|
Tender for Surveying And Preparation Of Dpr On Water, Waste Water And Environment Conservation Measures At Major Railway Stations/Colonies Of Ngp Division. (Itr, Tmr, G, Dgg, Nab, Caf, Nir & Cwa). , - Survey & Preparation Of Dpr For Water And Wastewater Management • Survey And Estimation Of Daily Water Demand Based On Passenger And Staff Usage, Washing, And Operational Requirements. • Conducting Survey And Water Audit For Existing Water Supply Arrangements For Stations And Colonies. • Strategies And Action Plan For Optimization Of Water Usage And Minimization Of Water Wastage. • Quantification Of Wastewater Generation And Identification Of Discharge Points. • Evaluation Of Existing Wastewater Treatment (If Any) And Reuse Possibilities. • Design A Wastewater Treatment Plant Compliant To The Prevailing Ngt/Cpcb Norms. • Preparation And Submission Of Dpr Including Technical Design, Item-Wise Cost Estimates Based On Prevailing Schedule Rates, Non- Scheduled Items, And Boqs Of Civil, Electromechanical, Electrical Etc. For Each Proposed Intervention. , - Development Of Miyawaki Forest • Assessment And Identification Of Potential Area For Development Of Miyawaki Forest. • Complete Design Of Miyawaki Forest Using Shrubs, Trees Etc. As Per Basic Principles Of Miyawaki Along With Soil Preparation Methodology. • Assessment Of Total Carbon Sequestration Potential. • Based On The Site Surveys Three Potential Stations Will Be Selected For Development Of Miyawaki Forest. • Preparation And Submission Of Dpr Including Technical Design, Item-Wise Cost Estimates Based On Prevailing Schedule Rates, Non-Scheduled Items, And Boqs Of Civil, Electromechanical, Electrical Etc. For Each Proposed Intervention. , - Rainwater Harvesting • Identification Of Suitable Rooftop And Surface Catchments. • Design Of Rainwater Harvesting Structures, Recharge Wells, And Percolation Pits. • Integration Of Drainage Networks For Effective Collection And Infiltration. • Preparation And Submission Of Dpr Including Technical Design, Item-Wise Cost Estimates Based On Prevailing Schedule Rates, Non- Scheduled Items, And Boqs Of Civil, Electromechanical, Electrical Etc. For Each Proposed Intervention.
|