| 1 | Supply, Installation, Testing and Commissioning of |
| 2 | 11 Mtr ST Pole ST-410 SP56 S.T. poles well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above & bottom plate 35cm*35cm, 5mm thick fully welded. |
| 3 | 9 Mtr ST Pole ST-410, SP-33 S.T. poles well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above & bottom plate 35cm*35cm, 5mm thick fully welded. |
| 4 | 8 Mtr ST Pole ST-410, SP-15 S.T. poles well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above & bottom plate 35cm*35cm, 5mm thick fully welded. |
| 5 | 9 Mtr. Long PCC Pole-WL-300Kg |
| 6 | 8 Mtr. Long PCC Pole- WL-250Kg |
| 7 | Installation, Testing and Commissioning (including loading, unloading and transportation upto 4 Km from Divisional store to different sites (including Manual Carriage upto 100 Mtr at site)-Material to be provided Departmentally) of |
| 8 | 11 Mtr ST Pole ST-410 SP56 |
| 9 | 9 Mtr ST Pole ST-410, SP-33 |
| 10 | 8 Mtr ST Pole ST-410, SP-15 |
| 11 | 9 Mtr. Long PCC Pole- WL-300Kg |
| 12 | 8 Mtr. Long PCC Pole-WL-200Kg |
| 13 | Dismantling of damaged/Old Poles alongwith allied Materials and transportation of same to divisional store including loading and unloading |
| 14 | 11 Mtr ST Pole |
| 15 | 09 Mtr ST Pole |
| 16 | 08 Mtr ST Pole |
| 17 | 9 Mtr PCC Pole |
| 18 | 8 Mtr PCC Pole |
| 19 | 9/8 Meter Wooden poles along with Fixtures |
| 20 | Dismantling of damaged/Old Pole alongwith allied Materials excluding Transportation charges |
| 21 | 11 Mtr ST Pole |
| 22 | 09 Mtr ST Pole |
| 23 | 08 Mtr ST Pole |
| 24 | 8 Mtr PCC Pole |
| 25 | 9 Mtr PCC Pole |
| 26 | 9/8 Meter Wooden poles along with Fixtures |
| 27 | Re-erection of fallen/available Pole at site alongwith allied Materials of same within the radius of 50 Mtrs of initial site |
| 28 | 11 Mtr ST Pole |
| 29 | 09 Mtr ST Pole |
| 30 | 08 Mtr ST Pole |
| 31 | 8 Mtr PCC Pole |
| 32 | 9 Mtr PCC Pole |
| 33 | 9/8 Meter Wooden poles along with Fixtures |
| 34 | Re- Straightening of Tilted Poles complete job |
| 35 | Manual Carriage Charges for Steel Tabular Pole 11Mtr/9mtr/8 mtr for every additional 50 mtr (including unloading/Loading) |
| 36 | Manual Carriage Charges for PCC 9mtr/8 mtr for every additional 50 mtr (including unloading/Loading) |
| 37 | Supply, laying, stringing, Testing and Commissioning of ACSR conforming with the Indian Standard specification IS: 398 (PLI)-1976 and IS : 398 (PL II)- 1976 or the latest version thereof. |
| 38 | 30 Sqmm ACSR |
| 39 | 50 Sqmm ACSR |
| 40 | 100 Sqmm ACSR |
| 41 | Laying, stringing, Testing and Commissioning (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-(Material to be provided Departmentally) of ACSR conforming with the Indian Standard specification IS: 398 (PLI)-1976 and IS : 398 (PL II)- 1976 or the latest version thereof. |
| 42 | 30 Sqmm ACSR |
| 43 | 50 Sqmm ACSR |
| 44 | 100 Sqmm ACSR |
| 45 | Dismantling of ACSR Conductor and transportation of same to divisional store including loading and unloading |
| 46 | 30 Sqmm ACSR |
| 47 | 50 Sqmm ACSR |
| 48 | 100 Sqmm ACSR |
| 49 | Dismantling of ACSR Conductor excluding Transportation charges |
| 50 | 30 Sqmm ACSR |
| 51 | 50 Sqmm ACSR |
| 52 | 100 Sqmm ACSR |
| 53 | Relaying/re-erection of available conductor at site or re- Straightening of loose Conductor/Fallen Conductor after opening of bindings and refixing thereof. |
| 54 | 30 Sqmm ACSR |
| 55 | 50 Sqmm ACSR |
| 56 | 100 Sqmm ACSR |
| 57 | Supply, Installation, Testing and Commissioning of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nutbolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 58 | Installation, Testing and Commissioning of Galvanised Stay Set complete (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 59 | Supply, fabrication and fixing (including loading, unloading and transportation of Channel Iron X-arm/V cross Arm of different sorts (100x50x50x6 mm,75x40x6mm (Galvanized as per IS) including Top Bracket, Clamps & Braces of different sizes, (Galvanized as per IS) |
| 60 | Fabrication and fixing (including loading, unloading and transportation of Channel Iron X-arm/V cross Arm of different sorts (100x50x50x6 mm,75x40x6mm (Galvanized as per IS) including Top Bracket, Clamps & Braces of different sizes, (Galvanized as per IS) (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 61 | Fixing of Channel Iron/ Angle Braces of different sizes available at site |
| 62 | Dismantling of Channel Iron/ Angle Braces of different sizes including loading/unloading/transportation of same to divisional store including loading and unloading |
| 63 | Dismantling of Channel Iron/ Angle Braces of different sizes excluding transportation charges |
| 64 | Supply and Fixing of GI Pole Support Back Clamp/collar |
| 65 | 11 Mtr Pole with size - 50x8x376 mm |
| 66 | 9 mtr pole with size - 50x8x376 mm |
| 67 | 8 mtr with size 50x 8x 332 mm |
| 68 | 8 mtr or 9 mtr PCC with size 50x8x441mm |
| 69 | Fixing of GI Pole Support Back Clamp/collar (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 70 | 11 Mtr Pole with size - 50x8x376 mm |
| 71 | 9 mtr pole with size - 50x8x376 mm |
| 72 | 8 mtr with size 50x 8x 332 mm |
| 73 | 8 mtr or 9 mtr PCC with size 50x8x441mm |
| 74 | Supply and Fixing of Cable tie 4.8 x 250 mm (each packet contains 100 Nos.) |
| 75 | Fixing of Cable tie (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 76 | Supply and Fixing of Cable end caps |
| 77 | Fixing of Cable end caps (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 78 | Supply, installation, testing and Commissioning of Insulating Piercing Connectors |
| 79 | Installation, testing and Commissioning of Insulating Piercing Connectors (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 80 | Supply, installation, testing and Commissioning of 3 Phase SMDB (Service Main Distribution Box) IP54 made from 20 SWG CRCA MS sheetby Deep drawn method with connection terminals for R,Y, B & N as per specifications. Internal size of the box shall be 225mm x 285mm x 120mm used for connection through ABC line and for giving connections to the consumers 3phase-1 incoming 4 outgoing I/C- 1, O/G-2-4 (200 A, 0.415 kV) for RYB Phase. The DB should have Bottom entry of Cable with proper Glands/grommets-Safety Screws and Back Clamp suitable for 11/9/8 Mtr ST Pole or 9/8 mtr PCC poles with Nuts/bolts. The job also includes disconnection/reconnection of consumer energy meter including providing of aluminium lugs, if required. |
| 81 | Installation, testing and Commissioning of SMDB (Service Main Distribution Box). The job also includes disconnection/reconnection of consumer energy meter including providing of aluminium lugs, if required. (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 82 | Dismantling of Damaged/old SMD Box and transportation of same to divisional store including loading and unloading |
| 83 | Dismantling of Damaged/old SMD Box excluding transportation. |
| 84 | Fixing of Old/available SMD Box at site |
| 85 | Supply and fixing (including loading, unloading and transportation) of Nuts and Bolts full thread of sizes Galvanized as per IS |
| 86 | Fixing (including loading, unloading and transportation) of Nuts and Bolts full thread of sizes Galvanized as per IS (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 87 | Supply, Installation, Testing and commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 88 | Installation, Testing and commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally |
| 89 | Supply, Installation, Testing and Commissioning (including loading, unloading and transportation) of 11KV Pin Insulators with Pins (5KN) |
