| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: |
| 3 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 5 | Foundations, footings, bases of columns etc. for mass concrete. |
| 6 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah |
| 7 | Dumping stone including cost of stones. in Horizontal on level |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone . Nallah |
| 9 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 10 | Hand-packing stones in wire-crates; including cost of crates and stones |
| 11 | Supplying and stacking at site Graded crushed stone aggregate of size 90 mm to 45 mm |
| 12 | Supplying and stacking at site Graded crushed stone aggregate of size 63 mm to 45 mm |
| 13 | Supplying and stacking at site Graded crushed stone aggregate of size 53 mm to 22.4 mm |
| 14 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. |
| 15 | Supplying and stacking at site Stone screening of size 13.2 mm nominal size (Type A) |
| 16 | Supplying and stacking at site Good Earth |
| 17 | CARRIAGE OF MATERIALSBy Mechanical Transport including loading, unloading and stacking complete |
| 18 | Carriage of Sand / Dust at an avg. lead of 20 km by MT |
| 19 | Carriage of Stone at an avg. lead of 10 km by MT |
| 20 | Carriage of Stone agg 40 mm n size at an avg. lead of 20 km by MT |
| 21 | Carriage of Stone agg 20 mm n size at an avg. lead of 20 km by MT Please Enable Macros to View BoQ information |