Name of Work:- A/mtc of Bansi Lal Park Bhiwani. 2025-2026(iii) Repairing of existing MS gate and grill including welding, alignment, painting, and other works contingent thereto: repairing of damaged stone work including fixing, polishing, and finishing: and repair/replacement of music sound box and related electricalfittings as required for proper functioning, and all other works contingent thereto in Bansi Lal Park Bhiwani. | Sl. No. | Item Description | |
| 1 | [1.LB008] LB008. Beldar | | 2 | [10.39.1]Providing and fixing of 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished flush. 1. Red sand stone | | 3 | [10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 | | 4 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) | | 5 | [13.29.1]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 1. In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete | | 6 | [5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) | | 7 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | | 8 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level | | 9 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | | 10 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | | 11 | Providing and fixing of Music Sound Box for musical fountain in Sh. B.D. Gupta Memorial park size 0.75x0.75x0.80m with M.S angle, jail, door system with new lock and legs fixing in fountain and priming coat and painting and repair ofexisting speaker, joint of cable, new cable, including labour, electrician, transportation charges complete in all respect. Please Enable Macros to View BoQ information |
|