| 90 | Installation, Testing and Commissioning (including loading, unloading and transportation) of 11KV Pin Insulators with Pins (5KN) (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 91 | Providing and laying of earthing of earthing complete by GI Pipe 40 mm or GI rod 20 mm 2.5 mtr long through GI Strip |
| 92 | Laying of earthing of earthing complete by GI Pipe 40 mm or GI rod 20 mm 2.5 mtr long through GI Strip (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 93 | Providing and laying of Earthing of Substation---Excavation of earth pit of dia 650mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as per IS 1239. GI strip for neutral earthing of size 25mm*3mm for connection of transformer body, G.O Set & lightening Arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials & earth chamber made of brick masonry with RCC slab cover. |
| 94 | Supply, Installation, Testing and Commissioning (including loading, unloading and transportation) of Danger Plate With Clamps as per Standards. |
| 95 | Installation, Testing and Commissioning (including loading, unloading and transportation) of Danger Plate With Clamps as per Standards. (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 96 | Supply, Installation, Testing and Commissioning (including loading, unloading and transportation) of GI Barbed Wire. |
| 97 | Installation, Testing and Commissioning of GI Barbed Wire (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 98 | Supply, Installation, Testing and Commissioning (including loading, unloading and transportation) of Anti-Climbing Device with Clamps |
| 99 | Installation, Testing and Commissioning of Anti-Climbing Device with Clamps (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 100 | Supply and Painting of ST poles with one coat of Red Oxide primer and two coats of Aluminum paint. |
| 101 | Painting of ST poles with one coat of Red Oxide primer and two coats of Aluminum paint. (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 102 | Providing of material and laying of Cement bottoming of poles |
| 103 | 1:2:4 Mix as per REC Standards 0.66 M3 per Pole |
| 104 | 1:2:4 Mix as per REC Standards 0.48 M3 per Pole |
| 105 | 1:2:4 Mix as per REC Standards 0.40 M3 per Pole |
| 106 | Providing of material and laying of Stone pad (300x300x75 mm) |
| 107 | Laying of Stone pad (300x300x75 mm) (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 108 | Supply, Installation, Testing and Commissioning (including loading, unloading and transportation) of 16 KN Polymer Shackle Insulator alongwith G.I. U-Clamps/pole collar for Shackle insulators |
| 109 | Installation, Testing and Commissioning (including loading, unloading and transportation) of 16 KN Polymer Shackle Insulator alongwith G.I. U-Clamps/pole collar for Shackle insulators (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 110 | Supply and fixing of PG Clamps for |
| 111 | 30/ 50 mm² ACSR Conductor |
| 112 | 100 mm² ACSR Conductor |
| 113 | 150 mm² ACSR Conductor |
| 114 | Fixing of PG Clamps (Material to be Provided Departmentally including loading/unloading/transportation upto 4 Km from Divisional stores to different Sites) |
| 115 | 30/ 50 mm² ACSR Conductor |
| 116 | 100 mm² ACSR Conductor |
| 117 | 150 mm² ACSR Conductor |
| 118 | Supply, Laying, Installation, Testing and Commissioning of 11 kV, 3- Core XLPE flat strip Armoured, FRLS Cable |
| 119 | 120 mm² |
| 120 | 150 mm² |
| 121 | 185 mm² |
| 122 | 240 mm² |
| 123 | 300 mm² |
| 124 | 400 mm² |
| 125 | Laying, Installation, Testing and Commissioning of 11 kV, 3- Core XLPE flat strip Armoured, FRLS Cable (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 126 | 120 mm² |
| 127 | 150 mm² |
| 128 | 185 mm² |
| 129 | 240 mm² |
| 130 | 300 mm² |
| 131 | 400 mm² |
| 132 | Dismantling of damaged/Old 11 kV, 3- Core XLPE Cable of different sizes and transportation of same to divisional store including loading and unloading |
| 133 | Dismantling of damaged/Old 11 kV, 3- Core XLPE Cable of different sizes excluding transportation |
| 134 | Re-erection of available 11 kV, 3- Core XLPE Cable of different sizes within the radius of 50 Mtrs |
| 135 | Supply, Laying, Installation, Testing and Commissioning of 11 kV, Single core Aluminium Flat strip Armoured XLPE Cable, FRLS |
| 136 | 120 mm² |
| 137 | 150 mm² |
| 138 | 185 mm² |
| 139 | 240 mm² |
| 140 | 300 mm² |
| 141 | 400 mm² |
| 142 | 630 mm² |
| 143 | Laying, Installation, Testing and Commissioning of 11 kV, Single core Aluminium Flat strip Armoured XLPE Cable, FRLS (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 144 | 120 mm² |
| 145 | 150 mm² |
| 146 | 185 mm² |
| 147 | 240 mm² |
| 148 | 300 mm² |
| 149 | 400 mm² |
| 150 | 630 mm² |
| 151 | Dismantling of damaged/Old 11 kV, 1- Core XLPE Cable of different sizes and transportation of same to divisional store including loading and unloading |
| 152 | Dismantling damaged/Old 11 kV, 1- Core XLPE Cable of different sizes excluding transportation. |
| 153 | Re-erection of available/Old 11 kV, 1- Core XLPE Cable of different sizes within the radius of 50 Mtrs |
| 154 | Supply, Laying, Installation, Testing and Commissioning of 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS |
| 155 | 25 mm² |
| 156 | 35 mm² |
| 157 | 50 mm² |
| 158 | 70 mm² |
| 159 | 95 mm² |
| 160 | 120 mm² |
| 161 | 150 mm² |
| 162 | 185 mm² |
| 163 | 240 mm² |
| 164 | 300 mm² |
| 165 | 400 mm² |
| 166 | 500 mm² |
| 167 | Laying, Installation, Testing and Commissioning of 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 168 | 25 mm² |
| 169 | 35 mm² |
| 170 | 50 mm² |
| 171 | 70 mm² |
| 172 | 95 mm² |
| 173 | 120 mm² |
| 174 | 150 mm² |
| 175 | 185 mm² |
| 176 | 240 mm² |
| 177 | 300 mm² |
| 178 | 400 mm² |
| 179 | 500 mm² |
| 180 | Dismantling of damaged/Old 3½ Core Cable,1.1kV Grade, Armoured, XLPE Cable of different sizes and transportation of same to divisional store including loading and unloading |
| 181 | Dismantling of damaged/Old 3½ Core Cable,1.1kV Grade, Armoured, XLPE Cable of different sizes excluding transportation. |
| 182 | Re-erection of available/Old 3½ Core Cable,1.1kV Grade, Armoured, XLPE Cable of different sizes within the radius of 50 Mtrs |
| 183 | Supply, Laying, Installation, Testing and Commissioning of Single Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type including Lugs/Thimbles/Clamps |
| 184 | 70 mm² |
| 185 | 95 mm² |
| 186 | 120 mm² |
| 187 | 150 mm² |
| 188 | 185 mm² |
| 189 | 240 mm² |
| 190 | 300 mm² |
| 191 | 400 mm² |
| 192 | 500 mm² |
| 193 | 630 mm² |
| 194 | Laying, Installation, Testing and Commissioning of Single Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 195 | 70 mm² |
| 196 | 95 mm² |
| 197 | 120 mm² |
| 198 | 150 mm² |
| 199 | 185 mm² |
| 200 | 240 mm² |
| 201 | 300 mm² |
| 202 | 400 mm² |
| 203 | 500 mm² |
| 204 | 630 mm² |
| 205 | Dismantling of damaged/Old 1- Core Cable,1.1kV Grade, Armoured, XLPE Cable of different sizes and transportation of same to divisional store including loading and unloading |
| 206 | Dismantling damaged/Old 1- Core Cable,1.1kV Grade, Armoured, XLPE Cable of different sizes excluding transportation. |
| 207 | Re-erection of available/Old 1- Core Cable,1.1kV Grade, Armoured, XLPE Cable of different sizes within the radius of 50 Mtrs |
| 208 | Supply, Laying, Installation, Testing and Commissioning of Single Core Cable,1.1kV Grade, Un-Armoured, XLPE Insulated Stranded Conductor FRLS type including Lugs/Thimbles/Clamps |
| 209 | 35 mm² |
| 210 | 50 mm² |
| 211 | 70 mm² |
| 212 | 95 mm² |
| 213 | 120 mm² |
| 214 | 150 mm² |
| 215 | 185 mm² |
