|
| 1 | DE-CENTERALIZE MATERIAL |
| 2 | Holding Clamp for SP-55 with N/B |
| 3 | LOOP INSULATOR |
| 4 | 11 KV CABLE TIES FOR PIN INSULATOR |
| 5 | 11 KV IPC FOR COVERED TOCOVERED COND. |
| 6 | 11 KV IPC FOR COVERED TO BARECONDUCTOR |
| 7 | 11 KV MID SPAN JOINTING KIT |
| 8 | IPC WITH AL. BAIL FOR EARTHING 11KV |
| 9 | 11 KV Tension With Ball and IPC |
| 10 | 11 KV AL 59 ACS Cover Conductor |
| 11 | Labour Charge: |
| 12 | FABRICATION OF STEEL |
| 13 | EXCAVATION OF PIT FOR STAY SET |
| 14 | ERECTION OF 11 KV STAY SET |
| 15 | GROUTING OF STAY SET |
| 16 | EXCAVATION OF PIT FOR POLE |
| 17 | ERECTION OF SINGLE SP-55 POLE |
| 18 | CARTAGE SP-55 POLE, 0-20 KM |
| 19 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 20 | HEADLOAD CARTAGE SP-55 POLE(1-3 KM) |
| 21 | HEADLOAD CARTAGE OFMATERIAL(1-3 KM) |
| 22 | BACK CARTAGE OF PETTYMATERIAL,0-20 KM |
| 23 | FIXING OF IPC WITH AL. BAIL FOR EARTHING |
| 24 | FIXING OF 11KV 90KN TENSION CLAMPB&IPC |
| 25 | FIXING OF 11 KV IPC FOR CC TO CCCOND. |
| 26 | FIXING OF 11 KV IPC FOR CC TO BARECOND. |
| 27 | FIXING OF 11 KV MID SPAN JOINTINGKIT |
| 28 | FIXING OF 11 KV PIN INSULATOR |
| 29 | GROUTING AND MUFFING OF POLES |
| 30 | LAYING, SAGGING OF COVERED CONDFOR 11KV |
| 31 | 11 KV CABLE TIES FOR PIN INSULATOR |
| 32 | REMOVING OLD CONDUCTOR BYOPENING JUMPER |
| 33 | LOOPING AND CHOPPING OF TREEBRANCHES Please Enable Macros to View BoQ information |