| 1 | Earthwork excavation in hard soil in F&P with initial lead and lift including rough dressing and levelling the ground etc. complete. |
| 2 | Conveying the excavated earth by mechanical means with 5 KM lead with loading and unloading etc. complete. |
| 3 | supplying and filling F&P with river sand with well watering and ramming etc. complete. |
| 4 | Supplying all materials, labour, T&P and providing cement concrete (1:3:6) using 4cm size CBHG netal etc. complete. |
| 5 | Supplying all materials, labour, T&P and providing fly ash brick masonry (23X11X8) in cement mortar (1:6) in F&P etc. complete. |
| 6 | Supplying all materials, labour, T&P and providing cement mortar (1:2:4) using 12mm size CBHG chips etc. complete. |
| 7 | Providing 12mm thick CP (1:6) to outside smooth surface etc. complete. |
| 8 | Two coat cement wash to inside and out side smooth surface with all cost of labour, T&P, materials etc. complete |
| 9 | Supplying all materaial, labour, T&P for applying two coats of weather coat seal coat with primer over the out side and inside wall with well watering and curing etc. complete. |
| 10 | Supplying all materials, labour, T&P for providing Mild steel tubular posts and trusses and base plates made out of ERW tubes, Grade YST 210 confirming to ISS no.1161/79 (3rd Revision) duly painted with red oxide primer etc. complete. |
| 11 | Supplying, fitting & fixing of precoated Galvanized iron profile sheet semi gloss of 1000mm width & total coated thickness 0.50mm in roof drilling hole in wind ties including fixing of ridges valleys, wind ties etc. complete including cost of sheet & all fitting (per 1 sq. Mtr.) |
| 12 | Supplying, fitting & placing uncoated HYSD reinforcement including cutting, bending, binding & placing the steel rods as per drawing & technical soecifications with cost of binding wire 18 to 20 gauges, etc. complete. |
| 13 | Rigid & smooth centering & shuttering for RCC/CC work etc. complete. |
| 14 | Supplying all materials, labour, T&P for painting two coats over iron work with any approved SE paint including all cost, labour, T&P etc. complete. |
| 15 | 25mm thick A.S. Flooring in C.C. (1:2:4) including punning etc. complete. Please Enable Macros to View BoQ information |