| 216 | 240 mm² |
| 217 | 300 mm² |
| 218 | 400 mm² |
| 219 | 500 mm² |
| 220 | 630 mm² |
| 221 | Laying, Installation, Testing and Commissioning of Single Core Cable,1.1kV Grade, Un-Armoured, XLPE Insulated Stranded Conductor FRLS type (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 222 | 35 mm² |
| 223 | 50 mm² |
| 224 | 70 mm² |
| 225 | 95 mm² |
| 226 | 120 mm² |
| 227 | 150 mm² |
| 228 | 185 mm² |
| 229 | 240 mm² |
| 230 | 300 mm² |
| 231 | 400 mm² |
| 232 | 500 mm² |
| 233 | 630 mm² |
| 234 | Dismantling of damaged/Old 1- Core Cable,1.1kV Grade, Un-Armoured, XLPE Cable of different sizes and transportation of same to divisional store including loading and unloading |
| 235 | Dismantling of damaged/Old 1- Core Cable,1.1kV Grade, Un-Armoured, XLPE Cable of different sizes excluding transportation |
| 236 | Re-erection of available/Old 1- Core Cable,1.1kV Grade, Un-Armoured, XLPE Cable of different sizes within the radius of 50 Mtrs |
| 237 | Supply, Installation, testing and commissioning of HT Air Bundled Cable on ST/PCC Poles including Lugs/Thimbles/Clamps |
| 238 | 35 mm² AB (HT) Cable (3x35+1x70 insulated) mm² XLPE (11 kV, 3C + Earth) |
| 239 | 35 mm² AB (HT) Cable (3x35+1x35 mm² insulated) mm² XLPE |
| 240 | 50 mm² AB (HT) Cable (3x50 + 1x70 insulated) mm² XLPE (11 kV, 3C + Earth) |
| 241 | 70 mm² AB (HT) Cable (3x70+1x70 insulated) mm² XLPE (11 kV, 3C + Earth) |
| 242 | 70 mm² AB (HT) Cable (3 x 70 + 1x95 insulated) mm² XLPE(11 kV, 3C + Earth) |
| 243 | 95 mm² AB (HT) Cable (3x95+1x95 insulated) mm² XLPE(11 kV, 3C + Earth) |
| 244 | 120 mm² AB (HT) Cable (3x120 + 1x95 mm² insulated) XLPE(11 kV, 3C + Earth) |
| 245 | 185 mm² AB (HT) Cable (3x185+1x120 insulated) mm² XLPE(11 kV, 3C + Earth) |
| 246 | Installation, testing and commissioning of HT Air Bundled Cable on ST/PCC Poles (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 247 | 35 mm² AB (HT) Cable (3x35+1x70 insulated) mm² XLPE (11 kV, 3C + Earth) |
| 248 | 35 mm² AB (HT) Cable (3x35+1x35 mm² insulated) mm² XLPE |
| 249 | 50 mm² AB (HT) Cable (3x50 + 1x70 insulated )mm² XLPE (11 kV, 3C + Earth) |
| 250 | 70 mm² AB (HT) Cable (3x70+1x70 insulated)mm² XLPE (11 kV, 3C + Earth) |
| 251 | 70 mm² AB (HT) Cable (3 x 70 + 1x95 insulated)mm² XLPE(11 kV, 3C + Earth) |
| 252 | 95 mm² AB (HT) Cable (3x95+1x95 insulated)mm² XLPE(11 kV, 3C + Earth) |
| 253 | 120 mm² AB (HT) Cable (3x120 + 1x95 mm² insulated) XLPE(11 kV, 3C + Earth) |
| 254 | 185 mm² AB (HT) Cable (3x185+1x120 insulated) mm² XLPE(11 kV, 3C + Earth) |
| 255 | Dismantling of damaged/Old HT Air Bundled Cable of different sizes and transportation of same to divisional store including loading and unloading |
| 256 | Dismantling of damaged/Old HT Air Bundled Cable of different sizes excluding transportation. |
| 257 | Re-erection of damaged/Old HT Air Bundled Cable of different sizes within the radius of 50 Mtrs |
| 258 | Supply, Installation, testing and commissioning of LT Air Bundled Cable on ST/PCC Poles including Lugs/Thimbles/Clamps |
| 259 | 35 mm² AB (LT) Cable ( 3 x 35 + 1 x 16 + 1 x 25 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 260 | 50 mm² AB (LT) Cable ( 3 x 50 + 1 x 16 + 1 x 35 insulated)mm² XLPE (1.1kV, 3+1 C, Al) |
| 261 | 70 mm² AB (LT) Cable ( 3 x 70 + 1 x 16 + 1 x 50 mm²) XLPE (1.1kV, 3+1 C, Al) |
| 262 | 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 263 | 185 mm² AB (LT) Cable ( 3 x 185 + 1 x 16 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 264 | Installation, testing and commissioning of LT Air Bundled Cable on ST/PCC Poles (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 265 | 35 mm² AB (LT) Cable ( 3 x 50 + 1 x 16 + 1 x 35 mm²) XLPE (1.1kV, 3+1 C, Al) |
| 266 | 50 mm² AB (LT) Cable ( 3 x 50 + 1 x 16 + 1 x 35 mm²) XLPE (1.1kV, 3+1 C, Al) |
| 267 | 70 mm² AB (LT) Cable ( 3 x 70 + 1 x 16 + 1 x 50 mm²) XLPE (1.1kV, 3+1 C, Al) |
| 268 | 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 16 + 1 x 70 mm²) XLPE (1.1kV, 3+1 C, Al) |
| 269 | 185 mm² AB (LT) Cable ( 3 x 185 + 1 x 16 + 1 x 95 mm²) XLPE (1.1kV, 3+1 C, Al) |
| 270 | Dismantling of damaged/Old LT Air Bundled Cable of different sizes and transportation of same to divisional store including loading and unloading |
| 271 | Dismantling of damaged/Old LT Air Bundled Cable of different sizes within the radius of 50 Mtrs |
| 272 | Dismantling & re-erection of damaged/Old LT Air Bundled Cable of different sizes within the radius of 50 Mtrs of initial site |
| 273 | Providing and fixing of Aluminum Lugs/Thimbles of sizes & types |
| 274 | 10 SQMM |
| 275 | 16 SQMM |
| 276 | 25 SQMM |
| 277 | 35 SQMM |
| 278 | 50 SQMM |
| 279 | 70 SQMM |
| 280 | 95 SQMM |
| 281 | 120 SQMM |
| 282 | 150 SQMM |
| 283 | 185 SQMM |
| 284 | 240 SQMM |
| 285 | 300 SQMM |
| 286 | 400 SQMM |
| 287 | 500 SQMM |
| 288 | 630 SQMM |
| 289 | Providing and fixing of Heavy Duty Copper Lugs/Thimbles of sizes & types |
| 290 | 10 SQMM |
| 291 | 16 SQMM |
| 292 | 25 SQMM |
| 293 | 35 SQMM |
| 294 | 50 SQMM |
| 295 | 70 SQMM |
| 296 | 95 SQMM |
| 297 | 120 SQMM |
| 298 | 150 SQMM |
| 299 | 185 SQMM |
| 300 | 240 SQMM |
| 301 | 300 SQMM |
| 302 | 400 SQMM |
| 303 | 500 SQMM |
| 304 | 630 SQMM |
| 305 | Fixing of Aluminum/copper Lugs/Thimbles of sizes & types |
| 306 | 10 SQMM |
| 307 | 16 SQMM |
| 308 | 25 SQMM |
| 309 | 35 SQMM |
| 310 | 50 SQMM |
| 311 | 70 SQMM |
| 312 | 95 SQMM |
| 313 | 120 SQMM |
| 314 | 150 SQMM |
| 315 | 185 SQMM |
| 316 | 240 SQMM |
| 317 | 300 SQMM |
| 318 | 400 SQMM |
| 319 | 500 SQMM |
| 320 | 630 SQMM |
| 321 | Installation, Testing and Commissioning of Distribution Transformer (including loading, unloading and transportation from one site to different sites (store/workshop/sites) upto the radius of 4 KM) (which includes arrangement of crane/sleepers/Trucks etc) |
| 322 | 25 KVA |
| 323 | 63 KVA |
| 324 | 100 KVA |
| 325 | 200 KVA |
| 326 | 250 KVA |
| 327 | 400 KVA |
| 328 | 630 KVA |
| 329 | 1 MVA |
| 330 | Dismantling of Distribution Transformer (including loading, unloading and transportation from one site to different sites (store/workshop/sites) upto the radius of 4 KM) (which includes arrangement of crane/sleepers/Trucks etc) |
| 331 | 25 KVA |
| 332 | 63 KVA |
| 333 | 100 KVA |
| 334 | 200 KVA |
| 335 | 250 KVA |
| 336 | 400 KVA |
| 337 | 630 KVA |
| 338 | 1 MVA |
| 339 | Installation and Commissioning of Distribution Transformer available at site including integration with system by way of providing necessary material |
| 340 | 25 KVA |
| 341 | 63 KVA |
| 342 | 100 KVA |
| 343 | 200 KVA |
| 344 | 250 KVA |
| 345 | 400 KVA |
| 346 | 630 KVA |
| 347 | 1 MVA |
| 348 | Supply, installation, testing and commissioning of LT Distribution Box for (As per the Specifications Enclosed). |
| 349 | 25 kVA DTR with 40 Amp MCCB 3P 16 kA for incomer & 25 Amp MCCB 3P 16 kA/10 kA 1 No each (=2No.) for Outgoing Circuits. |
| 350 | 63 kVA DTR with 100 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 1 No. and 63 Amp MCCB 3P 16 kA 1 No.s for Outgoing Circuits. |
| 351 | 100 kVA DTR with 160 MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits |
| 352 | 200 kVA DTR with 315 Amp MCCB 3P 25 kA for incomer & 160 Amp MCCB 3P 16 kA 3 No.s for Outgoing Circuits. |
| 353 | 250 kVA DTR with 400 Amp MCCB 3P 36 kA for incomer & 200 Amp MCCB 3P 16 kA 1 No. and 160 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits. |
| 354 | 400 kVA DTR with 630 Amp MCCB 3P (36 KA) adjustable 1 No. for incomer & 200 Amp 3 P (16 KA) 4 No.s fixed for Outgoing Circuits |
| 355 | 630 kVA DTR with 1000 Amp MCCB 3P (36 KA) adjustable 1 No. for incomer & 250 Amp MCCB 3 P (25 KA) 2 No.s fixed & 200 Amp MCCB 3 P (25 KA) 3 No.s for Out going. |
