|
Bids Are invited for Sitc Of 13 Passenger Lift And Camc Supply Of One No 13 Passengers Lift - Supply Of One No. 13 Passenger Electric Traction Lift In The Existing Lift Well At Site Conforming To The Latest Lift Act And Latest Is Code And Lift Practices Serving 7 Stops 7 Landings (G+6) Of Pacity Not Less Than 884 Kg, Having Speed 1.0 Meters Per Second With Vf Regenerative (Closed Loop) Drive Suitable For Operation On 3 Phase, 415/440. V, 50Hz. A.C Supply, Automatic Push Button Control With Latest Version Control Panel, Duplex Full Collective Control System With Or Without Attendant And All Other Equipment Like, Car, Car Doors, Landing Doors, Indicators, Panel, Flooring, Guide Rails, Automatic Rescue Device, Safety Devices Etc. As Per Specifications Attached Including Miscellaneous Items Like Supports For Guide Rails, Scaffolding, Minor Building Works Like Making Holes, Sockets Etc. & Making Good The Same Etc Complete As Required. ( As Per Bsnl Guidelines) , Itc Of One No 13 Passengers Lift - Installation, Testing And Commissioning Of One No. 13 Passenger Electric Traction Lift In The Existing Lift Well At Site Conforming To The Latest Lift Act And Latest Is Code And Lift Practices Serving 7 Stops 7 Landings (G+6) Of Capacity Not Less Than 884 Kg, Having Speed 1.0 Meters Per Second With Vf Regenerative (Closed Loop) Drive Suitable For Operation On 3 Phase, 415/440. V, 50Hz. A.C Supply, Automatic Push Button Control With Latest Version Control Panel, Duplex Full Collective Control System With Or Without Attendant And All Other Equipment Like, Car, Car Doors, Landing Doors, Indicators, Panel, Flooring, Guide Rails, Automatic Rescue Device, Safety Devices Etc. As Per Specifications Attached Including Miscellaneous Items Like Supports For Guide Rails, Scaffolding Works, Minor Civil Works Including Modification Of Landing Openings, If Required And Making Holes, Sockets Etc. & Making Good The Same Complete As Required.Complete As Required. , Comprehensive Maintenance During First Year - During First Year Of Operation After Warranty Period. , Comprehensive Maintenance During 2Nd Year - During 2Nd Year Of Operation After Warranty Period. , Comprehensive Maintenance During 3Rd Year - During 3Rd Year Of Operation After Warranty Period. Total Quantity : 38
|