete all as specified and directed. |
| 23 | Demolition and breaking up drain pipes (SGSW, AC or RCC,CI) of internal dia 75/110 mm, set in cement mortar, complete all as specified and directed. |
| 24 | S&F for PVC (SWR) pipes, single socketed in any length with rubber ring joints, fixed to walls, 110mm bore incl clamps, complete all as specified and directed. |
| 25 | S&F for PVC (SWR) pipes, single socketed, in any length with rubber ring joints, fixed to walls, 75 mm bore incl clamps, complete all as specified and directed. |
| 26 | S&F for PVC (SWR) bends any radius, 110 mm bore, complete all as specified and directed. |
| 27 | S&F for PVC (SWR) bends any radius, 75 mm bore, complete all as specified and directed. |
| 28 | S&F for PVC (SWR) branch piece, single (single Y) equal or unequal radius, 110 mm bore, complete all as specified and directed. |
| 29 | S&F for PVC (SWR) branch piece, single (single Y) equal or unequal radius, 75 mm bore, complete all as specified and directed. |
| 30 | S&F for PVC (SWR) branch piece, single (single T) equal or unequal radius, 110 mm bore, complete all as specified and directed. |
| 31 | S&F for PVC (SWR) branch piece, single (single T) equal or unequal radius, 75 mm bore, complete all as specified and directed. |
| 32 | S&F for PVC (SWR) reducers, 110 mm bore, complete all as specified and directed. |
| 33 | S&F for PVC (SWR) reducers, 75 mm bore, complete all as specified and directed. |
| 34 | S&F for PVC (SWR) vent cowl, 110 mm bore, complete all as specified and directed. |
| 35 | Dismantling of floor hearth/wall tiles including cement mortar bedding (but not backing) and removing serviceable tiles, and removing debris out of MD, complete all as specified and directed. |
| 36 | Material and Labour for first and premium quality of non skid ceramic tiles 7 to 8mm thick (square/rectangular) area of each tile excedding 0.06 sqm but n.exc 0.11 sqm in floors etc set and joimted in neat cement sluury and pointed in white or coloured cement to match and including 15mm thick screed bed or bedding layer in cement mortar 1:6, complete all as specifed and directed. |
| 37 | Material and Labour for first and premium quality of Glazed ceramic coloured tiles in vertical surface 350x 250x7 mm/450 x 350 x 7 mm thick, in skirting, dados, risers to steps, etc se and jointed in neat cement slurry, and pointed in coloured cement to match tiles over and including 10mm thick rendering or backing layer in cement mortar 1:4, complete all as specified and directed. |
| 38 | Material and Labour for Vetrified ceramic tiles Dark shade 7 to 8mm thick (square/rectangular) polished,area of each tiles not exceeding 0.36 sqm in floors etc and jointed in neat cement slurry and pointed in whitebor coloured cement and including 15 mm thick screed bed or bedding layer in cement mortar 1:6, complete all as specifed and directed. |
| 39 | Material and Labour for Vetrified ceramic tiles dark shade 7 to 8mm thick (square/rectangular) polished, area of each tiles not exceeding 0.36 sqm in vertical surfaces etc and jointed in neat cement slurry and pointed in whitebor coloured cement over and including 10 mm thick rendering or backing layer in cement mortar 1:4, complete all as specified and directed. |
| 40 | M&L preparing old decorated surface by washing rubbing down and stopping of distempered and painted surfaces of walls and applying one coat of distemper oil emulsion white or tinted, complete all as specified and directed. |
| 41 | M&L preparing old decorated surface by washing rubbing down and stopping of distempered and painted surfaces of ceiling and applying one coat of distemper oil emulsion white or tinted complete all as specified and directed. |
| 42 | M&L of complete removal and preparing old decorated surface by washing rubbing down and stopping of distempered and painted surfaces of walls and applying two coats of distemper oil emulsion white or tinted, complete all as specified and directed. Please Enable Macros to View BoQ information |