| 356 | Installation, testing and commissioning of LT Distribution Box (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) for |
| 357 | 25 kVA DTR with 40 Amp MCCB 3P 16 kA for incomer & 25 Amp MCCB 3P 16 kA/10 kA 1 No each (=2No.) for Outgoing Circuits . |
| 358 | 63 kVA DTR with 100 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 1 No. and 63 Amp MCCB 3P 16 kA 1 No.s for Outgoing Circuits. |
| 359 | 100 kVA DTR with 160 MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits |
| 360 | 200 kVA DTR with 315 Amp MCCB 3P 25 kA for incomer & 160 Amp MCCB 3P 16 kA 3 No.s for Outgoing Circuits. |
| 361 | 250 kVA DTR with 400 Amp MCCB 3P 36 kA for incomer & 200 Amp MCCB 3P 16 kA 1 No. and 160 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits. |
| 362 | 400 kVA DTR with 630 Amp MCCB 3P (36 KA) adjustable 1 No. for incomer & 200 Amp 3 P (16 KA) 4 No.s fixed for Outgoing Circuits |
| 363 | 630 kVA DTR with 1000 Amp MCCB 3P (36 KA) adjustable 1 No. for incomer & 250 Amp MCCB 3 P (25 KA) 2 No.s fixed & 200 Amp MCCB 3 P (25 KA) 3 No.s for Out going. |
| 364 | Supply, installation, laying, testing and commissioning of LT Distribution Box for1600 Amp 4P ACB Drawal type , Breaking Capacity 50kA with enclosure |
| 365 | Installation, testing and commissioning of LT Distribution Box for 1600 Amp ACB Drawal type 36 kA with enclosure for 1 MVA DT (including loading, unloading and transportation from Divisional store to different sites-Material to be provided Departmentally) |
| 366 | Supply, installation, laying, testing and commissioning of LT Distribution Box for MCCB 630 Amp adjustable type 4P 36 KA with Box for 1 MVA DT |
| 367 | Installation, testing and commissioning of LT Distribution Box for MCCB 630 Amp adjustable type 4P 36 KA with Box for 1 MVA DT (including loading, unloading and transportation from Divisional store to different sites upto 4 Km-Material to be provided Departmentally) |
| 368 | Supply, installation, commissioning and Testing of LT Fuse Set (Customised) for Distribution Transformers as per KPDCL Drawing no. CE/P&P/DRG/2023/LTFS/001 (enclosed) |
| 369 | 25 KVA |
| 370 | 63 KVA |
| 371 | 100 KVA |
| 372 | 200 KVA |
| 373 | 250 KVA |
| 374 | 400 KVA |
| 375 | 630 KVA |
| 376 | 1 MVA |
| 377 | Installation, commissioning and Testing of LT Fuse Set (Customised) for Distribution Transformers (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 378 | 25 KVA |
| 379 | 63 KVA |
| 380 | 100 KVA |
| 381 | 200 KVA |
| 382 | 250 KVA |
| 383 | 400 KVA |
| 384 | 630 KVA |
| 385 | 1 MVA |
| 386 | Dismantling of damaged/Old LT Fuse Set of different sizes and transportation of same to divisional store including loading and unloading |
| 387 | Dismantling of damaged/Old LT Fuse Set of different sizes excluding transportation. |
| 388 | Installation/Re-erection of available Old LT Fuse Set of different sizes |
| 389 | Supply, installation, commissioning and Testing of G.I Pipe of 150 mm dia 3 mtr long for Pole Butts (6\\") |
| 390 | Fixing of G.I Pipe of 150 mm dia 3 mtr long for Pole Butts (6\\") (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 391 | Dismantling of G.I Pipe of 150 mm dia 3 mtr long for Pole Butts (6\\") and transportation of same to divisional store including loading and unloading |
| 392 | Supply, Installation, Testing and Commissioning of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS |
| 393 | Installation, Testing and Commissioning of 11 KV Horn Gap (fuse 3-phase 200A) as per Relevant IS (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 394 | Dismantling of 11 KV Horn Gap and transportation of same to divisional store including loading and unloading |
| 395 | Dismantling of 11 KV Horn Gap excluding transportation |
| 396 | Fixing and commissioning of of available/ old 11 KV Horn Gap |
| 397 | Supply,Installation, Testing and Commissioning of Gapless Surge Arrestor, 9 KV, 10 KA, Lighting Arrestor Set Heavy duty with Polymer Housing, Station type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V) |
| 398 | Installation, Testing and Commissioning of Gapless Surge Arrestor, 9 KV, 10 KA, Lighting Arrestor Set Heavy duty with Polymer Housing, Station type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V) (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 399 | Dismantling of 11 KV Gapless Surge Arrestor and transportation of same to divisional store including loading and unloading |
| 400 | Dismantling of 11 KV Gapless Surge Arrestor excluding transportation |
| 401 | Fixing and commissioning of of available/ old 11 KV Gapless Surge Arrestor |
| 402 | Supply, Installation, Testing and Commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V) |
| 403 | Installation, Testing and Commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V) (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 404 | Dismantling of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) and transportation of same to divisional store including loading and unloading |
| 405 | Dismantling of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) excluding transportation |
| 406 | Fixing and commissioning of of available/ old 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) |
| 407 | Supply, Installation, testing and commissioning of Suspension/Tension Clamp with eye hook |
| 408 | Installation, testing and commissioning of Suspension/Tension Clamp with eye hook (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 409 | Supply and Fixing of Mid Span Straight Through Jointing Kit for 11 kV ABC 50-95mm2 |
| 410 | Fixing of Mid Span Straight Through Jointing Kit for 11 kV ABC 50-95mm2 (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 411 | Supply and Fixing of Mid Span Straight Through Jointing Kit for 11 kV ABC 120-185mm2 |
| 412 | Fixing of Mid Span Straight Through Jointing Kit for 11 kV ABC 120-185mm2 (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 413 | Supply and Fixing of Straight Through Joints for Straight Through Jointing Kit for 70-120 mm², 11 KV Single Core Cable |
| 414 | Fixing of Straight Through Joints for Straight Through Jointing Kit for 70-120 mm², 11 KV Single Core Cable (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 415 | Supply and Fixing of Straight Through Joints for Straight Through Jointing Kit for 150-185 mm², 11 KV Single Core Cable |
| 416 | Fixing of Straight Through Joints for Straight Through Jointing Kit for 150-185 mm², 11 KV Single Core Cable (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 417 | Supply and Fixing of Straight Through Joints for Straight Through Jointing Kit for 240-300 mm² mm², 11 KV Single Core Cable |
| 418 | Fixing of Straight Through Joints for Straight Through Jointing Kit for 240-300 mm² mm², 11 KV Single Core Cable (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 419 | Supply and Fixing of Straight Through Joints for Straight Through Jointing Kit for 400-500 mm², 11 KV Single Core Cable |
| 420 | Fixing of Straight Through Joints for Straight Through Jointing Kit for 400-500 mm², 11 KV Single Core Cable (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 421 | Supply and Fixing of Straight Through Joints for Straight Through Jointing Kit for 630-800 mm², 11 KV Single Core Cable |
| 422 | Fixing of Straight Through Joints for Straight Through Jointing Kit for 630-800 mm², 11 KV Single Core Cable (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 423 | Supply and Fixing of Straight Through Jointing Kit upto 50-95 mm², 11 KV Three Core Cable |
