|
| 1 | Civil Work |
| 2 | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) For preparation of Embakment/Bunds for pitching |
| 3 | Geotextile Filter (Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching.) |
| 4 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications |
| 5 | Excavation in Soil with Dozer with lead upto 1000 metres ( EExcavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) |
| 6 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications P.C.C. ln foundation in M - 15 With Batching Plant, Transit Mixer and Concrete Pump |
| 7 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specificationsRCC Grade M20Height upto 5 mUsing Concrete Mixer |
| 8 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as |
| 9 | Tubular Steel Railing on Precast RCC posts, 1.2 m high above ground level (Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing) |
| 10 | Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces) |
| 11 | Painting on Steel Surfaces (Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade) |
| 12 | Excavation for Kerb Stone Excavation in Soil with Dozer with lead upto 100 metres Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.All kinds of soil |
| 13 | Providing and laying at or near ground level Pre-cast kerb stone of M-25 grade in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement: 3 coarse sand) thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete as per direction of Engineer-in-charge. |
| 14 | Embankment Construction with Fly ash/Pond ash available from coal or lignite burning Thermal Plants as waste material. (Construction of embankment with fly ash conforming to table 1 of IRC: SP: 58 obtained from coal or lignite burning thermal power stations as waste material, spread and compacted in layer of 200mm thickness each at OMC, all as specified in IRC: SP: 58 and as per approved plans.) |
| 15 | Dry Rubble flooring |
| 16 | Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rankvegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm inthickness.) |
| 17 | Loading and unloading of stone boulder / stone aggregates / sand / kanker / moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) By mechanical transport including loading, unloading and stacking 50 % of total quantity to be carried away 1 km to 5 km or part thereof Total weed uprooted to be transported in tractor trolley or any other pickup vehicle to prescribed site (Nos. of Trips - 10) |
| 18 | Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications |
| 19 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications |
| 20 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : 13.46.1 Two or more coats on walls applied @ 1.25 ltr/10 sqm. over and including one coat of Special primer applied @ 0.75 ltr/10 sqm.Water Proof Cement Paint -Same as item no. ( 4 ) |
| 21 | Excavation in Soil with H. Ex. with lead upto 1000 metres ( EExcavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) |
| 22 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012, MORT&H Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged /selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2 mm, supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. |
| 23 | Planting Permanent Hedges including Digging of Trenches (Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm apart) |
| 24 | Supply at Site Well Decayed Farm Yard Manure (Supply at site of work well decayed farm yard manure, from any available source, approved by the engineer in charge including screening and stacking) Screened through sieve of I.S. designation 4.75 mm |
| 25 | Spreading of Sludge Farm Yard Manure or/and good Earth (Spreading of sludge farm yard manure or/ and good earth in required thickness (cost of sludge, farm- yard manure or/and good earth to be paid for separately)) |
| 26 | Grassing with ' Doobs' Grass (Grassing with 'Doobs' grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed) |
| 27 | Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year) |
| 28 | Tree Guard with MS Iron (Providing and fixing MS iron tree guard 60 cm dia and 2 metre high above ground level formed of 4 Nos (25 x 6 mm) and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two halves, bolted together with 8 mm dia and 30 mm long bolts including painting two coats with paint of approved brand over a coat of priming, complete in all respects.) |
| 29 | Silver/ Matt finished Stainless steel Swing type Outdoor pole hanging dustbin, Size: 40 Ltr |
| 30 | Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 - Height 5m to 10m For Pilasters, beams, columns etc. For lintels, manhole covers, shelves Using Batching Plant, Transit Mixer and Concrete Pump |
| 31 | Annual Running & Maintenance Work of the Following Item Such as - Repair &Maintenance Including Energy Charges, Chemicals (Cl,TCCA, SDIC) & Consumables, Beautification Equipement Required, Manpower (Mali-1, Watchman-1) This O&M Work May Be Continue For 5 Years Please Enable Macros to View BoQ information |