|
| 1 | Providing and applying two coats of water proof cement paint of approved manufacture and of approved colour to the plastered surfaces including scaffolding if necessary, cleaning and preparing the surface, watering for two days etc. |
| 2 | Providing and applying plastic emulsion paint of approved quality, colour and shade to old surface in three coats including scaffolding, preparing the surface. (excluding primer coat) etc. complete. |
| 3 | Providing and applying plastic emulsion paint of approved quality, colour and shade to new surface in three coats including scaffolding, preparing the surface. (excluding primer coat) etc. complete. |
| 4 | Providing and applying two coats of flat oil paint of approved colour to the old structural steel work and iron work previously painted in building including seaffolding, if necessary, cleaning and preparing the surface (excluding primer coat) etc. complete |
| 5 | Providing and applying three coats of water proof cement paint of approved manufacture and of approved colour to old plastered surfaces including scafolding if necessary, cleaning and preparing the surface, watering for two days etc. Complete |
| 6 | Providing andapplying white-wash in two coats on old / new plastered or masonry surface sand asbestos cement sheets including scaffolding and preparing the surface by brushing and brooming down etc. complete. |
| 7 | Scrapping the old plastered internal surface with sand paper and coating the entire surface with mixture of whiting or glue and linseed oil including scaffolding etc.complete as directed. |
| 8 | Providingandapplying Wax polish to the old wood working including knotting, preparing the surface, scaffolding etc. complete as directed |
| 9 | Cutting down trees including trunks and branches with girths above 30 cm to 60 cm and stacking the materials neatly with alllifts and lead of 1000 m as directed and earth fillingin the depression / pit if any. |
| 10 | Cutting down trees including trunks and branches with girths above 60 cm to 90 cm and stacking the material sneatly with alllifts and lead of 1000 m. as directed and earth fillingin the depression/pit if any. |
| 11 | Cutting down trees including trunks and branches with girths above 90 cm to 180 cm and stacking the materials neatly with all lifts and lead of 1000 m.as directed and earth fillingin the depression/pit if any. |
| 12 | Cutting down trees including trunks and branches with girths above 180cm to 270 cm and stacking the materials neatly with all liftsand lead of 1000 m.as directed and earth fillingin the depression/pit if any. |
| 13 | Cuttingdowntreesincludingtrunksandbrancheswithgirthsabove270cmto450cmandstackingthematerialsneatlywithallliftsandleadof1000m.asdirectedandearthfillingin the depression/pit if any |
| 14 | Cuttingdowntreesincludingtrunksandbrancheswithgirthsabove450cmandstackingthematerialsneatlywithallliftsandleadof1000m.asdirectedandearthfillinginthedepression/pit if any |
| 15 | Clearing grass and removal of rubbish upto adistance of 50 metres outside the periphery of the area . |
| 16 | Clearing and grubbing roadland including uprootingrankvegetation,grass,bushes,shrubs,saplingsandtreesgirthupto300mm,removalofstumpsoftreescutearlieranddisposalofunserviceablematerialsandstackingofserviceablematerialtobeusedorauctioneduptoaleadof1000metresincludingremovalanddisposaloftoporganicsoilnot exceeding 150 mm in thickness. |
| 17 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete. |
| 18 | Providing, fabricating and erecting at site of work the tubular steel structure (shed) as per standard design and specifications having various spans in between trusses and in multiples of standard length of bays as specified as per standard specifications, inclusive of cost of steel tubular trusses, tubular columns purlins, tie runners, foundation bolts, base plates, nuts and bolts, welding wherever required etc. as per detailed drawing inclusive of one coat of anticorrosive paint and two coats of oil painting of approved quality and shade etc. complete.Spec. No. : As directed by Engineer-in-charge. |
| 19 | Providing and fixing corrugated galvanised iron sheets of 0.63mm thick (24 B.W.G.) for roofing without wind tiles including fastening with galvanised iron screws and bolts, lead and bitumen washers as per drawing etc. complete.(Weight of 5.5 kg/sq.m.).SSR I.No. 38.04 |
| 20 | Providing and supplying skilled Superwiser with uniform dress code and with necessary safety equipment for various works related cleaninig of verious placess in mc |
| 21 | Providing and supplying unskilled labour with uniform dress code and with necessary safety equipment for various works related cleaninig of verious placess in mc |
| 22 | RWH - Shallow Percolation Pit providing, constructing 2.0m deep shallow depth percolation pit comprising of 1.0m dia pre-cast RCC rings, 300mm thick side filling around outside of RCC rings (annular space) with 40mm size boulders including filling of percolation pit up to 0.5m depth (from bottom up) with 25-75mm clean washed gravels followed by 0.5m depth of 10-25mm of clean washed stones followed by 0.5m of washed river fine aggregate (natural sand/crushed sand VSIgrade finely washed etc.) including netlon mesh between each gravel/fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) media layer including covering with RCC slab, manhole frame & cover, PVC rungs etc. including arrangement for inlet & outlet pipe, excavation & backfilling as shown in the drawing. The rate shallbe inclusive of all labour, material, wastage, scaffolding, transportation, taxes, including all leads, lifts at all levels. All material should be of approved make. All works complete as per the drawing, technical specification and direction of the Engineer in charge SSR I.No 48.46 |
| 23 | Supply Of Jcb Including Fuel And Driver. |
| 24 | Supply Of Tractor Including Fuel And Driver. Up to 5 km |
| 25 | Transportation of material obtained from debris of various sorts including necessary excavation/ loosing including loading, unloading and conveying and disposing as directed. |
| 26 | (a) For 1 Km. |
| 27 | (b) For 2 Km. |
| 28 | (c ) For 3 Km. |
| 29 | (d) For 4 Km. |
| 30 | (e) For 5 Km. Please Enable Macros to View BoQ information |