| 424 | Fixing of Straight Through Jointing Kit upto 50-95 mm², 11 KV Three Core Cable (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 425 | Supply and Fixing of Straight Through Jointing Kit upto 120-185 mm², 11 KV Three Core Cable |
| 426 | Fixing of Straight Through Jointing Kit upto 120-185 mm², 11 KV Three Core Cable (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 427 | Supply and Fixing of Straight Through Jointing Kit upto 240-300 mm², 11 KV Three Core Cable |
| 428 | Fixing of Straight Through Jointing Kit upto 240-300 mm², 11 KV Three Core Cable(including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 429 | Supply and Fixing of Straight Through Jointing Kit upto 400- 500 mm², 11 KV Three Core Cable |
| 430 | Fixing of Straight Through Jointing Kit upto 400- 500 mm², 11 KV Three Core Cable (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 431 | Supply and Fixing of Straight Through Jointing Kit upto 25-50 mm², 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS |
| 432 | Fixing of Straight Through Jointing Kit upto 25-50 mm², 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 433 | Supply and Fixing of Straight Through Jointing Kit upto 70-95 mm², 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS |
| 434 | Fixing of Straight Through Jointing Kit upto 70-95 mm², 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 435 | Supply and Fixing of Straight Through Jointing Kit upto 120-150 mm², 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS |
| 436 | Fixing of Straight Through Jointing Kit upto 120-150 mm², 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 437 | Supply and Fixing of Straight Through Jointing Kit upto 185-240 mm², 3½ Core Cable, 1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS |
| 438 | Fixing of Straight Through Jointing Kit upto 185-240 mm², 3½ Core Cable, 1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 439 | Supply and Fixing of Straight Through Jointing Kit for 300 mm², 3½ Core Cable, 1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS |
| 440 | Fixing of Straight Through Jointing Kit for 300 mm², 3½ Core Cable, 1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS(including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 441 | Supply and Fixing of Straight Through Jointing Kit upto 400 mm², 3½ Core Cable, 1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS |
| 442 | Fixing of Straight Through Jointing Kit upto 400 mm², 3½ Core Cable, 1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 443 | Supply and Fixing of Straight Through Jointing Kit upto 500 -630 mm², 3½ Core Cable, 1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS |
| 444 | Fixing of Straight Through Jointing Kit upto 500 -630 mm², 3½ Core Cable, 1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 445 | Supply & Fixing of Straight Through Cable Jointing Kit for50 mm² AB (LT) Cable ( 3 x 50 + 1 x 16 + 1 x 35 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 446 | Fixing of Straight Through Cable Jointing Kit for 70 mm² AB (LT) Cable ( 3 x 70 + 1 x 16 + 1 x 50 insulated) mm² XLPE (1.1kV, 3+1 C, Al) (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 447 | Supply & Fixing of Straight Through Cable Jointing Kit for 70 mm² AB (LT) Cable ( 3 x 70 + 1 x 16 + 1 x 50 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 448 | Fixing of Straight Through Cable Jointing Kit for 50 mm² AB (LT) Cable ( 3 x 50 + 1 x 16 + 1 x 35 insulated) mm² XLPE (1.1kV, 3+1 C, Al) (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 449 | Supply & Fixing of Straight Through Cable Jointing Kit for 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 450 | Fixing of Straight Through Cable Jointing Kit for 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al) (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 451 | Supply and Fixing of 11 kV Heat Shrinkable Outdoor Cable End termination for 3C, 70 - 95 mm² |
| 452 | Fixing of 11 kV Heat Shrinkable Outdoor Cable End termination for 3C, 70 - 95 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 453 | Supply and Fixing of 11 kV Heat Shrinkable Outdoor Cable End termination for 3C, 120 mm² |
| 454 | Fixing of 11 kV Heat Shrinkable Outdoor Cable End termination for 3C, 120 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 455 | Supply and Fixing of 11 kV Heat Shrinkable Outdoor Cable End termination for 3C, 150 - 185 mm² |
| 456 | Fixing of 11 kV Heat Shrinkable Outdoor Cable End termination for 3C, 150 - 185 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 457 | Supply and Fixing of 11 kV Heat Shrinkable Outdoor Cable End termination for 3C, 240 - 300 mm² |
| 458 | Fixing of 11 kV Heat Shrinkable Outdoor Cable End termination for 3C, 240 - 300 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 459 | Supply and Fixing of 11 kV Heat Shrinkable Outdoor Cable End termination for 3C, 400 mm² |
| 460 | Fixing of 11 kV Heat Shrinkable Outdoor Cable End termination for 3C, 400 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 461 | Supply and Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 70 mm² to 95 mm² |
| 462 | Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 70 mm² to 95 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 463 | Supply and Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 120 mm² |
| 464 | Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 120 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 465 | Supply and Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 150 mm² to 240 mm² |
| 466 | Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 150 mm² to 240 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 467 | Supply and Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 300 mm² |
| 468 | Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 300 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 469 | Supply and Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 400 mm² |
| 470 | Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 400 mm² |
| 471 | Supply and Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 630 mm² |
| 472 | Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 630 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 473 | Supply and Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 800 mm² |
| 474 | Fixing of Heat Shrinkable Cable End termination kit for 11 kV 1C Cable 800 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 475 | Supply and Fixing of Heat Shrinkable Outdoor Cable Termination Kit for 11 kV ABC 50-95 mm² |
| 476 | Fixing of Heat Shrinkable Outdoor Cable Termination Kit for 11 kV ABC 50-95 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 477 | Supply and Fixing of Heat Shrinkable Outdoor Cable Termination Kit for 11 kV ABC 120-185 mm² |
| 478 | Fixing of Heat Shrinkable Outdoor Cable Termination Kit for 11 kV ABC 120-185 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 479 | Supply and Fixing of Heat Shrinkable End termination for 3½ C, 35-50 mm² |
| 480 | Fixing of Heat Shrinkable End termination for 3½ C, 35-50 mm²(including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 481 | Supply and Fixing of Heat Shrinkable End termination for 3½ C, 70-150 mm² |
| 482 | Fixing of Heat Shrinkable End termination for 3½ C, 70-150 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 483 | Supply and Fixing of Heat Shrinkable End termination for 3½ C, 35-50 mm² |
| 484 | Fixing of Heat Shrinkable End termination for 3½ C, 35-50 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 485 | Supply and Fixing of Heat Shrinkable End termination for 3½ C, 35-50 mm² |
| 486 | Fixing of Heat Shrinkable End termination for 3½ C, 35-50 mm² (including loading, unloading and transportation from Divisional store to different sites upto 4 KM-Material to be provided Departmentally) |
| 487 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. |
| 488 | All kinds of soil |
| 489 | Ordinary Rock |
| 490 | Providing of Stone Soling (Supplying, Laying, spreading and compacting stone aggregate of 90 mm to 45 mm |
| 491 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 492 | Centering and shuttering including strutting, propping etc. and removal of form work |
| 493 | Engaging labour for carrying out pruning/ branch cutting of trees |
| 494 | Unskilled |
| 495 | Semi-Skilled |
| 496 | Skilled |
| 497 | Shifting of Street Lights |
| 498 | Disconnection of Power Connections of Street Light from Bare Conductor and reconnection to LT AB Cable by use of Piercing Connectors including providing of IPCs. |
| 499 | Disconnection of Power Connections of Street Light from Bare Conductor and reconnection to LT AB Cable by use of Piercing Connectors excluding the supply cost of IPC. |
| 500 | Disconnection of Power Connections of Street Light from Bare Conductor and reconnection to SMD Box. The job includes providing of I/Y thimbles/lugs/nuts/bolts etc. |
| 501 | Relocation of Street Light from old Pole to new pole equipped with LT AB cable. The job includes diconnection from old pole, shifting of light to new pole and connecting to LT AB Cable by use of Piercing Connectors including providing of IPCs. |
| 502 | Relocation of Street Light from old Pole to new pole equipped with LT AB cable. The job includes diconnection from old pole, shifting of light to new pole and connecting to LT AB Cable by use of Piercing Connectors excluding the supply cost of IPC. |
| 503 | Relocation of Street Light from old Pole to new pole equipped with LT AB cable. The job includes diconnection from old pole, shifting of light to new pole and connecting to SMD Box. The job includes providing of I/Y thimbles/lugs/nuts/bolts etc. |
| 504 | Installation/Fixing of new Street light to SMD Box. The job includes providing of thimbles/lugs/nuts/bolts etc. |
| 505 | Installation/Fixing of new Street light to LT AB Cable by use of Piercing Connectors (excluding the cost of IPC). |
| 506 | Supply, laying, testing and commissioning of 3x1.0 mm² PVC insulated multistrand flexible copper wire for service connections from connection plate to the LED luminary individual circuit including loop & earthings laid properly. |
| 507 | Supply, Installation, testing & commissioning of Pre fabricate galvanized single way top bracket (1000 mm long with 48.3 OD GI Pipe) along with complete accessories/mountings |
| 508 | Installation, testing & commissioning of Pre fabricate galvanized single way top bracket (1000 mm long with 48.3 OD GI Pipe) |
| 509 | Dismantling of galvanized single way top bracket of street light along with complete accessories/mountings |
| 510 | Illumination/Decoration of Govt Buildings |
| 511 | Installation of LED String lights having LEDs distributed to form the Indian tricolor Flag Saffron (Top side), White (middle) & Green (Bottom end) for decoration / illumination of Govt Buildings. The job is inclusive of interconnection of strings, controllers and extention boards/wire if required along with watch and ward (LED Strings will be provided departmentally). |
| 512 | Providing on Hire basis - Proper rated MCB, Power cable with thimbles/lugs, extension cords/boards for connecting LED strings per building. The job also incudes laying, installation, testing and commissioning inclusive of watch and ward. |
| 513 | Installation, Testing & Commissioning (including Transportation, loading and unloading from Divisional store to different sites) of Single Phase Energy Meter including Clamps/Collar(Energy Meter to be provided Departmentally) |
| 514 | Installation, Testing & Commissioning (including Transportation, loading and unloading from Divisional store to different sites) of 3 phase Smart Energy Meter including Clamps/Collar(Energy Meter to be provided Departmentally) |
| 515 | Disconnection of Power Connections of Energy Meter(1 Phase / 3 Phase)/MSD Box from Bare Conductor and reconnection to LT AB Cable by use of Piercing Connectors including the providing of IPC |
| 516 | Disconnection of Power Connections of Energy Meter(1 Phase / 3 Phase)/MSD Box from Bare Conductor and reconnection to LT AB Cable by use of Piercing Connectors excluding the cost of IPC |
| 517 | Disconnection of Power cable of Energy Meter(1 Phase / 3 Phase) from Bare conductor and reconnection to SMD Box including providing of I/Y type lugs, thimbles of sizes etc |
| 518 | Connecting of New Energy Meters (Smart/Conventional) to MSD Box including providing of I/Y type lugs, thimbles of sizes etc |
| 519 | Relocation (Dismantling and re-fixing) of Energy Meters (1 Phase / 3 Phase) (Smart/Conventional) from one Pole to another incl mounting structure/back clamps & Nuts and Bolts. |
| 520 | Supply and fixing of Mounting arrangement of Single Meter as per the KPDCL Approved drawing no. CE/P&P/Dwg./2023/LTMA/001, Dated : 10-04-2023 |
| 521 | Supply and fixing of Mounting arrangement of Double Meters as per the KPDCL Approved drawing no. CE/P&P/Dwg./2023/LTMA/002 or 3, Dated : 10-04-2023 |
| 522 | Supply and fixing of Mounting arrangement of Three Meters as per the KPDCL Approved drawing no. CE/P&P/Dwg./2023/LTMA/004, Dated : 10-04-2023 |
| 523 | Supply and fixing of Mounting arrangement of Four Meters as per the KPDCL Approved drawing no. CE/P&P/Dwg./2023/LTMA/005, Dated : 10-04-2023 |
| 524 | Supply and fixing of Polypropylene weather proof outdoor type Meter Box for Single Phase Meter along withZinc plated clamps |
| 525 | Fixing of Polypropylene weather proof outdoor type Meter Box for Single Phase Meter along withZinc plated clamps including loading and unloading from Divisional Stores to Different Sites |
| 526 | Supply and fixing of Polypropylene weather proof outdoor type Meter Box for Three Phase Meter along with Zinc plated clamps |
| 527 | Fixing of Polypropylene weather proof outdoor type Meter Box for Three Phase Meter along with Zinc plated clamps |
| 528 | Supply, installation, testing and commissioning of Polypropylene weather proof outdoor type Meter Box for 4 Single Phase Meter along with Zinc plated clamps |
| 529 | Installation, testing and commissioning of Polypropylene weather proof outdoor type Meter Box for 4 Single Phase Meter along with Zinc plated clamps including loading and unloading from Divisional Stores to Different Sites |
| 530 | Supply, installation, testing and commissioning of 16 mm² Cable (2C), 1.1k V Grade, Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes |
| 531 | Installation, testing and commissioning of 16 mm² Cable (2C), 1.1 kV Grade, Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 532 | Supply, installation, testing and commissioning of 10 mm² Cable (2C), 1.1 kV Grade, Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes |
| 533 | Installation, testing and commissioning of 10 mm² Cable (2C), 1.1 kV Grade, Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 534 | Supply, installation, testing and commissioning of 35 mm² Cable (2C), 1.1kV Grade, Armoured,XLPE Insulated Stranded Conductor FRLS type |
| 535 | Installation, testing and commissioning of 35 mm² Cable (2C), 1.1kV Grade, Armoured,XLPE Insulated Stranded Conductor FRLS type (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 536 | Supply, installation, testing and commissioning of 16 mm² Cable (4C), 1.1 kV Grade, Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes |
| 537 | Installation, testing and commissioning of 16 mm² Cable (4C), 1.1 kV Grade, Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 538 | Supply, installation, testing and commissioning of 10 mm² Cable (4C) from LT Line to meter ,1.1k V Grade, Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes |
| 539 | Installation, testing and commissioning of 10 mm² Cable (4C), 1.1kV Grade, Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 540 | Supply, installation, testing and commissioning of 35 mm² Cable (4C), 1.1kV Grade, Armoured,XLPE Insulated Stranded Conductor FRLS type |
| 541 | Installation, testing and commissioning of 35 mm² Cable (4C), 1.1kV Grade, Armoured,XLPE Insulated Stranded Conductor FRLS type (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 542 | Supply, installation, testing and commissioning of 16 mm² Cable (2C), 1.1k V Grade, Un-Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes |
| 543 | Installation, testing and commissioning of 16 mm² Cable (2C), 1.1k V Grade, Un-Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 544 | Supply, installation, testing and commissioning of 10 mm² Cable (2C), 1.1k V Grade, Un-Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes |
| 545 | Installation, testing and commissioning of 10 mm² Cable (2C), 1.1k V Grade, Un-Armoured, PVC Insulated Stranded Conductor FRLS type including Aluminum Lugs/thimbles of sizes (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 546 | Supply, installation, Testing and commissioning of 11kV Pilfer resistant metering cubicle for 3phase 4 wire metering system made of MS Sheet steel thickness not less than 2mm duly power coat painted suitable for indoor as well as outdoor as per the site requirement. The cubicle shall be painted through 7-tank process. The External dimensions should be adequate. Panel having two compartments upper Meter compartment and lower CT/PT compartment. Provided with synthetic or semi synthetic gasket firmly glued to the sufrace, Dust, weather and Vermin proof and shall comply degree of protection IP 65 both the chambers having one sided hinged door arrangments. The metering panel shall be provided with two No MS channels of size 100 x 50 mm on the front and rear sides duly welded and 4 No of lifting hooks. It should be possible to take meter reading manually, through CMRI and computer without opening the LV chamber door. |
| 547 | Supply, installation, Testing and commissioning of Single Phase, Single core, single ratio, Epoxy resin Cast Current Transformers suitable for 11kV, copper wound primary type with rated burden 5VA and accuracy class 0.5 or better and conforming to IS2705 (part-I & II) amended upto date. ISF shall be upto 5. The CT ratio shall be as under: |
| 548 | 2.5 /5 for 25kVA DT |
| 549 | 5/5 for 63kVA DT |
| 550 | 7.5/5 for 100 kVA DT |
| 551 | 15/5 for 200 kVA DT |
| 552 | 20/5 for 250 kVA DT |
| 553 | 25/5 for 400 kVA DT |
| 554 | 50/5 for 630 kVA DT |
| 555 | 75/5 for 1 MVA DT |
| 556 | 100 /5 |
| 557 | Supply, installation, Testing and commissioning of 11kV/ 110 V, Three phase epoxy resin cast PT with rated burden 15VA per phase and accuracy class 0.5 or better and conforming to IS:3156 (part-I&II) amended upto date with proper colour coded identification. PTs shall be of uniform insulating and withstand separate source 23kV pf for one minute. |
| 558 | Supply and Fixing of Bus Bar details:CTs bus bar:- 40x6 mm copper strip or adequate size PTs bus bar: Copper wire 8 SWG or 30x0.6mm copper flat strip to connect PT terminal or adequate size duly insulated by the monoplast tape |
| 559 | Supply, installation, testing and commissioning of PVC Copper wire flexible multi-strand of required size for secondary connections for CT wiring the minimum wire size shall be 4 mm2 (RYB) and for PT wiring minimum wire size shall be 2.5 mm2 (RYB). |
| 560 | Supply and fixing of Copper Lugs preferably ring type duly crimped for termination of wires and tapes |
| 561 | Supply and fixing of Grounding bus of minimum 40mm copper, 25cm long fixed to the unit in HV chamber. TheCTs, PT meter and 11kV Cable sheath shall be grounded to the bus through groundingwire (green) of min size 10mm2 |
| 562 | Supply, installation, testing and commissioning of 3Ph, 3 Wire HT CT/PT operated Fully static Smart Tri-Vector Energymeters DLMS CompliantCategory 'C' with RS232 port for modem compatibility. 11kV/110V, Ph-Ph (3P,3W) metersfor measurement of different electrical parameters including Active Energy (kWh/ MWh), Reactive Energy (kVArh/MVArh), Apparent Energy (kVAh/ MVAh) etc. (make L&T, Secure,ABB) |
| 563 | Supply and fixing of Independent flexible PVC pipes for CT wiring and PT wiring of appropriate size from HTcompartment to meter compartment |
| 564 | Supply and fixing of Pedestal made out of MS Channel of size 75 x 40 mm or angle iron of size 65 x 65 x 5 mm,duly painted as per site requirement for mounting of metering panel including concretefoundation wherever required including cost of nuts and bolts |
| 565 | Supply and fixing of 3 Core 11 kV Aluminium cable XLPE armoured 35 mm2 including cost of clamp for its fixingwhere ever required. |
| 566 | Supply and fixing of Cable termination kits suitable for 3 x 35 mm2 XLPE Cable(indoor/outdoor) |
| 567 | Installation, Testing and commissioning of 11kV Pilfer resistant metering cubicle for 3phase 4 wire metering system made of MS Sheet steel thickness not less than 2mm duly power coat painted suitable for indoor as well as outdoor as per the site requirement. The cubicle shall be painted through 7-tank process. The External dimensions should be adequate. Panel having two compartments upper Meter compartment and lower CT/PT compartment. Provided with synthetic or semi synthetic gasket firmly glued to the sufrace, Dust, weather and Vermin proof and shall comply degree of protection IP 65 both the chambers having one sided hinged door arrangments. The metering panel shall be provided with two No MS channels of size 100 x 50 mm on the front and rear sides duly welded and 4 No of lifting hooks. It should be possible to take meter reading manually, through CMRI and computer without opening the LV chamber door. (Including unloading/loading/transportation from store to site) |
| 568 | Installation, Testing and commissioning of Single Phase, Single core, single ratio, Epoxy resin Cast Current Transformers suitable for 11kV, copper wound primary type with rated burden 5VA and accuracy class 0.5 or better and conforming to IS2705 (part-I & II) amended upto date. ISF shall be upto 5The CT ratio shall be as under:(Including unloading/loading/transportation from store to site) |
| 569 | 2.5 /5 for 25kVA DT |
| 570 | 5/5 for 63kVA DT |
| 571 | 7.5/5 for 100 kVA DT |
| 572 | 15/5 for 200 kVA DT |
| 573 | 20/5 for 250 kVA DT |
| 574 | 25/5 for 400 kVA DT |
| 575 | 50/5 for 630 kVA DT |
| 576 | 75/5 for 1 MVA DT |
| 577 | 100 /5 |
| 578 | Installation, Testing and commissioning of 11kV/ 110 V, Three phase epoxy resin cast PT with rated burden 15VA per phase and accuracy class 0.5 or better and conforming to IS:3156 (part-I&II) amended upto date with proper colour coded identification. PTs shall be of uniform insulating and withstand separate source 23kV pf for one minute. (Including unloading/loading/transportation from store to site) |
| 579 | Fixing of Bus Bar details:CTs bus bar:- 40x6 mm copper strip or adequate size PTs bus bar: Copper wire 8 SWG or 30x0.6mm copper flat strip to connect PT terminal or adequate size duly insulated by the monoplast tape (Including unloading/loading/transportation from store to site) |
| 580 | Installation, testing and commissioning of PVC Copper wire flexible multi-strand of required size for secondary connections for CT wiring the minimum wire size shall be 4 mm2 (RYB) and for PT wiring minimum wire size shall be 2.5 mm2 (RYB). (Including unloading/loading/transportation from store to site) |
| 581 | Installation, testing and commissioning of 3Ph, 3 Wire HT CT/PT operated Fully static Smart Tri-Vector Energymeters DLMS CompliantCategory 'C' with RS232 port for modem compatibility. 11kV/110V, Ph-Ph (3P,3W) metersfor measurement of different electrical parameters including Active Energy (kWh/ MWh), Reactive Energy (kVArh/MVArh), Apparent Energy (kVAh/ MVAh) etc. (make L&T, Secure,ABB) (Including unloading/loading/transportation from store to site) |
| 582 | Laying, installation, testing and commissioning of 3 Core 11 kV Aluminium cable XLPE armoured 35 mm2 including cost of clamp for its fixingwhere ever required. (Including unloading/loading/transportation from store to site) |
| 583 | Fixing of Cable termination kits suitable for 3 x 35 mm2 XLPE Cable(indoor/outdoor) (Including unloading/loading/transportation from store to site) |
| 584 | Supply, Installation, Testing and commissioning of 11 KV Heavy duty 600 Amp Link Set |
| 585 | Installation, Testing and commissioning of 11 KV Link Set (Including unloading/loading/transportation from store to site) |
| 586 | Dismantling of old/damaged 11 KV Link Set and transportation of same to divisional stores |
| 587 | Fixing & commissioning of available 11 KV Link Set excluding transportation charges |
| 588 | Supply, Installation, Testing and commissioning of G.I Mukey for Shackle Insulators with bolt of (50x6)mm |
| 589 | Installation, Testing and commissioning of G.I Mukey for Shackle Insulators with bolt of (50x6)mm (Including unloading/loading/transportation from store to site) |
| 590 | Supply, Installation, Testing and commissioning of G.I Pole Collars for different sizes |
| 591 | Installation, Testing and commissioning of G.I Pole Collars for different sizes |
| 592 | Supply & Fixing of GI Wire 6 SWG & 8 SWG |
| 593 | Fixing of GI Wire 6 SWG & 8 SWG (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally |
| 594 | Supply & Fixing of GI Strip |
| 595 | Fixing of GI Strip (including loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally |
| 596 | Supply, installation, commissioning and Testing of MCB's \\"C\\" Curve |
| 597 | 10 A SP |
| 598 | 16 A SP |
| 599 | 32 A SP |
| 600 | 32 A TPN |
| 601 | Installation, commissioning and Testing of MCB's \\"C\\" Curve (Material to be provided Departmentally) |
| 602 | 10 A SP |
| 603 | 16 A SP |
| 604 | 32 A SP |
| 605 | 32 A TPN |
| 606 | Supply, installation, commissioning and Testing of MCCB's |
| 607 | 40/63/100 Amps,36 kA, 4P adjustable |
| 608 | 160 Amps, 36 kA, 4P adjustable |
| 609 | 200 Amps, 36 kA, 4P adjustable |
| 610 | 250 Amps, 36 kA, 4P adjustable |
| 611 | 400 Amps, 36 kA, 4P adjustable |
| 612 | 630 Amps, 36 kA, 4P adjustable |
| 613 | Installation, commissioning and Testing of MCCB's (Material to be provided Departmentally) |
| 614 | 40/63/100 Amps,36 kA, 4P adjustable |
| 615 | 160 Amps, 36 kA, 4P adjustable |
| 616 | 200 Amps, 36 kA, 4P adjustable |
| 617 | 250 Amps, 36 kA, 4P adjustable |
| 618 | 400 Amps, 36 kA, 4P adjustable |
| 619 | 630 Amps, 36 kA, 4P adjustable |
| 620 | Dismantling of MCCB's and transportation of same to divisional stores |
| 621 | Dismantling, Repairing and reinstallation of MCCB's of various types/ratings |
| 622 | Installation and Commissioning of available MCCB |
| 623 | Boring by HDD Drilling (The job includes arrangement of Boring machine and other arrangements) |
| 624 | Providing and laying of GI Pipe with required no of collars for road crossing including termination points. |
| 625 | 150 mm (6'') |
| 626 | 100 mm (4\\") |
| 627 | 50 mm (2\\") |
| 628 | Providing and laying of HDPE Pipe |
| 629 | 180 mm Inner Dia 152 mm |
| 630 | 160 mm Inner Dia 148 mm |
| 631 | 120 mm Inner Dia 108 mm |
| 632 | 90 mm Inner Dia 78 mm |
| 633 | 50 mm Inner Dia 38 mm |
| 634 | Supply and laying of HDPE Pipe including excavation, Back filling and laying |
| 635 | Outer Dia 180 mm Inner Dia 152 mm |
| 636 | Outer Dia 160 mm Inner Dia 148 mm |
| 637 | Outer Dia 120 mm Inner Dia 108 mm |
| 638 | Outer Dia 90 mm Inner Dia 78 mm |
| 639 | Outer Dia 50 mm Inner Dia 38 mm |
| 640 | Supply, intallation, testing & Commissioning of 11 kV Isolator, Double Break,3-pole, 630 Amp, horizontal mounting Type, with Earth Switch |
| 641 | Intallation, testing & Commissioning of 11 kV Isolator, Double Break,3-pole, 630 Amp, horizontal mounting Type, with Earth Switch (including integeration with system, & loading, unloading and transportation from Divisional store to different sites upto 4 KM -Material to be provided Departmentally) |
| 642 | Dismantling of 11 kV Isolator, Double Break,3-pole, 630 Amp, horizontal mounting Type, with Earth Switch and transportation of same to divisional stores |
| 643 | Installation & commisioning of available 11 kV Isolator, Double Break,3-pole, 630 Amp, horizontal mounting Type, with Earth Switch including integeration with system, |
| 644 | Providing and laying of Guard netting with Span length of 41 mtrs |
| 645 | Providing and laying of Chemical Earthing (50mm dia G.I Pipe with Chemical bags) complete |
| 646 | Supply and installation of LT Line Spacers |
| 647 | 3 P, 4 wire |
| 648 | 2 P, 3 wire |
| 649 | Supply and installation of Aluminum Jointing Sleeves |
| 650 | 50 mm² |
| 651 | 100 mm² |
| 652 | 150 mm² |
| 653 | Supply, installation, testing and commissioning of Bulb Holder |
| 654 | E27(Screw type) Light Bulb Holder for Wall, 2 Amp 220-240 Volts Holder for Led/Electric Bulb |
| 655 | E27(Screw type) Light Bulb pendant holder, 2 Amp 220-241 Volts Holder for Led/Electric Bulb |
| 656 | Supply, Installation, testing and commissioning of Screw type LED bulbs |
| 657 | 30 watt |
| 658 | 15 watt |
| 659 | 9 watt |
| 660 | 7 watt |
| 661 | Installation, testing and commissioning of Screw type LED bulbs (Material to be provided departmentally) |
| 662 | 30 watt |
| 663 | 15 watt |
| 664 | 9 watt |
| 665 | 7 watt |
| 666 | Providing and commissioning of Switch Socket Combine 16 Amp |
| 667 | Supply, installation, laying, testing and commissioning of |
| 668 | 1.0 sq.mm Copper Wire Multi Strand, Class 2, Heat Resistant & Flame Retardant |
| 669 | 1.5 sq.mm Copper Wire Multi Strand, Class 2, Heat Resistant & Flame Retardant |
| 670 | 2.5 sq.mm Copper Wire Multi Strand, Class 2, Heat Resistant & Flame Retardant |
| 671 | 4.0 sq.mm Copper Wire Multi Strand, Class 2, Heat Resistant & Flame Retardant |
| 672 | 2.5 mm 3 core Copper Cable, Class 2, Heat Resistant & Flame Retardant |
| 673 | Transportation charges for material (including ST/PCC Poles/ACSR/DT etc) beyond 4 Km from store to different sites |
| 674 | Hiring of the DG set of various capacities. The job includes loading, unloading and transportation to & fro. The fuel charges will be paid as per actual fuel price & consumption of DG Set. |
| 675 | 10 kVA |
| 676 | 25 kvA |
| 677 | 50 kVA |
| 678 | 63 kVA |
| 679 | 100 kVA |
| 680 | Hiring of the vehicle (Pick Up etc) for whole day (fuel to be provided departmentally) for Carriage/Transportion of Material including loading and unloading from Divisional Stores to Different Sites or From one location to another Please Enable Macros to View BoQ information |